Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 General repairs single-family dwelling exploratory demo of a single family dwelling, plans to follow. Interior work only. Date: October 2, 2001 Contractor: Rudolph J Helwick Client: Helwick 4, Rudolph J | Permit id: B01004745 | |||||
SCORE 56 Building addition (less than 50% new) single-family dwelling addition of (367 s. F.) extending 2nd level to existing (1283 s. F.) as per plans & hdlc 13714. Electrical, plumbing & hvac. Date: November 20, 2001 Contractor: Rudy Helwick Client: Helwick 4, Rudolph J | Permit id: B01005473 | |||||
SCORE 89 Electrical construction loop single-family dwelling larry munster Date: March 5, 2002 Contractor: Larry Munster Client: Helwick 4, Rudolph J | Permit id: E02001616 | |||||
SCORE 89 Increase of service single-family dwelling larry munster Date: March 13, 2002 Contractor: Larry Munster Client: Helwick 4, Rudolph J | Permit id: E02001976 | |||||
SCORE 62 Install mechanical equipment single-family dwelling install gas warm air furnace and 4-ton ac system -with duct work. Andy mc cool - 279-09 Date: March 6, 2002 Contractor: Mc Cools Ac Client: Helwick 4, Rudolph J | Permit id: M02001464 | |||||
SCORE 62 Install mechanical equipment single-family dwelling install gas warm air furnace and 4-ton a c system -with duct work. Andy mc cool - 279-0950 Date: March 5, 2002 Contractor: Mc Cools A C Client: Helwick 4, Rudolph J | Permit id: M02001464 |