SCORE 89 Remodel existing 2nd floor space including kitchen, new interior openings, two new windows, enclose exiting 2nd fl porch to new space. Add laundry to 3rd floor. Add 1 hour fire rated entry door to interior landing at front stairs between 1st & second floor. Permit type: Addition/alteration | Completion date: September 17, 2014 | Current use: Two-family | Parcel: 25538 | |||||
SCORE 100 Excavation Date: May 19, 2015 Contractor: Cambridge Water Department Permit id: Exc20304 | |||||
SCORE 82 A 4. 76 kw-dc photovoltaic power system is going to be installed on the roof. Permit type: Addition/alteration | Completion date: April 26, 2017 | Current use: One-family | Permit id: 0 | Parcel: 25538 |