Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Remove room divider. Date: January 11, 2005 Contractor: Quinlan Construction Inc Client: Central 2545.0 | Applicant: Quinlan Construction Inc | Permit type: Demolition | Permit status: Cmp | Current use: Office - admini | |||||
SCORE 95 Furr out 3 walls Client: Central 2545.0 | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 19, 2004 | Current use: Office - admini | |||||
SCORE 95 Add 2 new walls and remove 3 walls. Client: Central 2545.0 | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 25, 2005 | Current use: Office - admini | |||||
SCORE 96 Fire sprinkler system - phase 5 Date: April 17, 2001 Contractor: Code Fire Systems Inc Client: Central 2545.0 | Applicant: Code Fire Systems, Inc | Permit type: Fire | Permit status: Cmp | Completion date: January 28, 2002 | Current use: Office - techni | |||||
SCORE 88 Replace split system a c system unit. Date: January 11, 2001 Contractor: Encompass Mechanical Services Client: Central 2545.0 | Applicant: Encompass Mechanical Services | Permit type: Mechanical | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 95 Create three offices from two. Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 8, 2001 | Current use: Office - admini | |||||
SCORE 95 Demo wall and rebuild Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 27, 2000 | Current use: Office - admini | |||||
SCORE 95 Tenant remodel, includes building and electrical Client: Central 2545.0 | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 30, 2000 | Current use: Office - admini | |||||
SCORE 95 Interior non-structural demolition of interior walls only -- main floor only. Approximately 16,0 sf. Date: April 24, 2009 Contractor: Quinlan Construction Inc Client: Central 2545.0 | Applicant: Quinlan Construction Inc | Permit type: Demolition | Permit status: Cmp | Completion date: October 10, 2011 | Current use: Office - admini | |||||
SCORE 95 Tenant remodel of 21, 456 sf to create offices, conference rooms and laboratory areas for droplet measurment technologies. Fire sprinkler system to be added by separate permit. Client: Central 2545.0 | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 22, 2009 | Current use: Office - techni | |||||
SCORE 95 New sprinkler for droplet Date: June 30, 2009 Contractor: Code Fire Llc Client: Central 2545.0 | Applicant: Code Fire Llc | Permit type: Fire | Permit status: Cmp | Completion date: February 1, 2012 | Current use: Office - techni | |||||
SCORE 100 Install new 6inch fireline Date: July 9, 2009 Contractor: Nixcavating Inc Client: Central 2545.0 | Applicant: Nixcavating, Inc | Permit type: Fire, water, right-o | Permit status: Iss | |||||
SCORE 91 New fire alarm system for droplet measurement Date: August 12, 2009 Contractor: Samsons Detection Systems Inc Client: Central 2545.0 | Applicant: Samsons Detection Systems Inc. | Permit type: Fire | Permit status: Cmp | Current use: Office - techni | |||||
SCORE 100 Bore 75foot along central to install new cable Date: May 13, 2011 Contractor: Comcast Client: Central 2545.0 | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 92 Remove roofing on upper tier of roof and re-roof with foam and 3 coats of elastomeric coating. 76 squares, flat roof. Date: December 13, 2012 Contractor: Technical Foam Corp Client: Investment Flatiron | Applicant: Technical Foam Corp | Permit type: Roofing | Permit status: Cmp | Completion date: May 20, 2013 | Current use: Existing | |||||
SCORE 95 Installation of two replacement rtus, like for like, units to meet required energy efficiencies detailed in the 2006 iecc, brc 1981 and amended and or ashrae 90. 1. Date: May 1, 2013 Contractor: Timberline Mechanical Systems Client: Investment Flatiron | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: June 26, 2013 | Current use: Office - techni | |||||
