Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd no. Of modules: 21 (schuco 245 ms-245) no. Of inverters: 21 micro total system size in kilowatts: 5. 15 replace panel 10 8 12: plan change -- see c of a... M1a 9 7 12: plan change -- see c of a... M1a per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 16, 2012 Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: October 18, 2012 | Permit id: Pds2012-1031-20 | |||||
Roof mount residential solar pv for existing sfd no. Of modules 21 (schuco 245 ms-245) no. Of inverters 21 micro total system size in kilowatts 5. 15 replace panel 10/8/12 plan change -- see c of a... M1a 9/7/12 plan change -- see c of a... M1a per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 16, 2012 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 18, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 89 Roof mount residential solar pv for existing sfd no. Of modules 21 (schuco 245 ms-245) no. Of inverters 21 micro total system size in kilowatts 5. 15 replace panel 10 8 12 plan change -- see c of a... M1a 9 7 12 plan change -- see c of a... M1a per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 16, 2012 Contractor: Mc Wire Electric Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 18, 2012 | Permit id: Pds2012-1031-20 | |||||
Final Date: October 12, 2012 Permit status: Pass | Permit id: Pds2012-1031-20 |