Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 91 Tear-off & reroof of sfd, 15 squares of roof pitch reported as 1 4inch per foot. New roof assemlby to include 3 1 2inch rigid foam insulation with eps tapered (total r24), densdeck, and mil epdm. Date: January 27, 2014 Contractor: Jam Roofing Inc Client: C Walker | Applicant: Jam Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: April 6, 2015 | Current use: Single family d | |||||
SCORE 91 Tear-off & reroof of sfd, 15 squares of roof pitch reported as 1 4inch per foot. New roof assemlby to include 3 1 2inch rigid foam insulation with eps tapered (total r24), densdeck, and mil epdm. Client: C Walker | Permit type: Roofing | Permit status: Cmp | Completion date: April 6, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-00397 | |||||
SCORE 91 2305 and 2307 spruce - total tear-off & reroof of the lower southern portion of a multi-family building, squares of mm rpi on a pitch represented as 1 4inch 12. 3inch tso eps, r-value 30. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: C Walker | Permit type: Roofing | Permit status: Cmp | Completion date: April 14, 2017 | Current use: Multifamily dwellings, existing | Permit id: Pmt2017-01116 | |||||
SCORE 80 Installation of a replacement 125k btu, 85% efficient forced air furnace. Installation per manufacturerfoots specifications. Client: C Walker | Permit type: Mechanical | Permit status: Cmp | Completion date: October 20, 2017 | Current use: Single family attached dwelling, existin | Permit id: Pmt2017-04555 |