SCORE 95 Interior non-structural demo. Fire sprinklers under separate permit. Scope of work does not include mechanical, electrical or plumbing. Date: December 23, 2013 Contractor: Quinlan Construction Inc Client: Investment Flatiron | Applicant: Quinlan Construction Inc | Permit type: Demolition | Permit status: Cmp | Completion date: February 5, 2014 | Current use: Manufacturing, | |||||
SCORE 100 Fs - sowl - inchrelocate 2 penent sprinklers for new tenant finish. Total of 2. Inch Date: January 16, 2014 Contractor: Fire Defense Inc Client: Investment Flatiron | Applicant: Fire Defense, Inc | Permit type: Fire | Permit status: Cmp | Completion date: February 5, 2014 | Current use: Office - admini | |||||
SCORE 100 Tenant interior remodel: scope to include creation of new office space and open conference space. Scope will also include creation of new accessible bathroom. Client: Investment Flatiron | Applicant: Faurot Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 12, 2014 | Current use: Office - profes | |||||
SCORE 100 Interior non-structural demolition for tenant interior remodel under pmt2014-01805. Date: April 24, 2014 Contractor: Faurot Construction Inc Client: Investment Flatiron | Applicant: Faurot Construction Inc | Permit type: Demolition | Permit status: Cmp | Completion date: September 11, 2014 | Current use: Office - profes | |||||
SCORE 95 Replacement of 3 rtus - like for like size and location. To include 2, 5 ton units at 17. 1 seer and 1, 7. 5 ton unit at 13 seer. Date: June 24, 2014 Contractor: Timberline Mechanical Systems Client: Investment Flatiron | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: July 30, 2014 | Current use: Commercial/reta | |||||
SCORE 100 Push pull nre cable via bore to exsisting conduit Date: August 4, 2014 Contractor: Comcast Client: Investment Flatiron | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 99 Fa - add 13 h s & 3 strbs Date: August 5, 2014 Contractor: Fire Alarm System Technologies Inc Client: Investment Flatiron | Applicant: Fire Alarm System Technologies Inc | Permit type: Fire | Permit status: Cmp | Completion date: September 23, 2014 | Current use: Office - admini | |||||
SCORE 95 Fs - tf for office space Date: August 7, 2014 Contractor: Abc Fire Protection Inc Client: Investment Flatiron | Applicant: Abc Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: September 23, 2014 | Current use: Office - admini | |||||
SCORE 95 Installation of replacement rtu (124,8 btu) on commercial building. New unit matches existing size and penetrations. Date: September 16, 2014 Contractor: Timberline Mechanical Systems Client: Investment Flatiron | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: October 9, 2014 | Current use: Office - techni | |||||
SCORE 95 Inchlike for likeinch replacements of eight rtufoots . Four 7. 5 ton - 92k btu, (1) 4 ton - 48k btu, (1) 5 ton - 60k btu, (1) 8. 5 ton - 102k btu, and (1) 12. 5 ton - 150k btu. Date: August 13, 2015 Contractor: Timberline Mechanical Systems Client: Investment Flatiron | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Iss | Current use: Manufacturing, | |||||
SCORE 95 New sign cabinet to be installed over existing free-standing sign. Client: Investment Flatiron | Permit type: Flood fence flood permit, sign | Permit status: Cmp | Completion date: August 11, 2016 | Current use: Commercial/retail, existing | Permit id: Pmt2016-02773 | |||||
Underground cable replacement for out of service building. Bore ~4 ft with 9 8inchpotholes, and 5 3x3 bore cuts. Date: August 23, 2016 Client: Investment Flatiron | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-03891 | |||||
SCORE 95 Tenant remodel of 21, 456 sf to create offices, conference rooms and laboratory areas for droplet measurment technologies. Fire sprinkler system to be added by separate permit. Client: Central | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: October 22, 2009 | Current use: Office - technical, tenant remodel | Permit id: Pmt2009-02043 | |||||
