Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Repairs on leak btwn service and meter were done treespace 3x5 @ 2513 high street se, and ongoing monitoring thru ddot/siod. Also applicant is responsible for ensuring that typical/tcp on site is visible, clear and legible for ddot/siod inspectors to inspect including all signs. Date: October 7, 2011 Contractor: Dc Water Ops Permit type: Excavation; repair water service lateral | Permit status: Permit expired | Expiration date: April 9, 2012 | Permit id: Pa66301 | |||||
SCORE 82 Repairs on leak btwn service and meter were done treespace 3x5 @ 2513 high street se, and ongoing monitoring thru ddot siod. Also applicant is responsible for ensuring that typical tcp on site is visible, clear and legible for ddot siod inspectors to inspect including all signs. Date: October 7, 2011 Contractor: Dc Water Ops Permit type: Excavation; repair water service lateral | Permit status: Permit expired | Expiration date: April 9, 2012 | Permit id: Pa66301 | |||||
SCORE 82 Excavation; repair water service lateral Date: March 1, 2012 Contractor: Dc Water Ops Permit status: 8 | Expiration date: April 9, 2012 | Permit id: Pa66301 |