Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dccr proposes to drill one geotechnical boring (pragi-56) located in an alley between calvert st nw and beecher st nw, west of the listed property (2444 tunlaw rd nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and att Date: November 3, 2015 Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa118675 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (pragi-56) located in an alley between calvert st nw and beecher st nw, west of the listed property (2444 tunlaw rd nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and att Date: November 3, 2015 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa118675 | |||||
SCORE 56 Moving truck Date: April 18, 2015 Contractor: Michael Padula Permit status: Permit expired | Expiration date: April 25, 2015 | Permit id: Pa10185425 | |||||
SCORE 79 Construction staging area Date: November 13, 2015 Contractor: Mark Fletcher Salut, Inc Permit status: Permit expired | Expiration date: December 17, 2015 | Permit id: Pa10219371 | |||||
SCORE 80 Moving truck Date: December 15, 2016 Contractor: Mark Linton Permit status: Permit expired | Expiration date: December 16, 2016 | Permit id: Pa10359236 | |||||
SCORE 80 Moving truck Date: June 9, 2017 Contractor: Mark Linton Permit status: Permit expired | Expiration date: June 13, 2017 | Permit id: Pa10425549 |