Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing and gas Date: December 20, 2012 Client: Howard University | Applicant: John Mcdonald | Permit status: Permit issued | Permit id: P1301790 | |||||
Convert retail space into ice cream parlor. New tenant layout for new self-serve frozen yogurt store. Date: November 8, 2012 Client: Howard University | Applicant: Howard University; Chris Wing | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1210986 | |||||
Mobilized a portable drill rig to advance soil borings for collection of subsurface soil, soil gas, and groundwater samples for subsurface investigation. Install four soil borings between two to eight inches diameter by feet deep. As per site plans, work plans report, dc well construction form and dc well schematic form. Date: June 25, 2012 Client: Howard University | Applicant: Howard University; Luis Garcia-Rapid Permit Service, Inc. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200298 | |||||
Dms sign connection: install 1 new blade sign 24 inches x 18 inches equals 3 sq ft install 1 new wall sign 146. 25 inches x inches equals 40. 59 sq ft install 1 new wall sign 17 inches x 8 inches equals 7. 61 sq ft Date: November 29, 2012 Client: Howard University Risk Office Director | Applicant: Dms Sign Connection; Dms Sign Connection | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1300076 | |||||
Plumbing and gas Date: November 1, 2013 Client: Howard University | Applicant: Paul M. Vito | Permit status: Completed | Permit id: P1400889 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfdnth8dmdmgiq3xdxgiyi5 Date: February 13, 2013 Client: Samuel Mayo | Applicant: Samuel Mayo; Samuel Mayo; Samuel Mayo | Permit type: Electrical | Permit status: Completed | Permit id: E42058232 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildg23xe2xmsmdthe1afcg5v Date: February 25, 2013 Client: Chris Wing | Applicant: Samuel Mayo; Chris Wing; Samuel Mayo | Permit type: Electrical | Permit status: Completed | Permit id: E35068325 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeile6exubghy0hiqdmc2ronwp Date: February 13, 2013 Client: Howard University | Applicant: Samuel Mayo; Howard University; Samuel Mayo | Permit type: Electrical | Permit status: Completed | Permit id: E53557996 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilefujcmseec0zrgppmznmbf Date: February 25, 2013 Client: Chris Wing | Applicant: Samuel Mayo; Chris Wing; Samuel Mayo | Permit type: Electrical | Permit status: Completed | Permit id: E55914707 | |||||
Interior renovation of exisitng shell space for alteration to mechanical plumbing electrical systems Date: August 27, 2012 Client: Howard University | Applicant: Howard University; Fvi2020 | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1213082 | |||||
Plumbing and gas Date: December 4, 2012 Client: Howard University | Applicant: Paul M. Vito | Permit status: Completed | Permit id: P1301441 | |||||
Mechanical Date: January 15, 2013 Client: Howard University | Applicant: Ricardo Guilette | Permit status: Completed | Permit id: M1300723 | |||||
Interior renovation of shell space for minor alteration and repair to mechanical plumbing and electrical systems no structural work involved in this permit Date: August 27, 2012 Client: Howard University | Applicant: Howard University; Fvi2020 | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1213084 | |||||
Interior alteration to existing suite on part of 1st flr. For 84 occupancy load restaurant with an accessory kitchen, new bathrooms and general seating area. Date: October 30, 2013 Client: Lincoln Clark | Applicant: George Delgado | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1310195 | |||||
Mechanical Date: October 31, 2013 Client: Howard University | Applicant: Michael F. Didion | Permit status: Completed | Permit id: M1400328 | |||||
SCORE 100 Plumbing and gas Date: December 20, 2012 Contractor: John Mcdonald Client: Howard University | Permit status: Permit issued | Permit id: P1301790 | |||||
