Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Demo center wall between 2 bedrooms on the third floor. Add a new bathroom on third floor. Permit type: Addition/alteration | Completion date: March 16, 2016 | Current use: Two-family | Parcel: 18954 | |||||
SCORE 56 Pour new concrete slab in basement Permit type: Addition/alteration | Completion date: January 18, 2017 | Current use: Two-family | Permit id: 0 | Parcel: 18954 | |||||
SCORE 100 Build a new insuite bath,replace all windows and open two wall at the kitchen (see drawings )relocate appliances and cabinets . Finish basement frame all the perimeter and spray foarm insulation open two eggres windows to left side ,build a new bath install new stairs ,replace all windows new plumbing, new eletric , relocate water and gas metters close all walls and ceiling leaving the cealing at 7 finishing Permit type: Addition/alteration | Completion date: March 20, 2017 | Current use: Two-family | Permit id: 0 | Parcel: 18954 |