Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
![]() Permit status: Closed | Permit id: 04-01946 | |||||
Residential ![]() ![]() Permit status: Closed | Permit id: 04-01946 | |||||
SCORE 99 Residential walkway for banks residence;scc; setbacks along street right of ways must be measured from the street right of way line or the street, whichever is closest to the property. All other setbacks are to be measured from the property boundary lines. Setbacks also apply such items as porches, decks, patios, etc.; building permit for construction of an inclined walkway for the purpose of enhancing the "independent living" of the occupant of the dwelling. Project is part of the annual mountain housing opportunities, inc. "ramp festival" where volunteers construct temporary ramps for those in need. Building safety is permitting these temporary ramps to be constructed with pressure treated wood footing blocks placed above ground (0. Pcf treated "ground contact" lumber). Maximum height of ramps or landings not to exceed 4 ft. Without the installation of additional anchorage or lateral bracing. Ramp slopes will not exceed 1: 12. The building inspector shall be contacted to inspect the Client: Elev. Ealk Way Selby | Permit type: Res: accessory structure | Permit status: Closed | Current use: Residential | Permit id: 04-01946 | Parcel: 11070 |