SCORE 56 Mobilized a portable drill rig to advance soil borings for collection of subsurface soil, soil gas, and groundwater samples for subsurface investigation. Install four soil borings between two to eight inches diameter by feet deep. As per site plans, work plans report, dc well construction form and dc well schematic form. Date: June 25, 2012 Client: Howard University | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200298 | |||||
SCORE 92 Electrical Date: November 8, 2013 Contractor: Sanford L. Malakoff Client: Howard University | Permit status: Completed | Permit id: E1401163 | |||||
SCORE 96 Mechanical Date: January 30, 2013 Contractor: Richard J Wirz Client: Howard University | Permit status: Permit issued | Permit id: M1300837 | |||||
Plumbing and gas Date: November 4, 2013 Client: Howard University | Permit status: Permit issued | Permit id: P1400934 | |||||
SCORE 88 Plumbing and gas Date: November 1, 2013 Contractor: Paul M. Vito Client: Howard University | Permit status: Completed | Permit id: P1400889 | |||||
SCORE 92 Electrical Date: April 1, 2015 Contractor: Bruce K Applegate Client: Howard University | Permit status: Completed | Permit id: E1504557 | |||||
SCORE 96 Electrical Date: July 15, 2015 Contractor: Carl J. Smith Client: Howard University | Permit status: Permit issued | Permit id: E1507530 | |||||
Plumbing and gas Date: May 21, 2015 Client: Howard University | Permit status: Permit issued | Permit id: P1505994 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildbq%2f3svgqxsclsho6no7qt Date: July 10, 2015 Contractor: Dan Fluke Joe Spinelli Thomas Dvorak Client: Joe Spinelli | Permit type: Electrical | Permit status: Permit issued | Permit id: E35931909 | |||||
SCORE 59 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildg23xe2xmsmdthe1afcg5v Date: February 25, 2013 Contractor: Samuel Mayo Chris Wing Samuel Mayo Client: Chris Wing | Permit type: Electrical | Permit status: Completed | Permit id: E35068325 | |||||
SCORE 62 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfdnth8dmdmgiq3xdxgiyi5 Date: February 13, 2013 Contractor: Samuel Mayo Samuel Mayo Samuel Mayo Client: Samuel Mayo | Permit type: Electrical | Permit status: Completed | Permit id: E42058232 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeile6exubghy0hiqdmc2ronwp Date: February 13, 2013 Contractor: Samuel Mayo Howard University Samuel Mayo Client: Howard University | Permit type: Electrical | Permit status: Completed | Permit id: E53557996 | |||||
SCORE 59 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilefujcmseec0zrgppmznmbf Date: February 25, 2013 Contractor: Samuel Mayo Chris Wing Samuel Mayo Client: Chris Wing | Permit type: Electrical | Permit status: Completed | Permit id: E55914707 | |||||
SCORE 100 Plumbing and gas Date: December 20, 2012 Contractor: John Mcdonald Client: Howard University | Permit status: Permit issued | Permit id: P1301790 | |||||
SCORE 92 Electrical Date: November 8, 2013 Contractor: Sanford L. Malakoff Client: Howard University | Permit status: Completed | Permit id: E1401163 | |||||
SCORE 56 Mobilized a portable drill rig to advance soil borings for collection of subsurface soil, soil gas, and groundwater samples for subsurface investigation. Install four soil borings between two to eight inches diameter by feet deep. As per site plans, work plans report, dc well construction form and dc well schematic form. Date: June 25, 2012 Client: Howard University | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200298 | |||||
SCORE 96 Mechanical Date: January 30, 2013 Contractor: Richard J Wirz Client: Howard University | Permit status: Permit issued | Permit id: M1300837 | |||||
Plumbing and gas Date: November 4, 2013 Client: Howard University | Permit status: Permit issued | Permit id: P1400934 | |||||
SCORE 88 Plumbing and gas Date: November 1, 2013 Contractor: Paul M. Vito Client: Howard University | Permit status: Completed | Permit id: P1400889 | |||||
