Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: September 30, 2010 Client: Is3 25 Wharton Llc | Permit status: Completed | Permit id: 303849 | |||||
Use permit Date: May 27, 2016 Client: Is3 25 Wharton Llc | Permit status: Completed | Permit id: 695672 | |||||
Alteration permit Date: August 2, 2016 Client: Is3 25 Wharton Llc | Permit status: Completed | Permit id: 711728 | |||||
Alteration permit Date: August 2, 2016 Client: Is3 25 Wharton Llc | Permit status: Completed | Permit id: 711728 | |||||
Use permit Date: May 27, 2016 Client: Is3 25 Wharton Llc | Permit status: Completed | Permit id: 695672 | |||||
Alteration permit Date: January 25, 2017 Client: Is3 25 Wharton Llc | Permit status: Active | Permit id: 722331 | |||||
Demolition permit Date: November 10, 2016 Client: Is3 25 Wharton Llc | Permit status: Completed | Permit id: 735937 | |||||
Plumbing permit Date: September 30, 2010 Client: Is3 25 Wharton Llc | Permit status: Completed | Permit id: 303849 | |||||
SCORE 100 Alteration: interior plumbing for a fit-out of the 1st & 2nd partial (tenant a) for medical (non-ambulatory) & business offices. The permit includes a the connection of a new 5" main house drain into an existing 8" private sewer lateral in the parking lot. The installation will comply with the philadelphia plumbing code, 2004. Fuel gas piping is not part of this permit and requires a mechanical permit. Date: March 10, 2017 Contractor: Keith Ford Plumbing Co Inc Client: S3 25 Wharton Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 7, 2017 | Permit id: 758183 | |||||
SCORE 100 Remove and dispose of the existing roofing. Install 5. 5" poly iso. Install new . Tpo roof system. Install new 24 guage edge metal. Date: August 2, 2016 Contractor: Topline Construction Client: S3 25 Wharton Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: October 24, 2016 | Permit id: 711728 | |||||
SCORE 100 For interior and exterior alterations including to install acessible ramp and structural repairs for shell space as per plans. Separate permit required for tenant fit-out Date: December 2, 2016 Contractor: Axis Construction Mngmnt Llc Client: S3 25 Wharton Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: September 12, 2017 | Permit id: 727283 | |||||
SCORE 100 Install lighting, recepts, 600amp 3 phase service, 3 panels, lighting control, 5 roof top units, data as per 2008 nec. Install fire alarm as per nfpa72 (south district) Date: June 16, 2017 Contractor: Kenneth Meraw Client: S3 25 Wharton Llc | Permit type: Electrical permit | Permit status: Active | Completion date: June 16, 2017 | Permit id: 748671 | |||||
SCORE 100 Installation of an automatic fire suppression system in accordance with nfpa 13 throughout entire building to include new backflow prevention system and 4-inch fire service line as per approved plans. Date: April 13, 2017 Contractor: Mac Sprinkler Inc Client: S3 25 Wharton Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: August 7, 2017 | Permit id: 760892 | |||||
SCORE 100 Asbestos abatement required prior to the commencement of any work. For level ii alterations to an existing tenant space for the use of a dialysis center (business occupancy). Alterations to include the erection of partition walls, provide finishes and accessibility improvements throughout. Tenant space is fully sprinklered. All work to be done per approved plan. If field conditions vary contact design professional prior to the start of any work. Separate permits required for mechanical, electrical and plumbing work. Date: January 25, 2017 Contractor: Axis Construction Mngmnt Llc Client: S3 25 Wharton Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: September 1, 2017 | Permit id: 722331 | |||||
SCORE 100 Level 3 alterations for fit out of medical (non ambulatory) & business offices at 1st & 2nd floors of exist. Building including partition walls for open office, conference room & kitchenette spaces alongside all finish work; building to be fully sprinklered. Separate permit reqd for any mech., elec., plumb. & firesupp. Work. Asbestos abatement to be completed prior to start of work. Date: November 8, 2016 Contractor: Axis Construction Mngmnt Llc Client: S3 25 Wharton Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: September 28, 2017 | Permit id: 726073 | |||||
SCORE 100 For the installation of a new hvac system including six (6) rooftop units, three (3) gas fired furnace split systems, ductwork, registers and diffusers as per plans. Date: February 1, 2017 Contractor: Direct Air Llc Client: S3 25 Wharton Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 23, 2017 | Permit id: 751218 | |||||
