Hand auger 8 borings up to feet below the ground surface for environmental sampling. Diameter of borehole will be 4 inches. Date: July 10, 2012 Client: Dc Water | Applicant: Dc Water; Nic Patterson Urs | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200388 | |||||
Dc clean rivers project, division n, lid retrofit entails the installation of green roofs and storm water retention features at existing dc water facilities. Date: December 3, 2012 Client: Dc Water Chris Allen | Applicant: Justin Donnelly | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1301180 | |||||
Dc clean rivers anacostia river tunnel cso 019 construction staging area site civil work. General land disturbance, sediment erosion control, clear and grub, grading and stabilization. Date: December 3, 2013 Client: Dc Water Carlton Ray | Applicant: Zachary Zill; Impregilo-Healy Jv; Zach Zill | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1300043 | |||||
Dc water clean rivers project - anacostia river tunnel cso 019 site civil work for temporary construction trailers. Sediment erosion control measures, site stabilization. Date: October 22, 2013 Client: Carlton Ray Dc Water | Applicant: Zachary Zill; Impregilo-Healy Jv; Zach Zill | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1400011 | |||||
Soil boring for dewatering activities at cso-019 of dc waters anacostia river tunnel project. 28 mud rotary borings: 12 dewatering wells at 195 feet deep, 8 inches internal diameter; 4 monitoring wells at 132 feet deep, 2 inches internal diameter. 12 contingency wells. Date: March 31, 2014 Client: Dc Water | Applicant: Zach Zill | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400046 | |||||
Soil boring for ground monitoring instrumentation for dc waters anacostia river tunnel project. Date: February 5, 2014 Client: Dc Water Carlton Ray | Applicant: Zachary Zill | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400002 | |||||
Dc clean rivers anacostia river tunnel project cso 019 support of excavation. Slurry wall soe for excavation of two shafts 117 feet deep from surface, 69 feet 4 inch inside diameter. Slurry wall construction will be 36 inch thick 50 psi reinforced concrete. Ground disturbance and cut/fill volume previously approved under permit bciv1300043. Date: January 27, 2014 Client: Dc Water Carlton Ray | Applicant: Zach Zill | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1400018 | |||||
Temporary construction trailers for dc waters anacostia river tunnel project. Six trailers total: two single-wide, three double-wide, one triple-wide. Soil erosion control ? Site work already approved, permit # bciv1400011 ( trailers to be removed by 10-1-17) Date: January 22, 2014 Client: Impregilo-Healy-Parsons Jv | Applicant: Zach Zill | Permit type: New building | Permit status: Completed | Permit id: B1401123 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfn1cc27tjufnbc0ilcpdxd Date: January 25, 2014 Client: Impregilo-Healy -Parsons Jv | Applicant: Mark Fuhrman; Impregilo-Healy -Parsons Jv; Mark Fuhrman | Permit type: Electrical | Permit status: Permit issued | Permit id: E34014462 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfn1cc27tjufiar487lljpe Date: February 19, 2014 Client: Impregilo Healy Parsons Jv | Applicant: Steven Griffith; Impregilo Healy Parsons Jv; Robert Stanton | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P36625518 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfn1cc27tjufiar487lljpe Date: February 19, 2014 Client: Impregilo Healy Parsons Jv | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P36625518 | |||||
SCORE 59 Dc clean rivers anacostia river tunnel cso 019 construction staging area site civil work. General land disturbance, sediment erosion control, clear and grub, grading and stabilization. Date: December 3, 2013 Contractor: Zachary Zill Impregilohealy Jv Zach Zill Client: Dc Water Carlton Ray | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1300043 | |||||
SCORE 59 Dc water clean rivers project - anacostia river tunnel cso 019 site civil work for temporary construction trailers. Sediment erosion control measures, site stabilization. Date: October 22, 2013 Contractor: Zachary Zill Impregilohealy Jv Zach Zill Client: Carlton Ray Dc Water | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1400011 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfn1cc27tjufnbc0ilcpdxd Date: January 25, 2014 Client: Impregilo-Healy -Parsons Jv | Permit type: Electrical | Permit status: Permit issued | Permit id: E34014462 | |||||
SCORE 59 Hand auger 8 borings up to feet below the ground surface for environmental sampling. Diameter of borehole will be 4 inches. Date: July 10, 2012 Contractor: Dc Water Nic Patterson Urs Client: Dc Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200388 | |||||
SCORE 59 Dc clean rivers anacostia river tunnel cso 019 construction staging area site civil work. General land disturbance, sediment erosion control, clear and grub, grading and stabilization. Date: December 3, 2013 Contractor: Zachary Zill; Impregilohealy Jv; Zach Zill Client: Dc Water Carlton Ray | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1300043 | |||||
SCORE 59 Dc water clean rivers project - anacostia river tunnel cso 019 site civil work for temporary construction trailers. Sediment erosion control measures, site stabilization. Date: October 22, 2013 Contractor: Zachary Zill; Impregilohealy Jv; Zach Zill Client: Carlton Ray Dc Water | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1400011 | |||||
SCORE 78 Soil boring for ground monitoring instrumentation for dc waters anacostia river tunnel project. Date: February 5, 2014 Contractor: Zachary Zill Client: Dc Water Carlton Ray | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400002 | |||||
