Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
![]() Permit status: Closed | Permit id: 01-03018 | |||||
![]() Permit status: Closed | Permit id: 00-01742 | |||||
Single family home - creekside s/d. House plans same as #20:; added 2nd mech permit for taylor piping for gas piping of furnace, water heater, and fireplace, to sb via fax. Charged 4 5.; soils test will be needed to be submitted before building begins on this site to the engineering department for approval. Finished floor elevation certificates must be turned in to engineering department within 21 days of setting the finished floor level. All utilities must be flood proofed. -njb 04-13-2000; ok pd already.; received plans 04-11-2000. -njb; call maro slaughter at redacted phone number to schedule inspection. Building. See comments. Building review comments the approved plans with the review checklist and review comments are required to be on the jobsite for use by the field inspector(s). The building permit is required to be posted on the jobsite before an inspection can be made. The "energy compliance worksheet" attached to the approved plans Permit type: Res: new | Permit status: Closed | Permit id: 00-01742 | Parcel: 29312 | |||||
Single family home - creekside s/d. House plans same as #20:; added 2nd mech permit for taylor piping for gas piping of furnace, water heater, and fireplace, to sb via fax. Charged 4 5.; soils test will be needed to be submitted before building begins on this site to the engineering department for approval. Finished floor elevation certificates must be turned in to engineering department within 21 days of setting the finished floor level. All utilities must be flood proofed. -njb 04-13-2000; ok pd already.; received plans 04-11-2000. -njb; call maro slaughter at redacted phone number to schedule inspection. Building. See comments. Building review comments the approved plans with the review checklist and review comments are required to be on the jobsite for use by the field inspector(s). The building permit is required to be posted on the jobsite before an inspection can be made. The "energy compliance worksheet" attached to the approved plans ![]() Permit type: Res: new | Permit status: Closed | Permit id: 00-01742 | Parcel: 29312 | |||||
Residential ![]() ![]() Permit status: Closed | Permit id: 01-03018 | |||||
Residential ![]() ![]() Permit status: Closed | Permit id: 00-01742 | |||||
SCORE 99 Comment date: fri apr 07 00:00: edt 20 - single family home - creekside s/d. House plans same as #20:; comment date: mon jun 12 00:00: edt 20 - added 2nd mech permit for taylor piping for gas piping o Client: Creekside | Permit type: Res: new | Permit status: Closed | Current use: Residential | Permit id: 00-01742 | Parcel: 29312 | |||||
SCORE 99 Comment date: fri apr 07 00:00: edt 20 - single family home - creekside s/d. House plans same as #20:; comment date: mon jun 12 00:00: edt 20 - added 2nd mech permit for taylor piping for gas piping o Client: Creekside | Permit type: Res: new | Permit status: Closed | Current use: Residential | Permit id: 00-01742 | Parcel: 29312 | |||||
SCORE 98 Extension of existing deck.; 07/25/2001 04:59 pm nberry spoke with owner on 7/25/2001 around 10: am. Made mr. Hawkins aware of the cost of permit. He said he did not know if he was going to pusue or not. He would let me know soon. Njb 7/25/2001; front setbacks to be measured from the existing right of way line. Side and rear setbacks are to be measured from property lines. Setbacks also apply to porches, decks, etc.; 07/25/2001 03:39 pm nberry approved as submitted. Wet floodproofing to be used on the new foundation walls. Engineer letter submitted from rod hudgins engineering. No elevation required above bfe with this letter. Njb 7/25/01; building review comments the approved plans with the review checklist and review comments are required to be on the jobsite for use by the field inspector(s). The building permit is required to be posted on the jobsite before an inspection can be made. The "energy compliance worksheet" attached to the approved plans shall be completed, signed, Client: George Hawkins | Permit type: Res: addition | Permit status: Closed | Current use: Residential | Permit id: 01-03018 | Parcel: 29312 | |||||
SCORE 100 Comment date: fri apr 07 00:00: edt 20 - single family home - creekside s/d. House plans same as #20:; comment date: mon jun 12 00:00: edt 20 - added 2nd mech permit for taylor piping for gas piping o Client: Creekside | Permit type: Res: new | Permit status: Closed | Current use: Residential | Permit id: 00-01742 | Parcel: 29312 | |||||
SCORE 100 Comment date: fri apr 07 00:00: edt 20 - single family home - creekside s/d. House plans same as #20:; comment date: mon jun 12 00:00: edt 20 - added 2nd mech permit for taylor piping for gas piping o Client: Creekside | Permit type: Res: new | Permit status: Closed | Current use: Residential | Permit id: 00-01742 | Parcel: 29312 | |||||
SCORE 98 Comment date: fri apr 07 00:00: edt 20 - single family home - creekside s/d. House plans same as #20:; comment date: mon jun 12 00:00: edt 20 - added 2nd mech permit for taylor piping for gas piping o Client: Creekside | Permit type: Res: new | Permit status: Closed | Current use: Residential | Permit id: 00-01742 | Parcel: 29312 | |||||
Single family home - creekside s d. House plans same as #20:; added 2nd mech permit for taylor piping for gas piping of furnace, water heater, and fireplace, to sb via fax. Charged 4 5.; soils test will be needed to be submitted before building begins on this site to the engineering department for approval. Finished floor elevation certificates must be turned in to engineering department within 21 days of setting the finished floor level. All utilities must be flood proofed. -njb 04-13-2000; ok pd already.; received plans 04-11-2000. -njb; call maro slaughter at redacted phone number to schedule inspection. Building. See comments. Building review comments the approved plans with the review checklist and review comments are required to be on the jobsite for use by the field inspector(s). The building permit is required to be posted on the jobsite before an inspection can be made. The "energy compliance worksheet" attached to the approved plans ![]() Permit type: Res: new | Permit status: Closed | Permit id: 00-01742 | Parcel: 29312 |