Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
At 1st floor apartment : properly repair the three leaking radiators in the bath room, living room and apartment hallway. Bring all three radiator to p Date: December 20, 2010 Permit type: Plumb | Permit id: Eb17819 | |||||
Trace and repair all conceal water leaks from top fl apt and center fl apt bathrooms. Demo and replace all defective sheet rock ceiling and walls in Date: October 4, 2011 Permit type: Gc | Permit id: Ec08648 | |||||
At 2nd floor kitchen remove acoustic tile ceiling and install new sheetrock ceiling in the kitchen. Approx: sq ft. Prime and paint new ceiling Date: February 9, 2012 Permit type: Gc | Permit id: Ec20189 | |||||
Clear stoppage, pump out all water and sewage from cellar; set aside all tools, equipment and other house hold items. Vaccum dry and spread lime thro Date: November 29, 2010 Permit type: Stopag | Permit id: Eb15758 | |||||
SCORE 100 Equipment work Date: October 24, 2016 Contractor: Emma Group Management Inc Permit status: Permit issued | Permit id: 32146927301 | |||||
SCORE 86 Plumbing Date: October 31, 2016 Contractor: Plbg Inc Permit status: Permit issued | Permit id: 32146927301 | |||||
As per mini rc # 2011140510201 (ny enviornmental & mtrl lab) perform air sampling and analysis in accordance with hpd mini requirement contract specif Date: January 20, 2011 Permit type: Asbest | Permit id: Eb18529 | |||||
As per mini rc # 2011000423501 (eas) and hpd specification, perform polarized light microscopy (plm) analysis of 5 samples for asbestos content util Date: January 5, 2011 Permit type: Asbest | Permit id: Eb18171 | |||||
Remove existing heating plant and install new boiler. Install new cast iron/steel gas boiler to supply adequate heat to building. Supply and install Date: December 23, 2010 Permit type: Heat | Permit id: Eb18129 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: July 1, 2012 Permit type: Util | Permit id: Ed00726 | |||||
As per rc # 2010140911101 (b&n&k), perform asbestos abatement work as per hpd specification throughout cellar, on 34 ft. Of pipe insulation and 25 sq Date: February 5, 2011 Permit type: Asbest | Permit id: Eb18521 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: July 1, 2011 Permit type: Util | Permit id: Ec00499 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: July 1, 2013 Permit type: Util | Permit id: Ee01780 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: December 13, 2010 Permit type: Util | Permit id: Eb17293 | |||||
Do all necessary repairs to the gas fired boiler to provide an adequate supply of heat to all the apartments in the entire building. Remove all work Date: December 21, 2010 Permit type: Heat | Permit id: Eb17821 | |||||
Nationalgrid provide gas to boiler hot water heater Date: March 6, 2012 Permit type: Util | Permit id: Ec23986 | |||||
Nationalgrid provide gas to boiler hot water heater Date: December 13, 2010 Permit type: Util | Permit id: Eb17293 | |||||
Nationalgrid provide gas to boiler hot water heater Date: July 1, 2013 Permit type: Util | Permit id: Ee01780 | |||||
Nationalgrid provide gas to boiler hot water heater Date: July 1, 2011 Permit type: Util | Permit id: Ec00499 | |||||
Remove existing heating plant and install new boiler. Install new cast iron steel gas boiler to supply adequate heat to building. Supply and install Date: December 23, 2010 Permit type: Heat | Permit id: Eb18129 |