Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Installation of upho Date: August 11, 2014 Permit status: Na | Permit id: Chm392683 | |||||
Installation of upho Date: January 16, 2015 Permit status: Na | Permit id: Chm440379 | |||||
Installation of upho Date: September 5, 2013 Permit status: Na | Permit id: Chm282816 | |||||
To remove asbestos from thr 3rd- 5th floors Date: June 22, 2010 Permit status: Na | Permit id: Asb30860 | |||||
Boston university Date: May 15, 2014 Permit status: Na | Permit id: Asb362770 | |||||
To remove asbestos from 236 baystate road Date: July 18, 2011 Permit status: Na | Permit id: Asb86388 | |||||
Removal of asbestos Date: March 7, 2013 Permit status: Na | Permit id: Asb225330 | |||||
To remove asbestos from 236 bay state road Date: March 1, 2011 Permit status: Na | Permit id: Asb65838 | |||||
Installation of upho Date: December 31, 2014 Permit status: Na | Permit id: Chm437762 | |||||
Installation of upho Date: August 20, 2012 Permit status: Na | Permit id: Chm174817 | |||||
Install temporary cwsi wireless fire alarm system; ~; doc# 20140651 Date: June 30, 2014 Permit status: Na | Permit id: Bfdf365875 | |||||
Date: December 9, 2013 Permit status: Na | Permit id: Asb311228 | |||||
To remove asbestos from the 4th floor bathroom Date: June 22, 2010 Permit status: Na | Permit id: Asb30899 | |||||
Welding a section of heat piping in rear of bldg Date: July 16, 2015 Permit status: Na | Permit id: Cbw493028 | |||||
Installation of floo Date: March 11, 2015 Permit status: Na | Permit id: Chm450448 | |||||
SCORE 100 Install temporary fire alarm system for coverage during renovation of building and new fire alarm system is installed Permit type: Electrical | Current use: Mixed | Permit id: Efa363335 | |||||
SCORE 100 Install raceway low voltage data wiring Permit type: Low voltage | Current use: Comm | Permit id: Elv110923 | |||||
SCORE 80 8 bathroom remodels Permit type: Plumbing | Current use: Comm | Permit id: Pl32038 | |||||
SCORE 98 1 2 barhroom remodel. Total 10. Supply and install new framing. Supply and install durock and blueboard. Supply and install venting. Supply and install tile flooring. Prime and paint with three coats. Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf36246 | |||||
SCORE 100 Interior finishes: new flooring painting doors and ceilings. New light fixtures remove and re-frame first floor entrance way. No exterior work. Permit type: Fast track application | Current use: Comm | Permit id: Alt359926 | |||||
SCORE 100 Install new lighting branch circuits and light fixtures Permit type: Electrical | Current use: Other | Permit id: E386169 | |||||
SCORE 97 Eight bath room floors 1/3/4/5/ two bath on each floor Permit type: Electrical | Permit status: Expired | Current use: Other | Permit id: E32560 | |||||
SCORE 100 Install raceway low voltage data wiring Permit type: Electrical low voltage | Expiration date: January 2, 2014 | Current use: Comm | Permit id: Elv110923 | |||||
Bfd chemist certificate proces Date: August 11, 2014 Permit id: Chm392683 | |||||
Bfd chemist certificate proces Date: January 16, 2015 Permit id: Chm440379 | |||||
Bfd chemist certificate proces Date: September 5, 2013 Permit id: Chm282816 | |||||
SCORE 100 Interior finishes: new flooring painting doors and ceilings. New light fixtures remove and re-frame first floor entrance way. No exterior work. Permit type: Long form/alteration permit | Expiration date: November 15, 2014 | Current use: Comm | Permit id: Alt359926 | |||||
Bfd chemist certificate proces Date: December 3, 2015 Permit id: Chm544309 | |||||
To remove asbestos from thr 3rd- 5th floors Date: June 22, 2010 Permit type: Bfd asbestos removal | Permit id: Asb30860 | |||||
Boston university Date: May 15, 2014 Permit type: Bfd asbestos removal | Permit id: Asb362770 | |||||
SCORE 100 Install temporary fire alarm system for coverage during renovation of building and new fire alarm system is installed Permit type: Electrical fire alarms | Expiration date: November 16, 2014 | Current use: Mixed | Permit id: Efa363335 | |||||
To remove asbestos from 236 baystate road Date: July 18, 2011 Permit type: Bfd asbestos removal | Permit id: Asb86388 | |||||
Removal of asbestos Date: March 7, 2013 Permit type: Bfd asbestos removal | Permit id: Asb225330 | |||||
SCORE 80 8 bathroom remodels Permit type: Plumbing permit | Expiration date: December 30, 2010 | Current use: Comm | Permit id: Pl32038 | |||||
To remove asbestos from 236 bay state road Date: March 1, 2011 Permit type: Bfd asbestos removal | Permit id: Asb65838 | |||||
Bfd chemist certificate proces Date: December 31, 2014 Permit id: Chm437762 | |||||
Bfd chemist certificate proces Date: August 20, 2012 Permit id: Chm174817 | |||||
Install temporary cwsi wireless fire alarm system; ~; doc# 20140651 Date: June 30, 2014 Permit type: Bfd fire alarm installations | Permit id: Bfdf365875 | |||||
Bfd asbestos removal Date: December 9, 2013 Permit id: Asb311228 | |||||
To remove asbestos from the 4th floor bathroom Date: June 22, 2010 Permit type: Bfd asbestos removal | Permit id: Asb30899 | |||||
Welding a section of heat piping in rear of bldg Date: July 16, 2015 Permit type: Bfd cutting-burning-welding | Permit id: Cbw493028 | |||||
SCORE 100 Install new lighting branch circuits and light fixtures Permit type: Electrical permit | Expiration date: January 21, 2015 | Current use: Other | Permit id: E386169 | |||||
Bfd chemist certificate proces Date: August 19, 2016 Permit id: Chm627853 | |||||
SCORE 98 1/2 barhroom remodel. Total 10. Supply and install new framing. Supply and install durock and blueboard. Supply and install venting. Supply and install tile flooring. Prime and paint with three coats. Permit type: Short form bldg permit | Expiration date: February 3, 2011 | Current use: Comm | Permit id: Sf36246 | |||||
SCORE 97 Eight bath room floors 1/3/4/5/ two bath on each floor Permit type: Electrical permit | Expiration date: January 9, 2011 | Current use: Other | Permit id: E32560 |