SCORE 95 New sprinkler for droplet Client: Central | Permit type: Fire | Permit status: Cmp | Completion date: February 1, 2012 | Current use: Office - technical, existing | Permit id: Pmt2009-02429 | |||||
SCORE 95 Install new 6inch fireline Date: July 9, 2009 Contractor: Nixcavating, Inc Client: Central | Permit type: Fire, water, right-of-way | Permit status: Iss | Permit id: Pmt2009-02569 | |||||
SCORE 91 New fire alarm system for droplet measurement Client: Central | Permit type: Fire | Permit status: Cmp | Current use: Office - technical, existing | Permit id: Pmt2009-03167 | |||||
SCORE 95 Installation of two replacement rtus, like for like, units to meet required energy efficiencies detailed in the 2006 iecc, brc 1981 and amended and or ashrae 90. 1. Client: Investment Flatiron | Permit type: Mechanical | Permit status: Cmp | Completion date: June 26, 2013 | Current use: Office - technical, existing | Permit id: Pmt2013-01838 | |||||
SCORE 95 Tenant remodel, includes building and electrical Client: Central | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 30, 2000 | Current use: Office - administrative, remodel | Permit id: Pmt2000-02099 | |||||
SCORE 95 Create three offices from two. Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: February 8, 2001 | Current use: Office - administrative, remodel | Permit id: Pmt2001-00124 | |||||
SCORE 88 Replace split system a c system unit. Client: Central | Permit type: Mechanical | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2001-00142 | |||||
SCORE 96 Fire sprinkler system - phase 5 Client: Central | Permit type: Fire | Permit status: Cmp | Completion date: January 28, 2002 | Current use: Office - technical, existing | Permit id: Pmt2001-01414 | |||||
SCORE 95 Fs - sowl - inchrelocate 2 penent sprinklers for new tenant finish. Total of 2. Inch Client: Investment Flatiron | Permit type: Fire | Permit status: Cmp | Completion date: February 5, 2014 | Current use: Office - administrative, existing | Permit id: Pmt2014-00231 | |||||
SCORE 100 Tenant interior remodel: scope to include creation of new office space and open conference space. Scope will also include creation of new accessible bathroom. Client: Investment Flatiron | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: September 12, 2014 | Current use: Office - professional, tenant remodel | Permit id: Pmt2014-01805 | |||||
SCORE 95 Replacement of 3 rtus - like for like size and location. To include 2, 5 ton units at 17. 1 seer and 1, 7. 5 ton unit at 13 seer. Client: Investment Flatiron | Permit type: Mechanical | Permit status: Cmp | Completion date: July 30, 2014 | Current use: Commercial/retail, existing | Permit id: Pmt2014-02983 | |||||
Push pull nre cable via bore to exsisting conduit Date: August 4, 2014 Client: Investment Flatiron | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2014-03508 | |||||
SCORE 99 Fa - add 13 h s & 3 strbs Client: Investment Flatiron | Permit type: Fire | Permit status: Cmp | Completion date: September 23, 2014 | Current use: Office - administrative, existing | Permit id: Pmt2014-03624 | |||||
SCORE 95 Fs - tf for office space Client: Investment Flatiron | Permit type: Fire | Permit status: Cmp | Completion date: September 23, 2014 | Current use: Office - administrative, existing | Permit id: Pmt2014-03689 | |||||
SCORE 95 Installation of replacement rtu (124,8 btu) on commercial building. New unit matches existing size and penetrations. Client: Investment Flatiron | Permit type: Mechanical | Permit status: Cmp | Completion date: October 9, 2014 | Current use: Office - technical, existing | Permit id: Pmt2014-04277 | |||||
SCORE 92 Remove roofing on upper tier of roof and re-roof with foam and 3 coats of elastomeric coating. 76 squares, flat roof. Client: Investment Flatiron | Permit type: Roofing | Permit status: Cmp | Completion date: May 20, 2013 | Current use: Existing | Permit id: Pmt2012-05957 | |||||
