Building Permits at 23 Madison Street Nw Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 23 Madison Street Nw Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
86
Roll off debris container
Contractor: Razark Abdul

Permit status: Notpaid | Expiration date: December 3, 2016 | Permit id: 0
08623 Madison Street Nw Washington DcRazark Abdul
SCORE
86
Roll off debris container
Contractor: Razark Abdul

Permit status: Not paid | Expiration date: December 3, 2016 | Permit id: 0
08623 Madison Street Nw Washington DcRazark Abdul
SCORE
86
Roll off debris container
Contractor: Razark Abdul

Permit status: Notpaid | Expiration date: December 3, 2016 | Permit id: 0
08623 Madison Street Nw Washington DcRazark Abdul
SCORE
82
Dccr proposes to drill one geotechnical boring (rcagi-36) located in the westbound parking lane of madison street nw south of 23 madison st nw. The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for add
Date:  October 15, 2015
Contractor: Salut Inc

Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa117623
2015/10/1508223 Madison Street Nw Washington DcSalut Inc
SCORE
79
Construction staging area
Date:  November 6, 2015

Permit status: Permit expired | Expiration date: December 9, 2015 | Permit id: Pa10218423
2015/11/0607923 Madison Street Nw Washington DcMark Fletcher Salut, Inc
SCORE
63
Roll off debris container
Date:  March 25, 2016
Contractor: Folahanmi Adunola

Permit status: Permit expired | Expiration date: April 4, 2016 | Permit id: Pa10236487
2016/03/2506323 Madison Street Nw Washington DcFolahanmi Adunola
SCORE
86
Roll off debris container
Contractor: Razark Abdul

Permit status: Not paid | Expiration date: December 3, 2016 | Permit id: 0
08623 Madison Street Nw Washington DcRazark Abdul
SCORE
86
Roll off debris container
Date:  July 28, 2016
Contractor: Razark Abdul

Permit status: Permit expired | Expiration date: November 3, 2016 | Permit id: Pa10328058
2016/07/2808623 Madison Street Nw Washington DcRazark Abdul
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.