Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: August 25, 2016 Contractor: Cool Air Solutions Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 26, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 27, 2016 Contractor: Sunrun Installation Services Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 11, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: October 7, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 27, 2016 Contractor: Sunrun Installation Services Inc Permit type: Res roof mt solar pv | Permit status: Completed | Permit id: Pds2016-Resalt- | |||||
SCORE 93 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: August 25, 2016 Contractor: Cool Air Solutions Inc Permit type: Mechanical - hvac change out | Permit status: Completed | Permit id: Pds2016-Resalt- |