Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: April 22, 2015 Client: Weismer Rochelle Zhang Song | Permit status: Completed | Permit id: 604863 | |||||
Addition permit Date: November 5, 2015 Client: Weismer Rochelle Zhang Song | Permit status: Completed | Permit id: 616780 | |||||
Mechanical permit Date: February 25, 2016 Client: Weismer Rochelle Zhang Song | Permit status: Completed | Permit id: 671774 | |||||
Plumbing permit Date: February 16, 2016 Client: Weismer Rochelle Zhang Song | Permit status: Completed | Permit id: 669984 | |||||
Alteration permit Date: March 24, 2015 Client: Weismer Rochelle Zhang Song | Permit status: Completed | Permit id: 598036 | |||||
Electrical permit Date: January 28, 2016 Client: Weismer Rochelle Zhang Song | Permit status: Completed | Permit id: 666285 | |||||
Zoning permit Date: November 5, 2015 Client: Weismer Rochelle Zhang Song | Permit status: Completed | Permit id: 616779 | |||||
Electrical permit Date: January 28, 2016 Client: Savaltore Christopher A Salvatore Maria M | Permit status: Completed | Permit id: 666285 | |||||
Alteration permit Date: March 24, 2015 Client: Savaltore Christopher A Salvatore Maria M | Permit status: Completed | Permit id: 598036 | |||||
Zoning permit Date: November 5, 2015 Client: Savaltore Christopher A Salvatore Maria M | Permit status: Completed | Permit id: 616779 | |||||
Plumbing permit Date: April 22, 2015 Client: Savaltore Christopher A Salvatore Maria M | Permit status: Completed | Permit id: 604863 | |||||
Addition permit Date: November 5, 2015 Client: Savaltore Christopher A Salvatore Maria M | Permit status: Completed | Permit id: 616780 | |||||
Mechanical permit Date: February 25, 2016 Client: Savaltore Christopher A Salvatore Maria M | Permit status: Completed | Permit id: 671774 | |||||
Plumbing permit Date: February 16, 2016 Client: Savaltore Christopher A Salvatore Maria M | Permit status: Completed | Permit id: 669984 | |||||
SCORE 100 Interior alterations to include drywall throughout, moisture resistant drywall in the bathroom and kitchen, new windows and doors in existing opening. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Separate permits required for plumbing, electrical and mechanical work Date: March 24, 2015 Contractor: Bens Mechanical Llc Client: Savaltore Christopher A Salvatore Maria M | Permit type: Alteration permit | Permit status: Completed | Completion date: May 2, 2016 | Permit id: 598036 | |||||
SCORE 100 Install payne 95% 80,0 btu furnace and 2 1 2 ton a c with duct work for 2nd and 3rd fl ,to install payne 95% 45,0 btu furnace and 1 1 2 ton a c with duct work for 1st fl and basement Date: February 25, 2016 Contractor: Bens Mechanical Llc Client: Savaltore Christopher A Salvatore Maria M | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 2, 2016 | Permit id: 671774 | |||||
SCORE 100 Install interior work - 2 water closets, 2 lavy sinks, 2 tubs, 1 kitchen sink & 1 washing boxes the installation will compy with the philadephia plubming code 2004 Date: February 16, 2016 Contractor: Shegda Construction Corp Client: Savaltore Christopher A Salvatore Maria M | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 30, 2016 | Permit id: 669984 | |||||
SCORE 89 Total rewire with recepts,lights,fixtures,switches,smokes,co detectors & new 2 amp service with all necessary bonding & grounding as per 2008 nec (west district) Date: January 28, 2016 Contractor: D And R Company Electric Llc Client: Savaltore Christopher A Salvatore Maria M | Permit type: Electrical permit | Permit status: Completed | Completion date: May 25, 2016 | Permit id: 666285 | |||||
SCORE 93 5" curb trap and 4" vent pa20150891814(sfd)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: April 22, 2015 Contractor: Lepore Plumbing Inc Client: Savaltore Christopher A Salvatore Maria M | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 13, 2015 | Permit id: 604863 | |||||
SCORE 100 For part. Demo. To remove two (2) story rear portion & for the erection of three (3) story above grade plane, w. Unoccupied basement sog & rooftop structure, addition of light-frame wood construction w. Masonry concrete foundation system & low-slope roof assembly & interior alterations throughout existing dwelling unit; bldng. Is not fully sprinklered. Separate permit required for mchncl, elctrcl & plmbng work. Site to be excavated at areas adjacent to existing structure(s) not within the scope of this permit. Permit holder to notify owner(s) of adjoining property(ies) no less than ten (10) days prior to commencement of permitted work. Date: November 5, 2015 Contractor: Bens Mechanical Llc Client: Savaltore Christopher A Salvatore Maria M | Permit type: Addition permit | Permit status: Completed | Completion date: August 25, 2016 | Permit id: 616780 | |||||
SCORE 100 For partial demo. Of site to remove exist rear portion & for the erection of a rear addition & accessory use roof deck & roof deck access structure at existing attached building; size & location as shown in approved. Date: November 5, 2015 Contractor: Bens Mechanical Llc Client: Savaltore Christopher A Salvatore Maria M | Permit type: Zoning permit | Permit status: Completed | Completion date: November 5, 2015 | Permit id: 616779 |