Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Total tear-off & reroof of sfd, 24 squares of asphalt shingles on a pitch represented as 4 12 and 2. 5 squares on a pitch represented as 1 12. Wrappers shall bear a label demonstrating compliance with astm d 3161 class f; or astm d 7158, class g, for east of broadway only; or astm d 3161 class h for the entire city. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. ![]() ![]() Client: Ena Russell | Applicant: J M Jacobs Inc | Permit type: Roofing | Permit status: Cmp | Completion date: April 6, 2015 | Current use: Single family d | |||||
SCORE 96 Total tear-off & reroof of sfd, 24 squares of asphalt shingles on a pitch represented as 4 12 and 2. 5 squares on a pitch represented as 1 12. Wrappers shall bear a label demonstrating compliance with astm d 3161 class f; or astm d 7158, class g, for east of broadway only; or astm d 3161 class h for the entire city. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: Ena Russell | Permit type: Roofing | Permit status: Cmp | Completion date: April 6, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-01127 |