Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning/use permit Date: December 11, 2014 Client: Metropolitan Property Hol | Permit status: Revoked | Permit id: 574282 | |||||
Zoning/use permit Date: June 28, 2016 Client: Metropolitan Property Hol | Permit status: Completed | Permit id: 581397 | |||||
Appeal against l&i for revocation of permit #581397. Date: August 21, 2015 Client: Metropolitan Property Hol | Applicant: Alan Nochumson | Permit type: Appeal | Permit status: Granted | Completion date: June 16, 2016 | Permit id: 25925 | |||||
Zoning use permit Date: June 28, 2016 Client: Metropolitan Property Hol | Permit status: Completed | Permit id: 581397 | |||||
Zoning permit Date: January 24, 2017 Client: Metropolitan Property Hol | Permit status: Completed | Permit id: 748322 | |||||
Zoning use permit Date: December 11, 2014 Client: Metropolitan Property Hol | Permit status: Revoked | Permit id: 574282 | |||||
Appeal against l&i for revocation of permit #581397. Date: August 21, 2015 Client: Metropolitan Property Hol | Applicant: Alan Nochumson | Permit type: Appeal | Permit status: Granted | Completion date: June 16, 2016 | Permit id: 25925 | |||||
SCORE 93 Install drain and water lines for 4 toilets, 4 vanities, 2tubs, 2 kitchen, 2garbage disposal, 2laundry install 5" lateral, 5"curb trap, 4" house drain , 1" combination water distribution line. Date: April 25, 2017 Contractor: Oleg Kapkanov Client: Metropolitan Property Hol | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 29, 2017 | Permit id: 777980 | |||||
SCORE 93 Install drain and water lines for 4 toilets 4 vanities 2 tubs 2 kitchen 2 laundry install 5" lateral 5" curb trap 4" house drain 2-1" combo water dist lines (this permit for rer unit on stiles st. Jd) Date: April 25, 2017 Contractor: Oleg Kapkanov Client: Metropolitan Property Hol | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 29, 2017 | Permit id: 777982 | |||||
SCORE 89 Installation of (2) hvac units (including ductwork and all associated accessories). Self-contained units. No penetration of fire rated walls. Two family dwellings Date: May 5, 2017 Contractor: Sanks Mechanical Client: Metropolitan Property Hol | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 29, 2017 | Permit id: 781017 | |||||
SCORE 86 Install 200amp service complete with 3 meters, 3 panels & grounding, install 48 lights, receptacles, switches, gfcis, smoke detectors & carbon monoxide detectors, door bell, phone & cable as per 2008 nec (north district) Date: May 24, 2017 Contractor: Hassan Electric Llc Client: Metropolitan Property Hol | Permit type: Electrical permit | Permit status: Completed | Completion date: August 9, 2017 | Permit id: 786312 | |||||
For the complete demolition of an existing attached structure and the erection of two (2) attached structures (building 1 and building 2). Size and location as shown in application. For use as multi-family household living [two (2) dwelling units in building 1 and two (2) dwelling units in building 2; total four (4) dwelling units]. Date: December 11, 2014 Client: Metropolitan Property Hol | Permit type: Zoning/use permit | Permit status: Revoked | Completion date: December 11, 2014 | Permit id: 574282 | |||||
For the complete demolition of an existing attached structure and the erection of two (2) attached structures (building 1 and building 2) with a roof deck and pilot house (for access to roof deck only) on each building. Size and location as shown in application. For use as multi-family household living [two (2) dwelling units in building 1 and two (2) dwelling units in building 2; total four (4) dwelling units]. Date: June 28, 2016 Client: Metropolitan Property Hol | Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 28, 2016 | Permit id: 581397 | |||||
For the partial first floor front demolition reduction of previously approved building #2 and the reduction and reconfiguration of the pilot houses on buildings #1 & #2. Size and location as shown in application. No change to previously approved use as multi-family household living [two (2) dwelling units in building 1 and two (2) dwelling units in building 2; total four (4) dwelling units] per permit # 581397. Date: January 24, 2017 Client: Metropolitan Property Hol | Permit type: Zoning permit | Permit status: Completed | Completion date: June 21, 2017 | Permit id: 748322 | |||||
Construction of two attached, three story structures, located on single lot. Each building shall contain two family household living. Date: February 17, 2017 Client: Metropolitan Property Hol | Permit type: New construction permit | Permit status: Completed | Completion date: August 29, 2017 | Permit id: 748326 | |||||
SCORE 93 For the installation of a two - one (1) inch combined service line for a fire & domestic supply line for a two family dwelling. Multipurpose residential fire sprinkler system designed in accordance with nfpa 13d. Date: April 7, 2017 Contractor: Harring Fire Protection Llc Client: Metropolitan Property Hol | Permit type: Suppression permit | Permit status: Completed | Completion date: August 29, 2017 | Permit id: 769415 |