Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: December 15, 2008 Client Company: Honeywell International | Permit status: Completed | Permit id: 192802 | |||||
Zoning/use permit Date: August 27, 2009 Client Company: Honeywell International | Permit status: Completed | Permit id: 230576 | |||||
Addition permit Date: January 3, 2011 Client Company: Honeywell International | Permit status: Completed | Permit id: 306463 | |||||
Electrical permit Date: September 8, 2015 Client Company: Honeywell International | Permit status: Completed | Permit id: 637166 | |||||
Electrical permit Date: July 8, 2011 Client Company: Honeywell International | Permit status: Expired | Permit id: 347822 | |||||
Alteration permit Date: April 26, 2010 Client Company: Honeywell International | Permit status: Completed | Permit id: 270924 | |||||
Alteration permit Date: September 15, 2014 Client Company: Honeywell International | Permit status: Completed | Permit id: 554309 | |||||
Operations permit Date: August 20, 2014 Client Company: Honeywell International | Permit status: Completed | Permit id: 23082 | |||||
Mechanical permit Date: November 19, 2010 Client Company: Honeywell International | Permit status: Completed | Permit id: 312292 | |||||
Electrical permit Date: June 6, 2014 Client Company: Honeywell International | Permit status: Completed | Permit id: 531616 | |||||
Suppression permit Date: November 13, 2013 Client Company: Honeywell International | Permit status: Completed | Permit id: 500620 | |||||
New construction permit Date: November 18, 2014 Client Company: Honeywell International | Permit status: Completed | Permit id: 567538 | |||||
Mechanical permit Date: December 31, 2008 Client Company: Honeywell International | Permit status: Completed | Permit id: 189373 | |||||
Electrical permit Date: September 6, 2016 Client Company: Honeywell International | Permit status: Active | Permit id: 719725 | |||||
Alteration permit Date: March 5, 2013 Client Company: Honeywell International | Permit status: Completed | Permit id: 452979 | |||||
Zoning/use permit Date: October 4, 2010 Client Company: Honeywell International | Permit status: Completed | Permit id: 302459 | |||||
Alteration permit Date: August 27, 2009 Client Company: Honeywell International | Permit status: Completed | Permit id: 226540 | |||||
Suppression permit Date: November 1, 2010 Client Company: Honeywell International | Permit status: Completed | Permit id: 309412 | |||||
Plumbing permit Date: November 5, 2010 Client Company: Honeywell International | Permit status: Completed | Permit id: 310256 | |||||
Electrical permit Date: November 24, 2010 Client Company: Honeywell International | Permit status: Completed | Permit id: 311874 | |||||
Operations permit Date: November 23, 2015 Client Company: Honeywell International | Permit status: Completed | Permit id: 23912 | |||||
Mechanical permit Date: March 5, 2013 Client Company: Honeywell International | Permit status: Completed | Permit id: 454148 | |||||
New construction permit Date: October 14, 2010 Client Company: Honeywell International | Permit status: Completed | Permit id: 301697 | |||||
Electrical permit Date: April 29, 2009 Client Company: Honeywell International | Permit status: Completed | Permit id: 194090 | |||||
Fast form building permit Date: November 19, 2008 Client Company: Honeywell International | Permit status: Completed | Permit id: 189013 | |||||
Plumbing permit Date: March 11, 2013 Client Company: Honeywell International | Permit status: Completed | Permit id: 458133 | |||||
Alteration permit Date: December 4, 2008 Client Company: Honeywell International | Permit status: Completed | Permit id: 188639 | |||||
Suppression permit Date: December 12, 2013 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 504507 | |||||
Zoning use permit Date: October 4, 2010 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 302459 | |||||
Plumbing permit Date: December 15, 2008 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 192802 | |||||
Operations permit Date: November 23, 2015 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 23912 | |||||
Mechanical permit Date: March 5, 2013 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 454148 | |||||
Mechanical permit Date: October 18, 2016 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Active | Permit id: 723259 | |||||
Electrical permit Date: September 16, 2016 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Active | Permit id: 722469 | |||||
Electrical permit Date: April 29, 2009 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 194090 | |||||
New construction permit Date: November 18, 2014 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 567538 | |||||