SCORE 72 Soil boring for dewatering activities at cso-019 of dc waters anacostia river tunnel project. 28 mud rotary borings: 12 dewatering wells at 195 feet deep, 8 inches internal diameter; 4 monitoring wells at 132 feet deep, 2 inches internal diameter. 12 contingency wells. Date: March 31, 2014 Contractor: Zach Zill Client: Dc Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400046 | |||||
SCORE 72 Temporary construction trailers for dc waters anacostia river tunnel project. Six trailers total: two single-wide, three double-wide, one triple-wide. Soil erosion control ? Site work already approved, permit # bciv1400011 ( trailers to be removed by 10-1-17) Date: January 22, 2014 Contractor: Zach Zill Client: Impregilo-Healy-Parsons Jv | Permit type: New building | Permit status: Completed | Permit id: B1401123 | |||||
SCORE 93 Dc clean rivers project, division n, lid retrofit entails the installation of green roofs and storm water retention features at existing dc water facilities. Date: December 3, 2012 Contractor: Justin Donnelly Client: Dc Water Chris Allen | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1301180 | |||||
SCORE 59 Hand auger 8 borings up to feet below the ground surface for environmental sampling. Diameter of borehole will be 4 inches. Date: July 10, 2012 Contractor: Dc Water; Nic Patterson Urs Client: Dc Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200388 | |||||
SCORE 78 Soil boring for shallow dewatering system for excavation of near surface structures at cso 019 site of dc waters clean rivers div h project. Up to 18 borings of 8 inch diameter, drilled to feet bgs. Mud rotary drilling method. Date: July 1, 2015 Contractor: Zachary Zill Client: Dc Water Carlton Ray | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500265 | |||||
SCORE 78 Jet grouting for ground stabilization at cso 019 site of dc waters clean rivers div h project. Max 2 boreholes of 8 inch diameter, for grout injection. Depth = 1 feet bgs. Date: April 8, 2015 Contractor: Zachary Zill Client: Dc Water Carlton Ray | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500238 | |||||
SCORE 72 Soil boring for ground characterization at cso 019 site of dc water clean rivers div h project. Fifteen borings to approx. El -70. Sonic borings 6 inches diameter. Borings will be identical in means and methods to borings permitted under sb 1500178. Date: March 30, 2015 Contractor: Zach Zill Client: Dc Water Carlton Ray | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500218 | |||||
SCORE 76 Extension of bciv1300043 - sitework permit for cso 19 site northeast boundary tunnel - division j. Date: December 29, 2016 Client: Dc Water Dc Clean Rivers | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1700046 | |||||
SCORE 72 Dc clean rivers anacostia river tunnel project cso 019 support of excavation. Slurry wall soe for excavation of two shafts 117 feet deep from surface, 69 feet 4 inch inside diameter. Slurry wall construction will be 36 inch thick 50 psi reinforced concrete. Ground disturbance and cut/fill volume previously approved under permit bciv1300043. Date: January 27, 2014 Contractor: Zach Zill Client: Dc Water Carlton Ray | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1400018 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfn1cc27tjufnbc0ilcpdxd Date: January 25, 2014 Client: Impregilo-Healy -Parsons Jv | Permit type: Electrical | Permit status: Permit issued | Permit id: E34014462 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfn1cc27tjufiar487lljpe Date: February 19, 2014 Client: Impregilo Healy Parsons Jv | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P36625518 | |||||
SCORE 78 Support of excavation for near surface work at cso 019 site of dc waters clean rivers div h project. Soe system will consist of sheet piles, walers and struts, tie-rods and tieback anchors. Soe will be installed in 4 phases: 1- temp. Bypass channel, 2- nebts diversion structure, 3- approach channel, 4- overflow structure connections. Civil site work, ddoe erosion control/stormwater management already approved under permit bciv1300043. Date: May 5, 2015 Contractor: Zachary Zill Client: Dc Water Carlton Ray | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1506965 | |||||
SCORE 56 Revision to permit sb1400046. Revised per letter, plan, and schematic submitted to ddoe on 02/18/2015. Date: February 18, 2015 Contractor: Dc Water Carlton Ray; Zachary Zill Client: Dc Water Carlton Ray | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500178 | |||||
SCORE 59 Dccr proposes to drill two geotechnical borings (nebbc-66 and nebbc-67 located at 26 independence ave se. The boring will be 6 inches in diameter and 75 feet bgs, drilled by hollow-stem auger. Permanent casing will be socketed feet into the p/a formation and grouted before continued drilling. The boring will not extend into the ptx. See idw management plan and attached schematics for additional information. All drilling generated waste will be drummed (solids and liquids). Refer to the division j edr and gdr for additional environmental and geotechnical information. The well shall be covered and protected from surface water drainage and the vertical migration of contaminants and other materials through the well casing and well annulus. Date: May 15, 2015 Contractor: Chris Willett Aecom Client: National Park Service | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500266 | |||||
SCORE 72 Near surface structures for dc water clean rivers project div h - cso 019 site. Construction of intake/ventilation chambers, approach channel and odor control venting facility, and connection to overflow structure. All construction is below-grade sewerage. Sheeting & shoring permit b1506965. Erosion control & stormwater management permitted under bciv1300043. Date: August 10, 2015 Contractor: Zach Zill Client: Dc Water Carlton Ray | Permit type: New building | Permit status: Permit issued | Permit id: B1510807 |