Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 61 Install steel beam and columns as per plans. Install lvl beams repairng structural issues as per plas. Install lvl beam to expand opening in basement and stairwell. Date: June 15, 2017 Contractor: John Justin Galinus Client: Berlin Alejandro Leon Jakab Audrey Elizabheth | Permit type: Alteration permit | Permit status: Active | Completion date: October 26, 2017 | Permit id: 787481 | |||||
Pour 4" thick concrete floor in basement (floor level to remain as is)install sliding door in rear existing mudroom redo bay window in rear bedroom reno bath change baths window repair plaster and drywall as needed install sky lights per plan and install blown-in insulation above existing ceilings of 2nd floor of existing attached structure Date: June 26, 2017 Client: Berlin Alejandro Leon Jakab Audrey Elizabheth | Permit type: Alteration permit | Permit status: Active | Completion date: October 26, 2017 | Permit id: 792360 | |||||
SCORE 81 Install 60amp 6-circuit sub panel in rear basement & replace old wiring, outlets & switches, install new wiring for updated layout & install interconnected hardwired smoke detectors as per nec 2008 Date: November 15, 2017 Contractor: P Lawson Inc Client: Berlin Alejandro Leon Jakab Audrey Elizabheth | Permit type: Electrical permit | Permit status: Active | Completion date: November 15, 2017 | Permit id: 832305 | |||||
SCORE 100 Renovations: replace all piping with new, install 2- water closets, 2- lavatories, 2- showers tub, kitchen sink, area drain Date: June 29, 2017 Contractor: Brian Spigelmyer P And H Inc Client: Berlin Alejandro Leon Jakab Audrey Elizabheth | Permit type: Plumbing permit | Permit status: Active | Completion date: July 31, 2017 | Permit id: 795885 |