Alteration permit Date: March 5, 2013 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 452979 | |||||
Alteration permit Date: August 27, 2009 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 226540 | |||||
Alteration permit Date: September 15, 2014 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 554309 | |||||
Electrical permit Date: November 24, 2010 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 311874 | |||||
Electrical permit Date: September 8, 2015 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 637166 | |||||
Electrical permit Date: June 6, 2014 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 531616 | |||||
Fast form building permit Date: November 19, 2008 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 189013 | |||||
Suppression permit Date: November 1, 2010 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 309412 | |||||
Alteration permit Date: December 4, 2008 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 188639 | |||||
New construction permit Date: October 14, 2010 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 301697 | |||||
Zoning use permit Date: August 27, 2009 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 230576 | |||||
Plumbing permit Date: November 5, 2010 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 310256 | |||||
Mechanical permit Date: December 31, 2008 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 189373 | |||||
Electrical permit Date: July 8, 2011 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Expired | Permit id: 347822 | |||||
Plumbing permit Date: March 11, 2013 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 458133 | |||||
Addition permit Date: January 3, 2011 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 306463 | |||||
Alteration permit Date: October 26, 2010 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 306520 | |||||
Operations permit Date: August 20, 2014 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 23082 | |||||
Mechanical permit Date: November 19, 2010 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Permit id: 312292 | |||||
SCORE 92 Install 1 new 125amp outdoor sub-panel to be powered from existing power panel in building 9. Install (2)20amp branch circuits to power heat trace circuits per 2008 nec (chemical plant) Date: March 22, 2017 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Completed | Completion date: July 14, 2017 | Permit id: 756949 | |||||
SCORE 92 Replace conduit and wire for 4 existing 30amp motors in building 9 pump area. Install 16 new lights on the existing light circuit in the building 9 pump area per 2008 nec (chemical plant) Date: March 29, 2017 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Expired | Completion date: March 29, 2017 | Permit id: 756948 | |||||
SCORE 99 Foundation, platform construction, dike explansion. Date: August 27, 2009 Contractor: Frank V Radomski And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Alteration permit | Permit status: Completed | Completion date: June 28, 2010 | Permit id: 226540 | |||||
SCORE 92 Install (3) 100a disconnects in parking lot area for temporary power connection to temporary work trailers on site from 9 8 15 to 12 8 15. Hook up power to (2) temporary trailers. Install ground rod as per 2008 nec (east district) Date: September 8, 2015 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Completed | Completion date: April 8, 2016 | Permit id: 637166 | |||||
SCORE 92 Installation of conduit and wire to 2 transfer pump from existing mcc with 2 new compartments,install 2 vfd cabinets and 1 relay cabinetfurnished by customer,installation of conduit and wire to four premanufactured skids w 6 self contained pumps from vfd cabinets,21 related instrumentation tied into an existing control process system as per 2008 nec(east district) Date: September 8, 2015 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Expired | Completion date: September 8, 2015 | Permit id: 630382 | |||||
SCORE 59 Install new gas line from new pgw substation to existing gasline that ties into existing equipment. Work to installation of foundations and pipeline support structures. Date: October 18, 2016 Contractor: M. Davis And Sons Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 14, 2017 | Permit id: 723259 | |||||
SCORE 92 Replace consuit and wire for 2 - 150amp motors in unit 2 from the exitting boiler house mcc as per 2008 nec (east district) Date: March 29, 2017 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Completed | Completion date: July 14, 2017 | Permit id: 762295 | |||||
