Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd no. Of modules: 14 no. Of inverters: 1 total system size in kilowatts: 4. 45 new 1 amp svc per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 3, 2011 Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: November 14, 2011 | Permit id: Pds2011-1031-20 | |||||
Roof mount residential solar pv for existing sfd no. Of modules 14 no. Of inverters 1 total system size in kilowatts 4. 45 new 1 amp svc per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 3, 2011 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 14, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 Roof mount residential solar pv for existing sfd no. Of modules 14 no. Of inverters 1 total system size in kilowatts 4. 45 new 1 amp svc per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 3, 2011 Contractor: N B Baker Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 14, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 82 Windows and/or sliding glass door replacements with the same net openable area. (replacement windows must meet state of california energy code requirements for u-factor and shgc for package d of the applicable climate zone (see pds #409). Also, per county building code 704a. 3. 2. 2; windows shall be dual-glazed with a minimum of one tempered pane, and glazing frames made of vinyl shall have welded corners and metal reinforcing in the interlock area.) Date: February 1, 2016 Contractor: C C W And D Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 14, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: April 12, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Final Date: November 8, 2011 Permit status: Pass | Permit id: Pds2011-1031-20 |