SCORE 56 Dms sign connection: install 1 new blade sign 24 inches x 18 inches equals 3 sq ft install 1 new wall sign 146. 25 inches x inches equals 40. 59 sq ft install 1 new wall sign 17 inches x 8 inches equals 7. 61 sq ft Date: November 29, 2012 Contractor: Dms Sign Connection Dms Sign Connection Client: Howard University Risk Office Director | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1300076 | |||||
SCORE 56 Interior renovation to 1st and mezzanine level office space and classrooms. Partitions, furniture, mep and life safety. 8535 square feet. Hub at howard university Date: October 12, 2016 Contractor: Howard University; Sam Hollen Ramco Of Dc Inc Client: Howard University | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1609782 | |||||
SCORE 96 Mechanical Date: November 16, 2016 Contractor: Vincent J. Browning Client: Howard University (land Only) | Permit status: Permit issued | Permit id: M1700447 | |||||
SCORE 96 Plumbing and gas Date: November 15, 2016 Contractor: Joel Mateer Client: Howard University (land Only) | Permit status: Completed | Permit id: P1701264 | |||||
Plumbing and gas Date: December 13, 2016 Client: Howard University (land Only) | Permit status: Permit issued | Permit id: P1702049 | |||||
SCORE 56 Dms sign connection: install 1 new blade sign 24 inches x 18 inches equals 3 sq ft install 1 new wall sign 146. 25 inches x inches equals 40. 59 sq ft install 1 new wall sign 17 inches x 8 inches equals 7. 61 sq ft Date: November 29, 2012 Contractor: Dms Sign Connection; Dms Sign Connection Client: Howard University Risk Office Director | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1300076 | |||||
SCORE 56 Mobilized a portable drill rig to advance soil borings for collection of subsurface soil, soil gas, and groundwater samples for subsurface investigation. Install four soil borings between two to eight inches diameter by feet deep. As per site plans, work plans report, dc well construction form and dc well schematic form. Date: June 25, 2012 Client: Howard University | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200298 | |||||
SCORE 100 Plumbing and gas Date: December 20, 2012 Contractor: John Mcdonald Client: Howard University | Permit status: Permit issued | Permit id: P1301790 | |||||
SCORE 92 Electrical Date: November 8, 2013 Contractor: Sanford L. Malakoff Client: Howard University | Permit status: Completed | Permit id: E1401163 | |||||
Plumbing and gas Date: November 4, 2013 Client: Howard University | Permit status: Permit issued | Permit id: P1400934 | |||||
SCORE 88 Plumbing and gas Date: November 1, 2013 Contractor: Paul M. Vito Client: Howard University | Permit status: Completed | Permit id: P1400889 | |||||
SCORE 96 Mechanical Date: January 30, 2013 Contractor: Richard J Wirz Client: Howard University | Permit status: Permit issued | Permit id: M1300837 | |||||
SCORE 89 New rear ada ramp at rear of property & new guardrail at storefront. Level concrete at storefront to match existing. Date: May 19, 2015 Contractor: Smk And Associates Client: Howard University | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1507842 | |||||
SCORE 96 Electrical Date: July 15, 2015 Contractor: Carl J. Smith Client: Howard University | Permit status: Permit issued | Permit id: E1507530 | |||||
SCORE 92 Electrical Date: April 1, 2015 Contractor: Bruce K Applegate Client: Howard University | Permit status: Completed | Permit id: E1504557 | |||||
Plumbing and gas Date: May 21, 2015 Client: Howard University | Permit status: Permit issued | Permit id: P1505994 | |||||
SCORE 56 Interior renovation to 1st and mezzanine level office space and classrooms. Partitions, furniture, mep and life safety. 8535 square feet. Hub at howard university Date: October 12, 2016 Contractor: Howard University; Sam Hollen Ramco Of Dc, Inc Client: Howard University | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1609782 | |||||
SCORE 96 Plumbing and gas Date: November 16, 2016 Contractor: Vincent J. Browning Client: Howard University (land Only) | Permit status: Completed | Permit id: P1701306 | |||||
SCORE 96 Plumbing and gas Date: November 15, 2016 Contractor: Joel Mateer Client: Howard University (land Only) | Permit status: Completed | Permit id: P1701264 | |||||