SCORE 92 Replace inkind (2) watts backflow preventors (individual service) and (1) emergency safety eye wash shower. Date: March 15, 2017 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 19, 2017 | Permit id: 766780 | |||||
SCORE 92 Replace conduit and wire for 2 existing 30amp motors in building 9 pump area as per 2008 nec (east district) Date: April 28, 2017 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Expired | Completion date: April 28, 2017 | Permit id: 768623 | |||||
SCORE 92 Install (2) 30a disconnects with 2 vfds in the existing electrical room. Install 2 new 225a 120v electrical panels in the existing electrical room with branch wiring as per 2008 nec (east district) Date: September 6, 2016 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Expired | Completion date: September 6, 2016 | Permit id: 707672 | |||||
SCORE 92 Installation of conduit and cable to hook up temp power for construction trailer (manufacturing plant)east district Date: September 6, 2016 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Completed | Completion date: August 1, 2017 | Permit id: 719725 | |||||
SCORE 92 Install a new 30a breaker in the existing mcc in bldg9 & install new conduit & wire to power the replaced heat trace distrubution box from the existing mcc as per nec 2008 east district Date: February 6, 2017 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Expired | Completion date: February 6, 2017 | Permit id: 743565 | |||||
SCORE 92 Replace 2 existing aerial quadrraplex cables from building 9 to contractor break area via existing pipe bridge, and re route aerial cable from bldg 9 to existing compactor area, install 200amp fused disconnect at existing pole connect load side of disconnect to contractor supplied temp skid for power for fabrication area as per 2008 nec (east district) Date: December 14, 2016 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Completed | Completion date: March 23, 2017 | Permit id: 735562 | |||||
Remove and replace certain exterior, concrete slabs and containment walls (dikes) to include temp support and shoring of existing processing equipment to remain, wall foundations, stair bridges, guardrails, handrails, temp dikes and linear sumps and grating alia. Date: June 16, 2017 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Alteration permit | Permit status: Active | Completion date: July 7, 2017 | Permit id: 779156 | |||||
SCORE 92 Install 2 new mcc 400amp 3 pole, 600volt horizontal sections to the existing mcc 25 a and mcc 25 b, 2 feed conduits to 2 fused disconnects, 350amp, 4 load side conduits and wire to vendor supplied air compressor vfds as per 2008 nec (east district) Date: August 17, 2017 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Active | Completion date: August 17, 2017 | Permit id: 796916 | |||||
SCORE 100 Install 3 equipment drain,2 sinks,1 emergency shower Date: November 5, 2010 Contractor: Star Plumbing And Heating Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 24, 2011 | Permit id: 310256 | |||||
SCORE 99 Ductwork and mechanicals installation to serve renovated laboratory approved under permit 306520 Date: November 19, 2010 Contractor: Frank V Radomski And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 5, 2011 | Permit id: 312292 | |||||
SCORE 68 Install new 3 phase panel,install new hvac unit,install outlets and lighting as per 2008 nec Date: November 24, 2010 Contractor: Charles R. Carter Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Completed | Completion date: January 20, 2011 | Permit id: 311874 | |||||
SCORE 68 New service to a blast resistant control room , a new ground grid, main and back up feeder to be installed, 1 45kva and 1 15 kva transformers to be installed, with a ups, auto transfer switch, 480volt panel board and aerial cable to be installed, please note special variance was granted by the pa department of labor as per 2008 nec, Date: July 8, 2011 Contractor: Charles R. Carter Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Expired | Completion date: July 12, 2011 | Permit id: 347822 | |||||
SCORE 99 Create two new toilet rooms on the first story of building 16 and in accordance with the following submitted drawings. Date: March 5, 2013 Contractor: Frank V Radomski And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Alteration permit | Permit status: Completed | Completion date: April 22, 2013 | Permit id: 452979 | |||||
SCORE 99 Installation of exhaust system for two new toilet rooms on the first story of building 16 and in accordance with the following submitted drawings. See a p 452979 for plan Date: March 5, 2013 Contractor: Frank V Radomski And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 22, 2013 | Permit id: 454148 | |||||
