Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Replacement low pressure boiler Date: December 22, 2004 Contractor: Save Home Heat Co. Inc Client: Charles Stilley,Mildred Stilley | Applicant: Save Home Heat Co., Inc. | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 100 Total tear off and overlay -- 28 squares, contractor indicated 4 12 pitch -- material: owenfoots duration asphalt Date: September 19, 2012 Contractor: A A A Roofing And Insulation Client: Evelyn Bashor | Applicant: A A A Roofing & Insulation | Permit type: Roofing | Permit status: Cmp | Completion date: September 25, 2012 | Current use: Single family d | |||||
SCORE 100 Total tear off and overlay -- 28 squares, contractor indicated 4 12 pitch -- material: owenfoots duration asphalt Client: Evelyn Bashor | Permit type: Roofing | Permit status: Cmp | Completion date: September 25, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-04564 | |||||
SCORE 100 Replacement low pressure boiler Client: Charles Stilley | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2004-20502 |