Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
![]() Permit id: 03-08-099 | Parcel: 046413005000 | |||||
![]() Permit id: 11-07-094 | Parcel: 046413005000 | |||||
![]() Permit id: 13-06-106 | Parcel: 046413005000 | |||||
SCORE 99 Install water meter. Sidewalk, if not already installed, must be constructed to the curb return in both directions. New sfd, newport unit 3 ![]() ![]() Permit id: 03-0764 | Parcel: 046413005000 | |||||
SCORE 100 1. Pool- access is limited to site driveway. 2. A pre-inspection is required! All work shall comply with city standards and details 3. Contractor shall use appropriate stormwater bmps to avoid any stormwater contamination 4. Final engineering encroachment inspection is required prior to building permit final inspection. 5. Any damage to the curb, gutter, sidewalk or landscape will be repaired prior to finalization of encroachment permit and deposit refund. 6. Any damage to the curb, gutte ![]() ![]() Permit id: 13-0243 | Parcel: 046413005000 |