SCORE 100 Install lighting, recepts, 600amp 3 phase service, 4 panels, lighting control, 5 roof top units, elevator, nurse call intercom & data as per 2008 nec (sosuth district) Date: May 23, 2017 Contractor: Kenneth Meraw Client: S3 25 Wharton Llc | Permit type: Electrical permit | Permit status: Expired | Completion date: May 23, 2017 | Permit id: 754530 | |||||
SCORE 100 Alterations:interior plumbing; fit out of medical & business offices;1st floor health care facility - the installation will comply with the philadephia plubming code 2004 Date: April 5, 2017 Contractor: Keith Ford Plumbing Co Inc Client: S3 25 Wharton Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 28, 2017 | Permit id: 764864 | |||||
Subdivision of property. Parcel a existing building with medical dental health practioner group practioner and professional offices. No change in use is proposed a pylon sigh for existing medical office is proposed per attached plans. Parcel b new retail staore with retail sales of consumer goods and pre package foods. Pylon sign, building sign and relate4d parking and landscaping proposed as per attached plans Date: June 13, 2017 Client: S3 25 Wharton Llc | Permit type: Zoning permit | Permit status: Completed | Completion date: June 13, 2017 | Permit id: 790218 | |||||
Parcel b new retail staore with retail sales of consumer goods and pre package foods. Pylon sign, building sign and relate4d parking and landscaping proposed as per attached plans Date: June 30, 2017 Client: S3 25 Wharton Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 30, 2017 | Permit id: 796346 | |||||
SCORE 100 For the erection of an one (1) story detached structure of type vb construction as per plans. Separate permits required for all mechanical, electrical plumbing and fire suppression work. Date: August 23, 2017 Contractor: Axis Construction Mngmnt Llc Client: S3 25 Wharton Llc | Permit type: New construction permit | Permit status: Active | Completion date: November 1, 2017 | Permit id: 800942 | |||||
SCORE 100 For the installation of a mechanical system to include registers diffusers, supply exhaust ductwork, appliances, and roof top units as per approved plans. Separate permit required for any electrical and plumbing work. Date: October 25, 2017 Contractor: Direct Air Llc Client: S3 25 Wharton Llc | Permit type: Mechanical permit | Permit status: Active | Completion date: November 15, 2017 | Permit id: 807257 | |||||
SCORE 100 Provide 1 amp service for construction trailor (temp power service) as per 2008 nec. Date: September 11, 2017 Contractor: Kenneth Meraw Client: S3 25 Wharton Llc | Permit type: Electrical permit | Permit status: Active | Completion date: September 11, 2017 | Permit id: 815040 | |||||
SCORE 100 Insall rough & finish plumbing for 2 ada restrooms. Mop receptor and water cooler for new dollar tree - the installation will compy with the philadephia plumbing code 2004 Date: November 10, 2017 Contractor: Joseph T Miller Co Inc Client: S3 25 Wharton Llc | Permit type: Plumbing permit | Permit status: Active | Completion date: November 10, 2017 | Permit id: 816243 | |||||
SCORE 100 Install one illuminated, flatwall, channel letter sign 152" x 86" Date: October 4, 2017 Contractor: Futura Identities Client: S3 25 Wharton Llc | Permit type: Sign permit | Permit status: Active | Completion date: October 25, 2017 | Permit id: 817422 | |||||
SCORE 100 Reduce water meter 2" to 5 8" Date: September 30, 2010 Contractor: Norman Cole Sr, Client: S3 25 Wharton Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 12, 2011 | Permit id: 303849 | |||||
For a medical, dental, health practitioner ( group practitioner) at first floor and accessory office from first floor through mezzanine in an existing structure. No sign on this application. Date: May 27, 2016 Client: S3 25 Wharton Llc | Permit type: Use permit | Permit status: Completed | Completion date: May 27, 2016 | Permit id: 695672 | |||||
For a medical, dental, health practitioner ( group practitioner) at first floor in the same building business and professional offices from first floor partial through mezzanine in an existing structure. No sign on this application. Date: June 3, 2016 Client: S3 25 Wharton Llc | Permit type: Use permit | Permit status: Completed | Completion date: June 3, 2016 | Permit id: 697077 | |||||
Interior fit out as per plans. Separate permits required for m, e, p. Date: December 11, 2017 Client: S3 25 Wharton Llc | Permit type: Alteration permit | Permit status: Active | Completion date: December 11, 2017 | Permit id: 814929 |