Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 79 38 sf re-roof () for (e) sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt shingles proposed roofing material asphalt shingles manufacturer gaf brand and model timberline color (if cool roof required) stone grey crrc# 0676-0137 built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) no required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: May 23, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: March 14, 2017 Contractor: Solarcity Corporation Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Temporary power/tspb Date: February 3, 2005 Permit status: Pass | Permit id: Pds2005-1007-20 |