SCORE 100 Excavate to clear duct obstructions between mh24 and mh2515. Rod and place muletape as shown on verizon job number 1a0l4qs Date: September 20, 2013 Contractor: Verizon Washington Dc Permit type: Excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: December 19, 2013 | Permit id: Pa87018 | |||||
SCORE 93 Excavate to clear duct obstructions between mh24 and mh2515. Rod and place muletape as shown on verizon job number 1a0l4qs Date: September 20, 2013 Contractor: Verizon Washington, Dc Permit type: Excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: December 19, 2013 | Permit id: Pa87018 | |||||
SCORE 95 Construction staging area Date: March 27, 2012 Contractor: Verizon Verizon Permit status: Expired | Expiration date: April 26, 2012 | Permit id: Pa10053817 | |||||
SCORE 66 Construction staging area Date: August 4, 2011 Contractor: Robert Jouvenal Permit status: Expired | Expiration date: January 13, 2012 | Permit id: Pa10032581 | |||||
SCORE 66 Construction staging area Date: January 24, 2012 Contractor: Robert Jouvenal Permit status: Expired | Expiration date: July 11, 2012 | Permit id: Pa10032581-R1 | |||||
SCORE 66 Construction staging area Contractor: Ethan Laplante Permit status: Notpaid | Expiration date: June 27, 2011 | Permit id: 0 | |||||
SCORE 66 Other work related occupancy Date: June 23, 2011 Contractor: Ethan Laplante Permit status: Expired | Expiration date: July 21, 2011 | Permit id: Pa10029596 | |||||
SCORE 98 Paving; ada curb ramp, paving; curb & gutter(s), paving; driveway(s) new- commercial, landscaping; tree removal, excavation; manhole frame and cover (adjust) Contractor: Gordon Permit status: 12 | Expiration date: May 1, 2018 | Permit id: 0 | |||||
SCORE 98 This project provides a revised location of the interim level 5 fence at the perimeter of the campus. By 2018, the interim level 5 security fence will be reconfigured to protect the eastern portions of the campus. This will include construction of a new fence line from the northern property line through gate 1 checkpoint to new checkpoint b. The new interim fence will connect to existing level 5 fence adjacent to old gate b. This project will also include the demolition of existing interior fencing and the construction of trailers and guard post along the fence line. The approved gate 3 design as shown on attached "for information only sheet" has been redesigned and relocated as shown in this set. It is anticipated that no new stormwater management and or bmp facilities will be required to be a part of this project. Date: March 20, 2017 Contractor: Gordon Permit type: Paving; ada curb ramp, paving; curb & gutter(s), paving; driveway(s) new- commercial, landscaping; tree removal, excavation; manhole frame and cover (adjust) | Permit status: Assigned | Expiration date: May 1, 2018 | Permit id: 0 | |||||
SCORE 98 This project provides a revised location of the interim level 5 fence at the perimeter of the campus. By 2018, the interim level 5 security fence will be reconfigured to protect the eastern portions of the campus. This will include construction of a new fence line from the northern property line through gate 1 checkpoint to new checkpoint b. The new interim fence will connect to existing level 5 fence adjacent to old gate b. This project will also include the demolition of existing interior fencing and the construction of trailers and guard post along the fence line. The approved gate 3 design as shown on attached "for information only sheet" has been redesigned and relocated as shown in this set. It is anticipated that no new stormwater management and or bmp facilities will be required to be a part of this project. Contractor: Gordon Permit status: Assigned | Expiration date: May 1, 2018 | Permit id: 0 | |||||
SCORE 93 Excavate to clear duct obstructions between mh24 and mh2515. Rod and place muletape as shown on verizon job number 1a0l4qs Date: October 1, 2013 Contractor: Verizon Washington, Dc Permit status: Permit expired | Expiration date: December 19, 2013 | Permit id: Pa87018 | |||||
SCORE 98 Paving; ada curb ramp, paving; curb & gutter(s), paving; driveway(s) new- commercial, landscaping; tree removal, excavation; manhole frame and cover (adjust) Contractor: Gordon Permit status: 12 | Expiration date: May 1, 2018 | Permit id: 0 | |||||
SCORE 66 Construction staging area Contractor: Ethan Laplante Permit status: Notpaid | Expiration date: June 27, 2011 | Permit id: 0 | |||||
SCORE 95 Place 1 verizon pole at corner of access road and firth sterling av se as shown on job 4a03548 Date: March 5, 2013 Contractor: Verizon Permit type: Over head work; pole installation (single or first one) | Permit status: Permit expired | Expiration date: June 6, 2013 | Permit id: Pa80188 | |||||
SCORE 98 This project provides a revised location of the interim level 5 fence at the perimeter of the campus. By 2018, the interim level 5 security fence will be reconfigured to protect the eastern portions of the campus. This will include construction of a new fence line from the northern property line through gate 1 checkpoint to new checkpoint b. The new interim fence will connect to existing level 5 fence adjacent to old gate b. This project will also include the demolition of existing interior fencing and the construction of trailers and guard post along the fence line. The approved gate 3 design as shown on attached "for information only sheet" has been redesigned and relocated as shown in this set. It is anticipated that no new stormwater management and or bmp facilities will be required to be a part of this project. Contractor: Gordon Permit status: Assigned | Expiration date: May 1, 2018 | Permit id: 0 | |||||
SCORE 79 Construction staging area Date: October 8, 2013 Contractor: Dci Inc Permit status: Permit expired | Expiration date: November 20, 2013 | Permit id: Pa10117390 |