Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Roof mount residential solar pv for existing sfd (no meter upgrade). 9-16-2014 panel change out added vam persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 7, 2014 Contractor: Solar Symphony Construction Inc Permit type: Addn | Permit status: Completed | Completion date: October 3, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 89 Kitchen remodel to include 1 sqft drywall repair, new plumbing fixtures same location. (6) recessed lights. (3) pendant lights 9 8 17-plan change and update scope. See c of a. Kp Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Rough frame Date: November 14, 2017 Permit status: Pass | Permit id: Pds2017-Resalt- | |||||
SCORE 89 Roof mount residential solar pv for existing sfd (no meter upgrade). 9-16-2014 panel change out added vam persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 7, 2014 Contractor: Solar Symphony Construction Inc Permit type: Res roof mt solar pv | Permit status: Completed | Permit id: Pds2014-Resalt- | Parcel: 1233106300 |