Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Install new wiring for a step-down transformer for existing lighting to externally illuminate an existing sign. Per nec 2011 Date: March 6, 2012 Contractor: Ryan Brothers Electric Permit type: Electrical permit | Permit status: Closed | Permit id: 12-150230 | Parcel: 0511002000 | |||||
SCORE 99 Signage for hope lodge, one 39 in x 51 in freestanding and one in x 36 in parallel wooden sign. Date: December 13, 2007 Contractor: Fletcher Allen Health Care Inc Permit type: Zoning permit - signs and awnings | Permit status: Final co issued | Permit id: 08-456sn | Parcel: 0511002000 | |||||
SCORE 100 Install water service Date: October 19, 2006 Contractor: Kr Adams Inc Permit type: Excavation permit | Permit status: Closed | Permit id: 06-112423 | Parcel: 0511002000 | |||||
Hope lodge: install new wiring for a new fire alarm system. Pending review and approval of fire marshal Date: October 6, 2006 Permit type: Fire alarm systems | Permit status: Closed | Permit id: 06-112194 | Parcel: 0511002000 | |||||
SCORE 71 Disconnect old sewer service and install new service Date: October 6, 2006 Contractor: R.J. Piche Excavating Permit type: Excavation permit | Permit status: Closed | Permit id: 06-112189 | Parcel: 0511002000 | |||||
SCORE 100 Supply and install two guardian three fire suppression systems to protect kitchen stove top areas in hope lodge Date: September 26, 2006 Contractor: Robert Gauthier Permit type: Suppression systems | Permit status: Closed | Permit id: 06-111931 | Parcel: 0511002000 | |||||
Hope lodge: install a wet pipe system for the 1st & 2nd floors and a dry pipe system for the attic area. Date: September 26, 2006 Permit type: Sprinkler systems | Permit status: Closed | Permit id: 06-111930 | Parcel: 0511002000 | |||||
SCORE 100 Install radiant slab heating being heated from central heat plant by weil mclain direct vent ultra boilers, heat recovery units for make-up air and exhaust and cool by individual fan coil units serving each room. Date: September 26, 2006 Contractor: Thomas Mechanical Inc Permit type: Mechanical permit | Permit status: Closed | Permit id: 06-111928 | Parcel: 0511002000 | |||||
SCORE 100 Hope lodge install new plumbing system to serve new lodge to enclude 16 bathrooms, one common bathroom and central laundry area. Date: September 26, 2006 Contractor: Thomas Mechanical Inc Permit type: Plumbing permit | Permit status: Closed | Permit id: 06-111927 | Parcel: 0511002000 | |||||
SCORE 99 Hope lodge: install new wiring for auto temp. Controls. Date: September 26, 2006 Contractor: Control Technologies Inc Permit type: Electrical control wiring | Permit status: Closed | Permit id: 06-111926 | Parcel: 0511002000 | |||||
SCORE 100 Hope lodge: install new wiring for a new two story structure. Including lights, receps. Switches, equipment feeds, service, sub panels. Smoke and co detection. Afci and gfci protection. All per nec 2005. Lighting subject to approval of burlington ele Date: September 26, 2006 Contractor: Ryan Brothers Electric Permit type: Electrical permit | Permit status: Closed | Permit id: 06-111925 | Parcel: 0511002000 | |||||
SCORE 100 Construct new structure as approved ==three story wood frame residential building called the hope lodge Date: September 26, 2006 Contractor: Kr Adams Inc Permit type: Building permit | Permit status: Closed | Permit id: 06-111924 | Parcel: 0511002000 | |||||
SCORE 97 Retire gas service Date: September 7, 2006 Contractor: Vermont Gas Systems Inc Permit type: Excavation permit | Permit status: Closed | Permit id: 06-111454 | Parcel: 0511002000 | |||||
SCORE 99 2006 rental billing property no longer rental - apr 13 2006 Date: March 3, 2006 Contractor: Fletcher Allen Health Care Permit type: Code enforcement billing folder | Permit status: Closed | Permit id: 06-103279 | Parcel: 0511002000 | |||||
SCORE 99 Merge two lots at 237 and 245 east avenue (hope lodge), and increase size of merged lot to 27,444 sf. Date: October 24, 2005 Contractor: Fletcher Allen Health Care Inc Permit type: Zoning permit - coa level i | Permit status: Final co issued | Permit id: 06-315ca | Parcel: 0511002000 | |||||
SCORE 98 Extension of previous permit for hope lodge. Date: August 29, 2005 Contractor: Medical Center Hospital Of Vermont Permit type: Zoning permit - coa level i | Permit status: Final co issued | Permit id: 06-169ca | Parcel: 0511002000 | |||||
