Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Advance 4 borings to approximately ft. Bgs. Within the proposed building footprint using geoprobe and having a borehole of 2-inch diameter. One-inch pvc temporary wells will be installed in each borehole to complete a groundwater quality assessment. Temporary wells and boreholes will be open less than 24 hrs and will be grouted upon completion of the assessment of each location. Date: August 8, 2013 Client: Kennedy Center For The Performing Arts | Applicant: Langan Engineering ? Environmental | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300316 | |||||
Drill 9 borings within footprint of proposed building. Two borings will be drilled to 45 ft. Bgs. And 65 ft. Bgs, having a 4. 25-inch diam. Borehole and using hollow stem auger. The remaining 7 borings will be drilled to 75 ft. Bgs using mud rotary and having a 3. 25-inch diam. Borehole. At these 7 locations the bedrock will be cored an additional to 15 ft. Bgs using nx coring having a 2. 15-inch diam. Borehole. Temporary well points will be installed for groundwater quality and aquifer testing in two of the boreholes at 65 ft and 75 ft. Bgs. Boreholes will be grouted upon completion of assessment and will be open less than 24 hrs. Date: August 8, 2013 Client: Kennedy Center For The Performing Arts | Applicant: Langan Engineering ? Environmental | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300317 | |||||
Replace gift shop materail lift. Estimated cost of work 48,000. 00 Date: November 12, 2013 Client: United States Of America | Applicant: Otis Elevator Company | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1302160 | |||||
Peelle door mod estimated cost of work 104,000. 00 Date: November 20, 2013 Client: United States Of America | Applicant: Otis Elevator Co | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1302161 | |||||
Peelle door mod on biparty freight estimated cost of work 121,000. 00 Date: November 12, 2013 Client: United States Of America | Applicant: Otis Elevator Co | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1302165 | |||||
Stripescalators to bare truss and rebuild est. Cost of work 1,611,5418. 00 Date: November 4, 2014 Client: Smith Property Holdings 4411 Connecticutt Llc | Applicant: Otis Elevator Company | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1403129 | |||||
The first phase of the project consists of land disturbance associated with the relocation of a dc water control vault on the site. The second phase of the project consists of construction of a new expansion, parking area, green roofs, and gardens to the kennedy center for the performing arts. Federal property Date: October 29, 2015 Client: United States Of America | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1411311 | |||||
SCORE 64 Advance 4 borings to approximately ft. Bgs. Within the proposed building footprint using geoprobe and having a borehole of 2-inch diameter. One-inch pvc temporary wells will be installed in each borehole to complete a groundwater quality assessment. Temporary wells and boreholes will be open less than 24 hrs and will be grouted upon completion of the assessment of each location. Date: August 8, 2013 Contractor: Langan Engineering Environmental Client: Kennedy Center For The Performing Arts | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300316 | |||||
SCORE 64 Drill 9 borings within footprint of proposed building. Two borings will be drilled to 45 ft. Bgs. And 65 ft. Bgs, having a 4. 25-inch diam. Borehole and using hollow stem auger. The remaining 7 borings will be drilled to 75 ft. Bgs using mud rotary and having a 3. 25-inch diam. Borehole. At these 7 locations the bedrock will be cored an additional to 15 ft. Bgs using nx coring having a 2. 15-inch diam. Borehole. Temporary well points will be installed for groundwater quality and aquifer testing in two of the boreholes at 65 ft and 75 ft. Bgs. Boreholes will be grouted upon completion of assessment and will be open less than 24 hrs. Date: August 8, 2013 Contractor: Langan Engineering Environmental Client: Kennedy Center For The Performing Arts | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300317 | |||||
SCORE 64 Advance 4 borings to approximately ft. Bgs. Within the proposed building footprint using geoprobe and having a borehole of 2-inch diameter. One-inch pvc temporary wells will be installed in each borehole to complete a groundwater quality assessment. Temporary wells and boreholes will be open less than 24 hrs and will be grouted upon completion of the assessment of each location. Date: August 8, 2013 Contractor: Langan Engineering Environmental Client: Kennedy Center For The Performing Arts | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300316 | |||||
SCORE 64 Drill 9 borings within footprint of proposed building. Two borings will be drilled to 45 ft. Bgs. And 65 ft. Bgs, having a 4. 25-inch diam. Borehole and using hollow stem auger. The remaining 7 borings will be drilled to 75 ft. Bgs using mud rotary and having a 3. 25-inch diam. Borehole. At these 7 locations the bedrock will be cored an additional to 15 ft. Bgs using nx coring having a 2. 15-inch diam. Borehole. Temporary well points will be installed for groundwater quality and aquifer testing in two of the boreholes at 65 ft and 75 ft. Bgs. Boreholes will be grouted upon completion of assessment and will be open less than 24 hrs. Date: August 8, 2013 Contractor: Langan Engineering Environmental Client: Kennedy Center For The Performing Arts | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300317 | |||||
SCORE 95 Replace gift shop materail lift. Estimated cost of work 48,000. 00 Date: November 12, 2013 Contractor: Otis Elevator Company Client: United States Of America | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1302160 | |||||
SCORE 95 Peelle door mod estimated cost of work 104,000. 00 Date: November 20, 2013 Contractor: Otis Elevator Co Client: United States Of America | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1302161 | |||||
SCORE 95 Peelle door mod on biparty freight estimated cost of work 121,000. 00 Date: November 12, 2013 Contractor: Otis Elevator Co Client: United States Of America | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1302165 | |||||
SCORE 95 Stripescalators to bare truss and rebuild est. Cost of work 1,611,5418. 00 Date: November 4, 2014 Contractor: Otis Elevator Company Client: Smith Property Holdings 4411 Connecticutt Llc | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1403129 | |||||