SCORE 100 For installing an automatic clean agent fire suppression system as pe nfpa 2001 in the south i o room. Date: December 12, 2013 Contractor: Suppression Systems Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Suppression permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 504507 | |||||
SCORE 99 Install new branch lines and heads off of existing riser in existing fire suppression system in accordance with nfpa 13. All work shall comply with the approved plans. All work shall be performed by a fire suppression contractor licensed by the city of philadelphia. Date: November 13, 2013 Contractor: Wayman Fire Protection Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Suppression permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 500620 | |||||
SCORE 100 Install 2 water closets, 2 lavs, 1 urinal and 1 sink Date: March 11, 2013 Contractor: Star Plumbing And Heating Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 22, 2013 | Permit id: 458133 | |||||
SCORE 99 Install a prefabricated, blast resistant control room on a pre-existing concrete foundation Date: January 3, 2011 Contractor: Frank V Radomski And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Addition permit | Permit status: Completed | Completion date: August 11, 2011 | Permit id: 306463 | |||||
SCORE 99 Renovations to existing laboratory Date: October 26, 2010 Contractor: Frank V Radomski And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Alteration permit | Permit status: Completed | Completion date: April 6, 2011 | Permit id: 306520 | |||||
For demolition of existing exterior walls of one (1) story utility building & for the erection of ext. Metal panel walls w. New roof assembly on exist. Framing. Date: September 15, 2014 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Alteration permit | Permit status: Completed | Completion date: April 24, 2016 | Permit id: 554309 | |||||
SCORE 92 Relocate and replace 2 sections of mcc equipment and install new conduit and wiring for 27 motors and fire alarm relocate and secure 2 heat detectors and 1 horn strobe per 2008 nec & nfpa 72 (chemical plant) Date: June 6, 2014 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Completed | Completion date: August 22, 2016 | Permit id: 531616 | |||||
SCORE 100 Relocate 7 sprinkler heads Date: November 1, 2010 Contractor: Oliver Sprinkler Co Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Suppression permit | Permit status: Completed | Completion date: May 24, 2011 | Permit id: 309412 | |||||
SCORE 92 Installation of (6)3 4hp feeds from vfds to power 6 new pumps. Install 1 45kva transformer feed from exist mcc 26a1 to feed 2 power pnls. Install 2 power 120v 100a power pnls to feed heat trace,instruments and lights. Install heat trace for pipes,6 led lights on the 2nd fl and 2 on ground fl per 2008 nec (chemical manufacturing facility)east district Date: December 5, 2016 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Expired | Completion date: December 5, 2016 | Permit id: 728563 | |||||
For the erection of a steel platform. Size and location as shown on the application. Existing chemical manufacturing plant. Date: August 27, 2009 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 11, 2014 | Permit id: 230576 | |||||
SCORE 100 Hotworks: welding cutting soldering torch work - permit expires 08 20 2015 Date: August 20, 2014 Contractor: Honeywell International Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Operations permit | Permit status: Completed | Permit id: 23082 | |||||
SCORE 100 Hotworks: welding cutting soldering torch work - permit expires 08 20 2016 Date: November 23, 2015 Contractor: Honeywell International Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Operations permit | Permit status: Completed | Permit id: 23912 | |||||
Platform alterations, replacing operator shanty with prefab shanty at track loading area platform in existing oil refinery field plant, as per submitted plans. Date: April 26, 2010 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Alteration permit | Permit status: Completed | Completion date: May 4, 2010 | Permit id: 270924 | |||||
SCORE 56 Hotworks: welding cutting soldering torch work - permit expires: 4 11 18 Date: April 11, 2017 Contractor: Advansix Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Operations permit | Permit status: Completed | Permit id: 24756 | |||||
SCORE 99 Demolition of existing structure and construction of foundation only. Separate building permit required for construction of structure. Date: October 14, 2010 Contractor: Frank V Radomski And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: New construction permit | Permit status: Completed | Completion date: September 17, 2012 | Permit id: 301697 | |||||
