Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Comment date: thu sep 09 00:00: edt 1999 - addition; comment date: tue nov 00:00: est 1999 - added a mech permit for gas line inside house.; comment date: fri sep 00:00: edt 1999 - front setbacks to b Client: Macfie Addition | Permit type: Res: addition | Permit status: Closed | Current use: Residential | Permit id: 99-04435 | Parcel: 29129 | |||||
Mcfie, wade Date: August 25, 2009 Permit type: Gas piping | Permit status: Closed | Permit id: 09-04280 | |||||
Date: January 4, 2000 Permit status: Closed | Permit id: 99-04435 | |||||
Addition; added a mech permit for gas line inside house.; front setbacks to be measured from the existing right of way line. Side and rear setbacks are to be measured from property lines. Setbacks also apply to porches, decks, etc.; call maro slaughter at redacted phone number to schedule inspection. Building. Please read comments before proceeding with the construction. Building review comments the approved plans with the review checklist and review comments are required to be on the jobsite for use by the field inspector(s). The building permit is required to be posted on the jobsite before an inspection can be made. The "energy compliance worksheet" attached to the approved plans shall be completed, signed, and returned to the building inspector before the insulation inspection can be approved.; zn: front setbacks to be measured from the existing right of way line. Side and rear setbacks are to be measured from property lines. S Permit type: Res: addition | Permit status: Closed | Permit id: 99-04435 | Parcel: 29129 | |||||
Residential Date: January 4, 2000 Value: $43,700 Permit status: Closed | Permit id: 99-04435 | |||||
SCORE 99 Comment date: thu sep 09 00:00: edt 1999 - addition; comment date: tue nov 00:00: est 1999 - added a mech permit for gas line inside house.; comment date: fri sep 00:00: edt 1999 - front setbacks to b Client: Macfie Addition | Permit type: Res: addition | Permit status: Closed | Current use: Residential | Permit id: 99-04435 | Parcel: 29129 | |||||
SCORE 100 Comment date: thu sep 09 00:00: edt 1999 - addition; comment date: tue nov 00:00: est 1999 - added a mech permit for gas line inside house.; comment date: fri sep 00:00: edt 1999 - front setbacks to b Client: Macfie Addition | Permit type: Res: addition | Permit status: Closed | Current use: Residential | Permit id: 99-04435 | Parcel: 29129 | |||||
SCORE 95 Comment date: thu sep 09 00:00: edt 1999 - addition; comment date: tue nov 00:00: est 1999 - added a mech permit for gas line inside house.; comment date: fri sep 00:00: edt 1999 - front setbacks to b Client: Macfie Addition | Permit type: Res: addition | Permit status: Closed | Current use: Residential | Permit id: 99-04435 | Parcel: 29129 | |||||
SCORE 100 August 14, 2009 9:50:55 am heatherr. Remove existing pulse gas furnace and replace with new dave lennox signature series gas furnace via fax. Call redacted phone number for inspection. Date: October 5, 2009 Contractor: J.B.S Heating And Cooling Client: Macfie, Wade | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-04107 | Parcel: 864348 | |||||
SCORE 100 August 25, 2009 10:40:52 am heatherr. Replace propane power vent water heater with natural gas water heater, pipe from meter location to furnace, pipe to water heater also and remove propane connections from manifold (re: 9-4107 me permit) via fax. Call redacted phone number for inspection. Date: August 25, 2009 Contractor: Public Service Co Of Nc Client: Mcfie, Wade | Permit type: Com: gas piping | Permit status: Closed | Current use: Commercial | Permit id: 09-04280 | Parcel: 29129 | |||||
Addition; added a mech permit for gas line inside house.; front setbacks to be measured from the existing right of way line. Side and rear setbacks are to be measured from property lines. Setbacks also apply to porches, decks, etc.; call maro slaughter at redacted phone number to schedule inspection. Building. Please read comments before proceeding with the construction. Building review comments the approved plans with the review checklist and review comments are required to be on the jobsite for use by the field inspector(s). The building permit is required to be posted on the jobsite before an inspection can be made. The "energy compliance worksheet" attached to the approved plans shall be completed, signed, and returned to the building inspector before the insulation inspection can be approved.; zn: front setbacks to be measured from the existing right of way line. Side and rear setbacks are to be measured from property lines. S Date: January 4, 2000 Permit type: Res: addition | Permit status: Closed | Permit id: 99-04435 | Parcel: 29129 |