SCORE 71 The proposed work consists of construction of the stormwater management facilities and underground utility infrastructure for the kennedy center for the performing arts expansion - swm plan number 3955. Refer to building permit number b1411311 for erosion and sediment control and excavation approval. This project is located on federal property. Date: December 16, 2015 Contractor: Noelle Trent Client: Tom Whitaker Kennedy Center For The Performing Arts | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1602646 | |||||
The first phase of the project consists of land disturbance associated with the relocation of a dc water control vault on the site. The second phase of the project consists of construction of a new expansion, parking area, green roofs, and gardens to the kennedy center for the performing arts. Federal property Date: October 29, 2015 Client: United States Of America | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1411311 | |||||
SCORE 59 Drill ten borings within site expansion area to depths ranging from 5 to feet bgs using geoprobe drilling method and macro-core samplers having an od of 2. 25 inches. Boreholes will be grouted upon completion of assessment and will be open less than 24 hours. Date: June 8, 2015 Contractor: Langan Engineering And Environmenta Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500318 | |||||
SCORE 59 We will perform 3 cone penetrometer tests, cpts and 2 flat dilatometer tests, dmts. The cpts and dmts consist of a conical and flat plate probe, respectively, that are pushed into the ground using a truck rig. No investigation dervide wastes are expected to be generated. If holes do not self-seal upon removal of probes, probe-holes will be immediately filled with grout. Date: June 26, 2015 Contractor: Langan Engineering And Environmenta Client: Kennedy Center For The Performing Arts | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500348 | |||||
SCORE 59 1 vertical geothermal bore, air rotary method to target depth of 5 feet, 8. 5 inch diameter to bedrock and 5. 5 inch diameter to target depth thereafter. See attached work plan for more detail. Date: February 4, 2015 Contractor: Sean Jones Allied Well Drilling Client: Claudette Donlon | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500117 | |||||
SCORE 59 Dc clean rivers proposes to drill twelve geotechnical borings, inc-1, inc-2, inc-3, bx-1, bx-2, bx-3, bx-4, bx-5, pz-1, pz-2, ow-1, ow-2, located in the parking lot and green space south of the kennedy center and north of i-66. The borings will be 6 inches in diameter and range between 67 and 82 feet in depth, drilled by mud rotary methods. Temporary casing will be used to install inclonometers, borehole extensometers and vibrating wire piezometers. Permanent casing will be socketed and grouted in rock before proceeding with drilling. Temporary casing will be set before proceeding with drilling. All drilling generated wastes will be drummed, and tested for proper disposal. All borings will be protected from surface water drainage and the vertical migration of contaminants and other materials down the borehole. Date: April 7, 2016 Contractor: Nic Patterson Dccr Project Aecom Client: Tom Whitaker- Kennedy Center | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600141 | |||||
SCORE 59 Dc clean rivers project proposes to drill 1 secant piles, identified as s-1 through s-130, to support excavation of the cso-21 diversion chamber and drop shaft located in the parking lot and green space south of the kennedy center and north of i-66. The secant piles will be inches in diameter 67 feet deep and drilled by auger methods. Temporary steel casing will be advanced to top of rock and grouted before continued drilling. See attached work plan and schematics for additional information. All drilling generated waste will be contained: solids and liquids, tested and properly disposed. The boring will be covered and protected from surface water drainage and the vertical migration of contaminants and other materials during construction. Date: April 25, 2016 Contractor: Nic Patterson Dccr Project Aecom Client: Tom Whitaker Kenendy Center | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600140 | |||||
SCORE 56 On behalf of dc water, the dc clean rivers project is requesting the doee approval to install approximately rock grout borings surrounding the drop shaft located south of the kennedy center. Dccr is proposing to drill the rock grout borings to support construction of the division pr-b cso-21 diversion chamber and drop shaft as part of dc waters ltcp. The rock grout borings will be excavated utilizing duplex rotary drilling with water flush methods to top of rock. Wet rotary with water flush and/or water actuated down the hole hammer methods will be used to drill into the rock. The rock grout will be tremied to the top of the bedrock. The boring will then be tremie grouted with bentonite slurry from the top of rock to the surface while extracting the temporary surface casing. Soil cuttings shall be isolated and temporarily stockpiled at the site in applicable stockpiling regulations. Sampling and laboratory analysis of these spoils will be performed to determine disposal requirements. No Date: April 25, 2016 Client: Tom Whitaker Kennedy Center | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600166 | |||||
SCORE 64 (dccr) proposes to drill and install micropile foundation elements (s-1 through s-20) to support the ventilation control facility at the cso 021 diversion chamber and drop shaft site, located south of the kennedy center and north of i-66. Micropile foundation installation will be performed utilizing a fully cased methodology. After installing the first section of casing, drilling with an auger or bucket is performed until the excavation inside the casing reaches approximately 1. 5 feet above the lower end of the casing. Sandbags and earth dikes will be used to prevent surface runoff from entering the borehole. Reinforced steel will be placed after the excavation of the micropile has been completed, and the design depth of the pile has been reached. Each individual micropile shaft will be permanently filled with 4,0 psi grout. No excavated soils will be used as backfill. The micropile installation, waste management of drill spoils, and groundwater protective measures are comprehensively Date: July 11, 2017 Contractor: Homaira Sharif Client: United States Of America | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700364 |