Building Permits at 2701 26th Ave Sw Seattle WA


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 2701 26th Ave Sw Seattle WA over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
95
Shoreline exemption extension to 3014008:port of seattle,terminal 5, to support the pile systems repair and maintenance program
Date:  December 11, 2014

Applicant: Sloan, Jon | Permit type: Site development | Permit status: Ap closed | Permit id: 6450269
2014/12/110952701 26th Ave Sw Seattle WaPort Of Seattle Engineering
Strengthen container rail; remove and replace existing fender system; slope stabilization and toe wall installation; berth dredging; and associated electrical and utility work at existing marine terminal facility port of seattle terminal 5.

Applicant: Farr, Ann | Permit type: Construction | Permit status: Initial information colle | Current use: Industrial | Permit id: 6448272
0952701 26th Ave Sw Seattle Wa
Strengthen container rail; remove and replace existing fender system; slope stabilization and toe wall installation; berth dredging; and associated electrical and utility work at existing marine terminal facility port of seattle terminal 5.

Applicant: Farr, Ann | Permit type: Construction | Permit status: Initial information colle | Current use: Industrial | Permit id: 6448272
0952701 26th Ave Sw Seattle Wa
SCORE
95
Construct alterations and additions to existing marine cargo terminal (port of seattle terminal 5), occupy per plan.
Date:  July 7, 2016
Value:   $88,035,080

Applicant: Farr, Ann | Permit type: Construction | Permit status: Application accepted | Current use: Industrial | Permit id: 6448272
2016/07/0788035080952701 26th Ave Sw Seattle WaPort Of Seattle Engineering
SCORE
95
Installing branch circuits to circulation fans for terminal 5. Fans furnished and installed by mechanical contractors.
Date:  July 9, 2007

Permit type: Electrical | Permit status: Permit finaled | Completion date: July 26, 2007 | Expiration date: July 9, 2008 | Current use: Commercial | Permit id: 6145844
2007/07/090952701 26th Ave Sw Seattle WaD W Close Company Incorporated
SCORE
100
Install two radiant heaters for the gen-set and tire shop.
Date:  February 16, 2007
Value:   $10,000

Applicant: Wilme, Chuck | Permit type: Mechanical | Permit status: Permit finaled | Completion date: August 3, 2007 | Expiration date: August 16, 2008 | Current use: Commercial | Permit id: 6128213
2007/02/16100001002701 26th Ave Sw Seattle WaPacific Air Control Inc
SCORE
100
Install (6) propeller fans in power shop, container, & chasis shops, install (2) inline fans for high bay.
Date:  January 16, 2007
Value:   $7,000

Applicant: Wilme, Chuck | Permit type: Mechanical | Permit status: Permit finaled | Completion date: August 3, 2007 | Expiration date: July 16, 2008 | Current use: Commercial | Permit id: 6125517
2007/01/1670001002701 26th Ave Sw Seattle WaPacific Air Control Inc
SCORE
95
The port is requesting a shoreline substantial development permit exemption for site exploration and investigation activities that are necessary to prepare accurate geotechnical and structural calculations required to support the pending application of project number 6448272. The investigative work proposed involves installation of two sets of test piles with pile instrumentation for the purpose of characterizing and verifying structural and geotechnical pile capacity, piling size, drivability, pile lengths, and pile load deformation response. A secondary goal of the test pile program is reducing cumulative construction noise by minimizing pile lengths and pile numbers as a result of more detailed geotechnical and structural knowledge from the tests. These activities are exempt under smc 23. 60a. 020. C. 12.

Applicant: Farr, Ann | Permit type: Site development | Permit status: Information collected | Permit id: 6494895
0952701 26th Ave Sw Seattle WaPort Of Seattle Engineering
SCORE
95
Shoreline exemption for port of seattle, terminal 5 - to support the pile systems repair and maintenance program. All reviews done under 6612142.
Date:  August 8, 2017

Applicant: Sloan, Jon | Permit type: Site development | Permit status: Ap closed | Completion date: August 30, 2017 | Permit id: 6612156
2017/08/080952701 26th Ave Sw Seattle WaPort Of Seattle Engineering
SCORE
95
Shoreline substantial development application to allow improvements to existing container cargo facility (terminal 5). Project includes removal and replacement of portions of pier structure, including crane rails, decking and piling, dredging of 48,0 cu. Yds. Of sediment, and under pier slope stabilization. Project also includes installation of an electrical substation and utility upgrades. Environmental impact statement is being prepared by the port of seattle.
Date:  July 22, 2016
Value:   $100,000,000

Applicant: Meyer, Paul | Permit type: Sepa threshold determination, shoreline conditional use, shoreline development | Permit status: Application accepted | Current use: Industrial | Permit id: 3019071
2016/07/22100000000952701 26th Ave Sw Seattle WaPort Of Seattle Engineering
SCORE
90
The proposed project involves the removal of derelict in-water structures at the north end of terminal 5 in elliott bay. Work includes the removal of approximately 2,2 creosote-treated timber piles, associated structural materials (bents, pile caps, sacrificial elements, deck boardsing), andany identified debris that interferes with piling removal. Piling removal will take place between 10 1 2017 and 2 15 2018 using vibratory and mechanical methods. Piles will not be replaced. In addition to removing timber piling, the project will also include removal of fill material from behind a vertical sheetpile wall adjacent to the shipway and pier 26. Approximately 25 cubic yards of fill will be removed andthe slope recontoured to 2:1, then armored with 2 of rip-rap from the mudline up to +15mllw. Slopes above +15mllw will be stabilized with hydroseeding and or woodchips. Following fill removal, the sheet pile wall will be cut off at the mudline. The purpose for removing the sheetpile wall is t

Applicant: Sloan, Jon | Permit type: Demolition | Permit status: Initial information colle | Current use: Industrial | Permit id: 6602251
0902701 26th Ave Sw Seattle WaPort Of Seattle Facilities Dev
SCORE
95
Shoreline exemption for port of seattle, terminal 5 - to support the pile systems repair and maintenance program. Approval expires 10/2/2014. All reviews done under 3013733.
Date:  December 10, 2014

Applicant: Sloan, Jon | Permit status: Permit closed | Permit id: 3014008
2014/12/100952701 26th Ave Sw Seattle WaPort Of Seattle Engineering
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.