Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: August 24, 2010 Client: Foglia Salvatore Sr Foglia Florence | Permit status: Completed | Permit id: 297897 | |||||
Electrical permit Date: August 24, 2010 Client: Foglia Salvatore Sr Foglia Florence | Permit status: Completed | Permit id: 297897 | |||||
SCORE 100 Install new 1 amp service with bonding install receptacles switches 18 light fixtures 1 gfi 1 2 line per 2008 nec code Date: August 24, 2010 Contractor: Filippone Alfonso Jr Client: Furxhiu Florian Furxhiu Elona | Permit type: Electrical permit | Permit status: Completed | Completion date: December 5, 2015 | Permit id: 297897 | |||||
Install hardwood floor, change kitchen cabinets, change windows and doors into existing opening,sheetrock kitchen and bathroom Date: June 2, 2017 Client: Furxhiu Florian Furxhiu Elona | Permit type: Alteration permit | Permit status: Active | Completion date: June 23, 2017 | Permit id: 788936 | |||||
SCORE 100 Rewire sfd with all new switches, outlet, lighting and smoke detectors with an existing service as per nec 2008 (south district) Date: June 5, 2017 Contractor: Tech Electric Services Inc Client: Furxhiu Florian Furxhiu Elona | Permit type: Electrical permit | Permit status: Active | Completion date: June 5, 2017 | Permit id: 789329 | |||||
SCORE 100 Amend ap # 789329 to reflect new owner, per owners request Date: June 19, 2017 Contractor: Tech Electric Services Inc Client: Furxhiu Florian Furxhiu Elona | Permit type: Administrative permit | Permit status: Active | Completion date: June 19, 2017 | Permit id: 789334 | |||||
Frame the interior of the house. Insulate and sheetrock the entire house. Build a deck in the back of the yard. Make a pilot hhouse. Build the kitchen and island. Tile the bathroom and basementinstall hardwood floors throughout. Convert a front window to a sliding door and make juliet balcony, point the house. Repair the front steps install basement window Date: September 28, 2017 Client: Furxhiu Florian Furxhiu Elona | Permit type: Zoning permit | Permit status: Completed | Completion date: September 28, 2017 | Permit id: 795989 | |||||
For alterations and an addition to an existing, attached, light-framed structure to include roof deck, access pilot house, balcony installation, front stair repair, basement window installation, and wall floor ceiling finishing throughout. Separate permits to be required for electrical work and installation of rear deck. Date: September 28, 2017 Client: Furxhiu Florian Furxhiu Elona | Permit type: Addition permit | Permit status: Active | Completion date: October 19, 2017 | Permit id: 795992 | |||||
SCORE 100 Installing complete hvac system Date: August 22, 2017 Contractor: Condino Andrew Client: Furxhiu Florian Furxhiu Elona | Permit type: Mechanical permit | Permit status: Active | Completion date: August 22, 2017 | Permit id: 803670 | |||||
SCORE 100 Install 2 toilets, 2 lavs, 2 tub, 1 kitchen sink and 1 washer. The installation will comply with the philadephia plubming code 2004 Date: September 7, 2017 Contractor: Ferko Plumbing Client: Furxhiu Florian Furxhiu Elona | Permit type: Plumbing permit | Permit status: Active | Completion date: September 28, 2017 | Permit id: 814268 |