Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Mh lot 30 Date: February 11, 2008 Permit status: Closed | Permit id: 08-00291 | |||||
Mh lot 30 Client: Mh Lot 30 | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 08-00291 | Parcel: 20136 | |||||
January 15, 2008 9:09:18 am kneel used mh to 26 aztec ln, lot 30. Location: off of n louisiana ext.; zoning permit and site plan approved for replacement of unit on lot # (14 x 80). Property located outside city of asheville corporate limits, yet inside city of asheville? S planning extra territorial jurisdiction (etj) inside a rm-8 multi-family medium density district with a manufactured housing overlay (mh-o) and manufactured housing community overlay (mhc-o). Setbacks measured from perimeter boundary. Swr january 16, 2008 10:08: am stuartr ; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist Permit type: Res: mfg. Home | Permit status: Closed | Permit id: 08-00291 | Parcel: 20136 | |||||
SCORE 100 Mh lot 30 Date: February 11, 2008 Contractor: A1 Services Client: Mh Lot 30 | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 08-00291 | Parcel: 20136 | |||||
January 15, 2008 9:09:18 am kneel used mh to 26 aztec ln, lot 30. Location: off of n louisiana ext.; zoning permit and site plan approved for replacement of unit on lot # (14 x 80). Property located outside city of asheville corporate limits, yet inside city of asheville? S planning extra territorial jurisdiction (etj) inside a rm-8 multi-family medium density district with a manufactured housing overlay (mh-o) and manufactured housing community overlay (mhc-o). Setbacks measured from perimeter boundary. Swr january 16, 2008 10:08: am stuartr ; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist Date: February 11, 2008 Permit type: Res: mfg. Home | Permit status: Closed | Permit id: 08-00291 | Parcel: 20136 |