SCORE 98 Amendment to 04-001cu to demolish the two existing buildings and construct a new residence for hope lodge of the american cancer society. Revised site plan with related cross section. Date: April 11, 2005 Contractor: Medical Center Hospital Of Vermont Permit type: Zoning permit - coa level ii | Permit status: Withdrawn | Permit id: 05-508ca | Parcel: 0511002000 | |||||
SCORE 99 2005 rental billing Date: February 17, 2005 Contractor: Fletcher Allen Health Care Permit type: Code enforcement billing folder | Permit status: Closed | Permit id: 05-103207 | Parcel: 0511002000 | |||||
SCORE 100 Install new wiring for newly installed ac/dc interconnected smoke detectors per city ordinance. Date: January 4, 2005 Contractor: Peck Electric Co Permit type: Electrical permit | Permit status: Closed | Permit id: 05-100043 | Parcel: 0511002000 | |||||
SCORE 98 Ep closed 2/26/05, found in compliance; 3 yr. Coc issued, signed and mailed 3/17/05. Date: April 26, 2004 Contractor: Medical Center Hospital Of Vermont Permit type: Routine inspections | Permit status: Closed | Permit id: 04-106563 | Parcel: 0511002000 | |||||
Code enforcement billing folder Date: February 17, 2004 Permit status: Closed | Permit id: 04-104393 | Parcel: 0511002000 | |||||
SCORE 98 Demolish two existing buildings and construct 16 room convalescent house named hope lodge. Conditional use approval. Date: October 17, 2003 Contractor: Medical Center Hospital Of Vermont Permit type: Zoning permit - coa level ii | Permit status: Final co issued | Permit id: 04-272 | Parcel: 0511002000 | |||||
SCORE 59 Interior remodeling Date: March 27, 1992 Contractor: Gary Bolio Permit type: Building permit | Permit status: Closed | Permit id: 17059 | Parcel: 0511002000 | |||||
Downstairs bath: install new moen t & s valve and waste overflow. Upstairs bath: install new aker 3-piece shower. All ???? And ????. Date: April 13, 1992 Permit type: Plumbing permit | Permit status: Closed | Permit id: 16956 | Parcel: 0511002000 | |||||
SCORE 100 Cfi outlet kitchen bath 1st floor bath 2nd floor Date: April 23, 1992 Contractor: Al King Electric Permit type: Electrical permit | Permit status: Closed | Permit id: 17187 | Parcel: 0511002000 | |||||
SCORE 59 Historic permit Client: Fletcher Allen Health Care, Inc. | Permit type: Building permit | Permit status: Closed | Current use: Historic permit | Permit id: 92-022200 | |||||
Historic permit Date: April 13, 1992 Value: $950 Client: Fletcher Allen Health Care, Inc. | Permit type: Plumbing permit | Permit status: Closed | Current use: Historic permit | Permit id: 92-012099 | |||||
SCORE 100 Ac dc interconnected smoke detectors Client: Medical Center Hospital Of Vermont | Permit type: Electrical permit | Permit status: Closed | Current use: (r) single family | Permit id: 05-100043 | |||||
SCORE 100 General wiring Client: Fletcher Allen Health Care, Inc. | Permit type: Electrical permit | Permit status: Closed | Current use: (r) multi-family | Permit id: 12-150230 | |||||
SCORE 100 Automatic Client: Fletcher Allen Health Care, Inc. | Permit type: Alarm permit | Permit status: Closed | Current use: (c) commercial | Permit id: 06-112194 | |||||
SCORE 100 Suppression system(s) Client: Fletcher Allen Health Care, Inc. | Permit type: Suppression permit | Permit status: Closed | Current use: (c) boarding house | Permit id: 06-111931 | |||||
SCORE 88 Sprinkler system(s) Client: Fletcher Allen Health Care, Inc. | Permit type: Sprinkler permit | Permit status: Closed | Current use: (c) boarding house | Permit id: 06-111930 | |||||
SCORE 100 Hvac Client: Fletcher Allen Health Care, Inc. | Permit type: Mechanical permit | Permit status: Closed | Current use: (c) boarding house | Permit id: 06-111928 | |||||
SCORE 100 General plumbing Client: Fletcher Allen Health Care, Inc. | Permit type: Plumbing permit | Permit status: Closed | Current use: (c) boarding house | Permit id: 06-111927 | |||||
SCORE 99 Hvac Client: Fletcher Allen Health Care, Inc. | Permit type: Electrical control wiring permit | Permit status: Closed | Current use: (c) boarding house | Permit id: 06-111926 | |||||
SCORE 100 New building Client: Fletcher Allen Health Care, Inc. | Permit type: Electrical permit | Permit status: Closed | Current use: (c) boarding house | Permit id: 06-111925 | |||||
SCORE 100 New construction Client: Fletcher Allen Health Care, Inc. | Permit type: Building permit | Permit status: Closed | Current use: (c) boarding house | Permit id: 06-111924 | |||||
SCORE 100 Historic permit Client: Fletcher Allen Health Care, Inc. | Permit type: Electrical permit | Permit status: Closed | Current use: Historic permit | Permit id: 92-003160 |