Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: December 3, 2015 Contractor: Dads Heating And Air Conditioning Inc Permit type: Mechanical - hvac change out | Permit status: Issued | Permit id: Pds2015-Resalt- | |||||
SCORE 72 Roof mount residential solar pv for existing sfd & upgrade to 2 amps no. Of modules no. Of inverters 1 (48 watt) total system size in kilowatts 5. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 6, 2009 Contractor: D C G Electric Inc Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2009-1031-20 | Parcel: 1082522100 |