Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: March 15, 2016 Client: Cini Marialana | Permit status: Completed | Permit id: 676433 | |||||
Alteration permit Date: March 15, 2016 Client: Cini Marialana | Permit status: Completed | Permit id: 676433 | |||||
SCORE 98 Masonry front wall - remove existing 2 story front masonry wall. Replace with new 8 inch masonry wall, on existing foundation. Windows and door same location & shall comply with the 2009 international energy efficiency code, u factor of . 35, and with emergency egress standards as per irc. New door opening for 36 inch door. Horizontal reinforcement (durawall) every 24 inches. Install returns into party walls for structural connection, two at each floor level. Flash and seal roof to new front. Date: March 15, 2016 Contractor: Walter Olsen Client: Cini Marialana | Permit type: Alteration permit | Permit status: Completed | Completion date: June 4, 2016 | Permit id: 676433 | |||||
SCORE 100 Install a new roof on the main and shed roof (sfd) Date: March 3, 2017 Contractor: Morris Roofing Inc Client: Cini Marialana | Permit type: Alteration permit | Permit status: Completed | Completion date: October 18, 2017 | Permit id: 763936 |