Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Construction of a three story, detached structure, with interior parking garage, roof deck and access pilot house (for stairs and landing only). Date: June 15, 2017 Contractor: Grit Construction And Developmen Client: Pincus Sean Steir Catherine | Permit type: New construction permit | Permit status: Active | Completion date: November 27, 2017 | Permit id: 779992 | |||||
SCORE 82 3 water closets,5 lavs,1 bath tub,1 showers,1 kitchen sink,1 washer box, pex and pvc throughout 1" domestic,5" & 6" lateral,5x4 curb trap and 4" main drain(sfd)the installation will comply with the philadelphia plumbing code 2004 "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: July 17, 2017 Contractor: Frankie D Plumbing And Heating Client: Pincus Sean Steir Catherine | Permit type: Plumbing permit | Permit status: Active | Completion date: October 2, 2017 | Permit id: 800240 | |||||
SCORE 98 New construction electrical wiring including 200amp service all outlets and switches smoke detectors lighting all grounding all phase done per nec code Date: September 15, 2017 Contractor: Talon Electric Llc Client: Pincus Sean Steir Catherine | Permit type: Electrical permit | Permit status: Active | Completion date: September 15, 2017 | Permit id: 816638 | |||||
SCORE 89 Installation of (2) hvac units (including ductwork and all associated accessories). Single family Date: September 12, 2017 Contractor: Alkaun Co Client: Pincus Sean Steir Catherine | Permit type: Mechanical permit | Permit status: Active | Completion date: October 11, 2017 | Permit id: 815398 |