Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Electric heat pump and or air conditioner replacement, no modifications or alterations to existing system Date: July 19, 2017 Contractor: Gabriel Carini Heating And Air Conditioning Inc Permit type: Addn | Permit status: Completed | Completion date: August 22, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 82 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 7, 2017 Contractor: Solar Tech Energy Systems Inc Permit type: Addn | Permit status: Completed | Completion date: September 6, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 82 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 7, 2017 Contractor: Solar Tech Energy Systems Inc Permit type: Online | Permit status: Completed | Permit id: Pds2017-Resalt- | |||||
SCORE 100 Electric heat pump and or air conditioner replacement, no modifications or alterations to existing system Date: July 19, 2017 Contractor: Gabriel Carini Heating And Air Conditioning Inc Permit type: Hra electric heat pump/ac r&r | Permit status: Completed | Permit id: Pds2017-Resalt- |