SCORE 95 Furr out 3 walls Client: Central | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 19, 2004 | Current use: Office - administrative, remodel | Permit id: Pmt2004-03490 | |||||
Bore 75foot along central to install new cable Date: May 13, 2011 Client: Central | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2011-01849 | |||||
SCORE 95 Inchlike for likeinch replacements of eight rtufoots . Four 7. 5 ton - 92k btu, (1) 4 ton - 48k btu, (1) 5 ton - 60k btu, (1) 8. 5 ton - 102k btu, and (1) 12. 5 ton - 150k btu. Client: Investment Flatiron | Permit type: Mechanical | Permit status: Cmp | Completion date: September 21, 2015 | Current use: Manufacturing, existing | Permit id: Pmt2015-03429 | |||||
SCORE 95 Interior non-structural demo permit in preparation for work under pending pmtg2017-02148. Date: May 19, 2017 Contractor: Quinlan Construction Inc Client: Flatiron Gpif | Permit type: Demolition | Permit status: Iss | Current use: Office - technical, existing | Permit id: Pmt2017-02149 | |||||
SCORE 95 Demo wall and rebuild Permit type: Building, electrical | Permit status: Cmp | Completion date: December 27, 2000 | Current use: Office - administrative, tenant remodel | Permit id: Pmt2000-04623 | |||||
SCORE 95 Add 2 new walls and remove 3 walls. Client: Central | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 25, 2005 | Current use: Office - administrative, remodel | Permit id: Pmt2004-03325 | |||||
SCORE 95 Interior tenant remodel of an existing office space (remodel space located on main level in single-story portion of building)., scope includes work area of approximately 18 sf, and includes reconfiguration of interior non-structural walls, new single-stall restroom, reconfiguration of hvac ductwork, and electrical new lighting. Includes associated mep. Client: Flatiron Gpif | Permit type: Building, electrical, mechanical, plumbing | Permit status: Def | Completion date: September 7, 2017 | Current use: Office - technical, tenant remodel | Permit id: Pmt2017-02148 | |||||
SCORE 95 Sowl - (scope of work letter) for adding approximately 18 sprinkler heads to accomodate new wall ceiling layout. Kbi biopharma. See pmt 2017-02148 for general building permit. Client: Flatiron Gpif | Permit type: Fire | Permit status: Cmp | Completion date: September 7, 2017 | Current use: Office - technical, existing | Permit id: Pmt2017-02747 | |||||
SCORE 100 Fa- sowl (scope of work letter) per applicant: modify existing addressable fa system to monitor the fire sprinkler riser, provide occupant notification throughout on actuation of water flow, pull station and detection devices. Provide elevator recall, fire hat and shunt trip; and communicate all alarm, supervisory, and trouble signals by point contact id format to a ul listed central station via an aes wireless fire radio. Add four new ceiling mounted horn strobes, one new ceiling mounted ceiling strobe, and relocate one ceiling strobe. See pmt 2017-02854 for general building permit. Kbi biopharma Client: Flatiron Gpif | Permit type: Fire | Permit status: Cmp | Completion date: September 7, 2017 | Current use: Office - technical, existing | Permit id: Pmt2017-02854 | |||||
SCORE 95 Inchwhite shellinch demolition to prepare an existing tenant space for leasing. Energy and accessibilty code compliance to be detrmined upon future teant interior remodel permit submittal. Scope includes removal of interior partitions and electrical demolition. Client: Flatiron Gpif | Permit type: Electrical, demolition | Permit status: Iss | Current use: Office - technical, existing | Permit id: Pmt2017-04294 | |||||
SCORE 95 Installation of a replacement, roof mounted bathroom exhaust fan. Installation per manufacturerfoots specifications. No structural scope proposed approved. Client: Flatiron Gpif | Permit type: Mechanical | Permit status: Iss | Current use: Service industrial, existing | Permit id: Pmt2017-04337 |