SCORE 99 For the erection of three (3) trailers ( all to be connected as one ), size and location as shown in application. For use a support offices to include a lunch room, on an existing lot with a chemical manufacturing facility, no signs on this application. Date: October 4, 2010 Contractor: Frank V Radomski And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 11, 2014 | Permit id: 302459 | |||||
SCORE 99 For the complete demolition of an existing structure and for the construction of a one (1) story detached structure. Size and location as shown on the application. For use as a control room on an existing lot with a chemical manufacturing facility. Date: October 14, 2010 Contractor: Frank V Radomski And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 11, 2014 | Permit id: 306148 | |||||
SCORE 99 Renovations as per plans. Date: December 4, 2008 Contractor: Frank V Radomski And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Alteration permit | Permit status: Completed | Completion date: April 28, 2009 | Permit id: 188639 | |||||
SCORE 92 Installation of temp power skid with line side disconnect,transform & load ctr for distribution and aerial cable fed from main distribution ctr. Install 6 local disconnect fed from load center with 4 temp trailer hook ups per 2008 nec (commercial) Date: January 8, 2016 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Expired | Completion date: January 8, 2016 | Permit id: 662401 | |||||
SCORE 92 Installation of conduit and cable to hook up 1-60amp generator, temporary power for construction trailer less than for about 3 months as per 2008 nec (east district) Date: February 17, 2016 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Expired | Completion date: February 17, 2016 | Permit id: 670223 | |||||
SCORE 100 Fast form building permit Date: November 19, 2008 Contractor: Oliver Sprinkler Co Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit status: Completed | Completion date: April 14, 2009 | Permit id: 189013 | |||||
Hvac ductwork as per plans. Date: December 31, 2008 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 28, 2009 | Permit id: 189373 | |||||
SCORE 100 2nd and 3rd floors of this office, install 2 wc, 2 lav, 1 ur, 3 floor drain, 1 mop sink, 5 hood drains. Date: December 15, 2008 Contractor: Star Plumbing And Heating Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 12, 2009 | Permit id: 192802 | |||||
SCORE 100 Office renovation:adding new lts, recepts, switching. Adding two electrical panels being connected to exiting panell. Power wiring to new hvac equipment,as per 2005 nec, replace or relocate devices on existing approved fa system, as per nfpa-72(east dist) Date: April 29, 2009 Contractor: Vasoli Electric Co Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Completed | Completion date: December 1, 2009 | Permit id: 194090 | |||||
SCORE 92 Install of conduit & wire from 8-existing motor starters to 8-replacement pumps 4-30a & 4-10a of existing 400amp service & 2-new led lights using a spare ckt in an existing 200a power panel (work being done in a classified no hazard location) Date: September 16, 2016 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Completed | Completion date: March 14, 2017 | Permit id: 722469 | |||||
Demolition of existing pile cap tank support and installation of new micro piles and pile cap tank support for tank vt-617 in the east tank farm as per approved plans. Date: November 18, 2014 Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: New construction permit | Permit status: Completed | Completion date: July 1, 2015 | Permit id: 567538 | |||||
SCORE 59 Install 2 pump skids to connect to existing process piping Date: December 5, 2016 Contractor: M. Davis And Sons Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 12, 2017 | Permit id: 730369 | |||||
SCORE 92 Install 3-#12 thhn wire and 3 4" conduit from the existing mcc25b section 7g to the existing product pump p-260b to add a redundant power feed as per 2008 nec (east district) Date: April 3, 2017 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Expired | Completion date: April 3, 2017 | Permit id: 762294 | |||||
SCORE 92 Install 2-i line panels powered from existing motor control centers panel for future use no load branches installed as per nec 2008(east district) Date: April 8, 2015 Contractor: M Davis And Sons Inc Client: Honeywell Resin & Chemica | Client Company: Honeywell International | Permit type: Electrical permit | Permit status: Completed | Completion date: August 20, 2016 | Permit id: 599928 |