Plumbing and gas Date: December 13, 2016 Client: Howard University (land Only) | Permit status: Completed | Permit id: P1702049 | |||||
SCORE 96 Mechanical Date: November 16, 2016 Contractor: Vincent J. Browning Client: Howard University (land Only) | Permit status: Completed | Permit id: M1700447 | |||||
Install 2 signs on front of bldg, frontage. 1 - 2 - 10" x 14 - 1" 1 - 2 - 2 3 4"x 2-6" Date: April 13, 2017 Client: Howard University (land Only) | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1700257 | |||||
SCORE 77 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfdnth8dmdmgiq3xdxgiyi5 Date: February 13, 2013 Contractor: Samuel Mayo; Samuel Mayo; Samuel Mayo Client: Samuel Mayo | Permit type: Electrical | Permit status: Completed | Permit id: E42058232 | |||||
SCORE 59 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildg23xe2xmsmdthe1afcg5v Date: February 25, 2013 Contractor: Samuel Mayo; Chris Wing; Samuel Mayo Client: Chris Wing | Permit type: Electrical | Permit status: Completed | Permit id: E35068325 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeile6exubghy0hiqdmc2ronwp Date: February 13, 2013 Contractor: Samuel Mayo; Howard University; Samuel Mayo Client: Howard University | Permit type: Electrical | Permit status: Completed | Permit id: E53557996 | |||||
SCORE 59 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilefujcmseec0zrgppmznmbf Date: February 25, 2013 Contractor: Samuel Mayo; Chris Wing; Samuel Mayo Client: Chris Wing | Permit type: Electrical | Permit status: Completed | Permit id: E55914707 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildbq%2f3svgqxsclsho6no7qt Date: July 10, 2015 Contractor: Dan Fluke; Joe Spinelli; Thomas Dvorak Client: Joe Spinelli | Permit type: Electrical | Permit status: Permit issued | Permit id: E35931909 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeiledhoumo5qejzvj%2fgmxqsiv Date: April 15, 2015 Client: Howard University | Permit type: Electrical | Permit status: Permit issued | Permit id: E83100828 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilck%2bhu%2fbrm%2boi9opl%2f4mo4h Date: August 4, 2015 Contractor: David Jones; Howard University; Edwin Hancock Client: Howard University | Permit type: Mechanical | Permit status: Completed | Permit id: Ar39664111 | |||||
SCORE 88 Interior revision to b1609782 to show new occupancy calculations based on number of plumbing fixtures provided. New occupant load up to 320. No other changes to project size or scope. Office and classrooms. Date: July 10, 2017 Contractor: Sam Hollen Client: Howard University (land Only) | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1708966 | |||||
SCORE 93 Mechanical Date: January 15, 2013 Contractor: Ricardo Guilette Client: Howard University | Permit status: Completed | Permit id: M1300723 | |||||
SCORE 59 Interior renovation of exisitng shell space for alteration to mechanical plumbing electrical systems Date: August 27, 2012 Contractor: Howard University Fvi2020 Client: Howard University | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1213082 | |||||
SCORE 56 Convert retail space into ice cream parlor. New tenant layout for new self-serve frozen yogurt store. Date: November 8, 2012 Contractor: Howard University Chris Wing Client: Howard University | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1210986 | |||||
SCORE 93 Mechanical Date: January 15, 2013 Contractor: Ricardo Guilette Client: Howard University | Permit status: Completed | Permit id: M1300723 | |||||
SCORE 56 Convert retail space into ice cream parlor. New tenant layout for new self-serve frozen yogurt store. Date: November 8, 2012 Contractor: Howard University; Chris Wing Client: Howard University | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1210986 | |||||
SCORE 59 Interior renovation of exisitng shell space for alteration to mechanical plumbing electrical systems Date: August 27, 2012 Contractor: Howard University; Fvi2020 Client: Howard University | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1213082 | |||||
