Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
After hours permit to work from 7am to 7pm on sunday inconjunction with d-dot permit # 10078856 Date: November 16, 2012 Client: Washngton Dc | Applicant: Francisco Crane Rental Co. Inc. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300143 | |||||
After hours permit to work from 7pm saturday to 7pm sunday inconjunction with d-dot permit # 10077031 Date: October 25, 2012 Client: Washington Dc | Applicant: Francisco Cranerental Co. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300079 | |||||
Demolition of two decommissioned cooling towers and removal of associated above ground piping, concrete piping supports, adjacent light poles and minor underground piping, fill basin with 57 stones. Date: February 3, 2012 Client: Architect Of The Capitol | Applicant: Architect Of The Capitol; Christopher Potter | Permit type: Demolition | Permit status: Permit issued | Permit id: D1200317 | |||||
Demo-removal-excavation and disposal of concrete pad and adjacent materials. Work will be performed on private property, as per plans, for the united state of america architect of the capitol, capitol power plant. Date: October 31, 2013 Client: Usa Architect Of The Capitol Capitol Power Plant. | Applicant: Rps, Inc. | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1400851 | |||||
The proposed work consist on drilling soil borings will be installed using a track-mounted dpt rig to a depth than feet below ground surface. Dpt provides time and cost efficiencies over traditional drilling methods by utilizing small diameter holes that minimize surface/subsurface disturbances and the generation of investigation derived wages, as per site plans, work plans report, dc well construction application and dc well schematic form for the architect of the capitol/central power plant. Diameter boar hold 2. 25. Date: August 20, 2013 Client: Architect Of The Capitol | Applicant: Rapid Permit Service, Inc. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300309 | |||||
Number of borings:7 depth of borings: ft diameter of hole: 4 inches drilling method: 2 1/4 inch hollow stem auger Date: June 5, 2013 Client: Chris Potter Poc: Architect Of The Capitol | Applicant: Eoin Durcan Poc: Schnabel Engineering | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300241 | |||||
Alteration/repair and demo removal of pcb contaminated concrete flooring in two rooms of plant, no replacement, to existing industrial power and steam generation plant, as per site plans and memo. Date: November 5, 2014 Client: District Of Columbia-Usa Architect Of The Capitol | Applicant: Rps, Inc. | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1501185 | |||||
SCORE 100 Alteration/repair and demo removal of pcb contaminated concrete flooring in two rooms of plant, no replacement, to existing industrial power and steam generation plant, as per site plans and memo. Date: November 5, 2014 Contractor: Rps Inc Client: District Of Columbia-Usa Architect Of The Capitol | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1501185 | |||||
SCORE 100 Demo-removal-excavation and disposal of concrete pad and adjacent materials. Work will be performed on private property, as per plans, for the united state of america architect of the capitol, capitol power plant. Date: October 31, 2013 Contractor: Rps Inc Client: Usa Architect Of The Capitol Capitol Power Plant. | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1400851 | |||||
SCORE 56 Demolition of two decommissioned cooling towers and removal of associated above ground piping, concrete piping supports, adjacent light poles and minor underground piping, fill basin with 57 stones. Date: February 3, 2012 Contractor: Architect Of The Capitol Christopher Potter Client: Architect Of The Capitol | Permit type: Demolition | Permit status: Permit issued | Permit id: D1200317 | |||||
SCORE 86 The proposed work consist on drilling soil borings will be installed using a track-mounted dpt rig to a depth than feet below ground surface. Dpt provides time and cost efficiencies over traditional drilling methods by utilizing small diameter holes that minimize surface/subsurface disturbances and the generation of investigation derived wages, as per site plans, work plans report, dc well construction application and dc well schematic form for the architect of the capitol/central power plant. Diameter boar hold 2. 25. Date: August 20, 2013 Contractor: Rapid Permit Service Inc Client: Architect Of The Capitol | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300309 | |||||
