ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 100 Fence Date: October 31, 2012 Contractor: Breaking Solutions IncPermit type: Equipment | Permit status: Permit issued | Permit id: 22019174401 | |||||
SCORE 100 Full demolition Date: October 31, 2012 Contractor: Breaking Solutions IncPermit status: Permit issued | Permit id: 22019174401 | |||||
Locate and repair the water leaks, in 2689 marion avenue. Pump out disinfect the cellar in 2691 marion avenue. Note: contractor must contact hpd Date: January 10, 2005Permit type: Plumb | Permit id: E516852 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immediately to esb fuel unit. 212-863-7830 Date: March 16, 2009Permit type: Util | Permit id: E929993 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immediately to esb fuel unit. 212-863-7830 Date: December 4, 2007Permit type: Util | Permit id: E813650 | |||||
As per rc # 20080000809 (eastern analyt. Svc.,inc), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw Date: February 7, 2008Permit type: Delead | Permit id: E821726 | |||||
Apt 1 ) trace the source of water leak at showerstall in the bathroom and floor around shower stall with restoration and make the necessary repairs. Date: January 7, 2008Permit type: Gc | Permit id: E817669 | |||||
Make all necessary repairs to #2 oil boiler to restore to proper working order. Restore heat to entire building. Note: contractor must contact hpd Date: December 8, 2007Permit type: Heat | Permit id: E814380 | |||||
(apt. #1) at kitchen: trace and repair the source of water leak and loose plaster. At kitchen: east wall sq. Ft., south wall sq. Ft and ceilin Date: January 2, 2008Permit type: Gc | Permit id: E817456 | |||||
Provide single fuel drop with prime and start #2 fuel fill tank. Please report any problems immediately to esb fuel unit. (212) 863-8781 Date: January 17, 2009Permit type: Util | Permit id: E923255 | |||||
Make all necessary repairs to #2 oil boiler to restore to proper working order. Restore heat to entire building. Note:contractor must sign and ret Date: January 21, 2009Permit type: Heat | Permit id: E923458 | |||||
Make all necessary repair to restore #2 oil boiler to proper working order. Note: contractor must contact h. P. D. @ (718) 636-3015, 3024, 3025, 30 Date: February 15, 2009Permit type: Heat | Permit id: E926704 |