SCORE 93 Mechanical Date: January 15, 2013 Contractor: Ricardo Guilette Client: Howard University | Permit status: Completed | Permit id: M1300723 | |||||
SCORE 59 Interior renovation of shell space for minor alteration and repair to mechanical plumbing and electrical systems no structural work involved in this permit Date: August 27, 2012 Contractor: Howard University Fvi2020 Client: Howard University | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1213084 | |||||
SCORE 59 Interior renovation of shell space for minor alteration and repair to mechanical plumbing and electrical systems no structural work involved in this permit Date: August 27, 2012 Contractor: Howard University; Fvi2020 Client: Howard University | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1213084 | |||||
SCORE 88 Plumbing and gas Date: December 4, 2012 Contractor: Paul M. Vito Client: Howard University | Permit status: Completed | Permit id: P1301441 | |||||
SCORE 88 Plumbing and gas Date: December 4, 2012 Contractor: Paul M. Vito Client: Howard University | Permit status: Completed | Permit id: P1301441 | |||||
SCORE 88 Plumbing and gas Date: December 4, 2012 Contractor: Paul M. Vito Client: Howard University | Permit status: Completed | Permit id: P1301441 | |||||
SCORE 100 Interior alteration to existing suite on part of 1st flr. For 84 occupancy load restaurant with an accessory kitchen, new bathrooms and general seating area. Date: October 30, 2013 Contractor: George Delgado Client: Lincoln Clark | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1310195 | |||||
SCORE 96 Mechanical Date: October 31, 2013 Contractor: Michael F. Didion Client: Howard University | Permit status: Completed | Permit id: M1400328 | |||||
SCORE 96 Mechanical Date: October 31, 2013 Contractor: Michael F. Didion Client: Howard University | Permit status: Completed | Permit id: M1400328 | |||||
SCORE 96 Mechanical Date: October 31, 2013 Contractor: Michael F. Didion Client: Howard University | Permit status: Completed | Permit id: M1400328 | |||||
SCORE 93 Interior alteration of existing shell for a new restaurant on part of the 1st floor to include demolition, new hood system, hvac, electrical, plumbing, mechanical as per plans. 3486 sqft, 36 seats, 65 occupancy. Exterior renovations to include new finishes and lighting, entry doors. Tpr. Signage under separate permit. Date: February 11, 2015 Contractor: Joe Spinelli Restaurant Consultants Client: Howard University | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1502893 | |||||
SCORE 96 Plumbing and gas Date: April 13, 2015 Contractor: Martin R Saia Client: Howard University | Permit status: Completed | Permit id: P1504953 | |||||
Plumbing and gas Date: April 1, 2015 Client: Howard University | Permit status: Permit issued | Permit id: P1504683 | |||||
SCORE 78 Install 2 two illuminated wall signs for chipotle with logo. Sign 1 10ft. 3in. X2ft. Equals 20. 5 sq. Ft. Sign 2 blade sign 2ft. 6in. Diameter equals 7. 85 sq. Ft. Each side. Total sq, ft. Of all signs 1 single face sign and 1 double face sign is 28. 35 sq. Ft. Date: March 11, 2015 Contractor: Bob Wallace Danten Permit Service; Wallace Client: Howard University | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1500187 | |||||
SCORE 89 Interior alteration of existing shell for a new restaurant on part of the 1st floor to include demolition, new hood system, hvac, electrical, plumbing, mechanical as per plans. 3486 sqft, 36 seats, 65 occupancy. Exterior renovations to include new finishes and lighting, entry doors. Tpr. Signage under separate permit. Date: February 11, 2015 Contractor: Joe Spinelli, Restaurant Consultants Client: Howard University | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1502893 | |||||
Plumbing and gas Date: April 1, 2015 Client: Howard University | Permit status: Permit issued | Permit id: P1504683 | |||||
SCORE 96 Plumbing and gas Date: April 13, 2015 Contractor: Martin R Saia Client: Howard University | Permit status: Completed | Permit id: P1504953 |