Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Rosas used mh lot 69 Date: March 26, 2012 Permit status: Closed | Permit id: 12-01222 | |||||
SCORE 99 Rosas used mh lot 69 Client: Rosas Used Mh Lot 69 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-01222 | Parcel: 10405 | |||||
SCORE 100 Rosas used mh lot 69 Client: Rosas Used Mh Lot 69 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-01222 | Parcel: 10405 | |||||
March 7, 2012 2:53:12 pm kneel. Rosas - used mh lot 69 location: off n louisiana ave; march 26, 2012 8:09:34 am heatherr. Rosas - used mh lot 69; har; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting until final inspection has be Permit type: Permits - historical | Permit status: Closed | Permit id: 12-01222 | Parcel: 10405 | |||||
Rosas used mh lot 69 Date: March 26, 2012 Value: $8,000 Permit type: Historical | Permit status: Closed | Permit id: 12-01222 | |||||
March 7, 2012 2:53:12 pm kneel. Rosas - used mh lot 69 location: off n louisiana ave; march 26, 2012 8:09:34 am heatherr. Rosas - used mh lot 69; har; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting until final inspection has be Date: March 26, 2012 Permit type: Permits - historical | Permit status: Closed | Permit id: 12-01222 | Parcel: 10405 |