SCORE 96 The scope of work is the removal of 5 linear feet of exterior security fence that will be replaced with a turnstile assembly along with the installation of linear feet of concrete sidewalk on the secure side of the fence Date: March 11, 2016 Contractor: Kim Mitchell Cdkm Consulting Llc Client: Capital Power Plant - Turnstile Gate | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1600038 | |||||
SCORE 56 Demolition of two decommissioned cooling towers and removal of associated above ground piping, concrete piping supports, adjacent light poles and minor underground piping, fill basin with 57 stones. Date: February 3, 2012 Contractor: Architect Of The Capitol; Christopher Potter Client: Architect Of The Capitol | Permit type: Demolition | Permit status: Permit issued | Permit id: D1200317 | |||||
SCORE 93 After hours permit to work from 7pm saturday to 7pm sunday inconjunction with d-dot permit # 10077031 Date: October 25, 2012 Contractor: Francisco Cranerental Co Client: Washington Dc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300079 | |||||
SCORE 56 After hours permit to work from 7am to 7pm on sunday inconjunction with d-dot permit # 10078856 Date: November 16, 2012 Contractor: Francisco Crane Rental Co. Inc Client: Washngton Dc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300143 | |||||
SCORE 89 Demo-removal-excavation and disposal of concrete pad and adjacent materials. Work will be performed on private property, as per plans, for the united state of america architect of the capitol, capitol power plant. Date: October 31, 2013 Contractor: Rps, Inc Client: Usa Architect Of The Capitol Capitol Power Plant. | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1400851 | |||||
SCORE 86 The proposed work consist on drilling soil borings will be installed using a track-mounted dpt rig to a depth than feet below ground surface. Dpt provides time and cost efficiencies over traditional drilling methods by utilizing small diameter holes that minimize surface subsurface disturbances and the generation of investigation derived wages, as per site plans, work plans report, dc well construction application and dc well schematic form for the architect of the capitol central power plant. Diameter boar hold 2. 25. Date: August 20, 2013 Contractor: Rapid Permit Service, Inc Client: Architect Of The Capitol | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300309 | |||||
SCORE 89 Alteration repair and demo removal of pcb contaminated concrete flooring in two rooms of plant, no replacement, to existing industrial power and steam generation plant, as per site plans and memo. Date: November 5, 2014 Contractor: Rps, Inc Client: District Of Columbia-Usa Architect Of The Capitol | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1501185 | |||||
SCORE 56 This project includes erosion and sediment control measures for the addition of two concrete pads to the exterior of an existing building within the capital power plant campus. Date: October 20, 2015 Contractor: Tony Buscemi; Tony Buscemi Client: U. S. Government Capitol Power Plant | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1600006 | |||||
SCORE 96 The scope of work is the removal of 5 linear feet of exterior security fence that will be replaced with a turnstile assembly along with the installation of linear feet of concrete sidewalk on the secure side of the fence Date: March 11, 2016 Contractor: Kim Mitchell Cdkm Consulting, Llc Client: Capital Power Plant - Turnstile Gate | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1600038 | |||||
SCORE 59 Number of borings:7 depth of borings: ft diameter of hole: 4 inches drilling method: 2 1/4 inch hollow stem auger Date: June 5, 2013 Contractor: Eoin Durcan Poc: Schnabel Engineering Client: Chris Potter Poc: Architect Of The Capitol | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300241 | |||||
SCORE 56 We will perform a total of 5 soil borings on the proposed site. Four of the borings will be drilled to a depth of feet below existing grades and one of the borings will be drilled to a depth of feet below existing grades. The borings will be located within the bounds of the private property. The borings will be drilled utilizing 4. 25 hollow stem, continuous flight augers and/or mud rotary drilling. The borings will be performed utilizing a truck-mounted drill rig and will generate an approximate 6 inch annulus. After geotechnical exploration is completed, the borings/auger probes will be backfilled with bentonite slurry, which has a consistency of two pounds of bentonite powder to one gallon of water. Borehole/auger probe abandonment will be performed by tremie-grouting via a positive displacement pump from the bottom of the borehole/auger probe. Date: February 18, 2016 Contractor: Ecs Midatlanti C O Rod Betanzo Client: United States Of America | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600119 |