Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Installation of 4. 165 kw (17 panel) rooftop solar array Permit type: Addition/alteration | Completion date: August 26, 2013 | Current use: One-family | Parcel: 261118 | |||||
SCORE 66 Main house and shed: remove and replace existing asphalt shingles on entire dwelling, repair/replace up to 32 sf. Of rotted or broken roof sheathing,renail existing roof sheathing, replace all waste pipe flanges, apply ice & water shield to first 6 ft. Of roof eave ends, install 8" aluminum drip edge to all perimeters of roof, apply lifetime mfg. Warranty arch. Style shingles over synthetic underlayment, remove all debris from mobsite ensuring that ground is free of nailks and material that will pose a hazard to pets Permit type: Roof | Completion date: August 30, 2013 | Parcel: 261118 | |||||
SCORE 100 Excavation Date: May 11, 2015 Contractor: K.B. Aruda Construction Inc Permit id: Exc20260 | |||||
SCORE 66 Main house and shed: remove and replace existing asphalt shingles on entire dwelling, repair replace up to 32 sf. Of rotted or broken roof sheathing,renail existing roof sheathing, replace all waste pipe flanges, apply ice & water shield to first 6 ft. Of roof eave ends, install 8" aluminum drip edge to all perimeters of roof, apply lifetime mfg. Warranty arch. Style shingles over synthetic underlayment, remove all debris from mobsite ensuring that ground is free of nailks and material that will pose a hazard to pets Permit type: Roof | Completion date: August 30, 2013 | Permit id: 0 | Parcel: 261118 |