Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Mechanical permit Date: March 9, 2015 Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit status: Completed | Permit id: 594796 | |||||
Addition permit Date: September 5, 2014 Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit status: Completed | Permit id: 555345 | |||||
Suppression permit Date: July 13, 2015 Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit status: Completed | Permit id: 601760 | |||||
Alteration permit Date: May 20, 2014 Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit status: Completed | Permit id: 519031 | |||||
Zoning/use permit Date: July 8, 2014 Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit status: Completed | Permit id: 544331 | |||||
Electrical permit Date: December 12, 2014 Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit status: Completed | Permit id: 571863 | |||||
Plumbing permit Date: February 9, 2015 Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit status: Completed | Permit id: 589517 | |||||
Suppression permit Date: July 13, 2015 Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit status: Completed | Permit id: 601760 | |||||
Electrical permit Date: December 12, 2014 Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit status: Completed | Permit id: 571863 | |||||
Alteration permit Date: May 20, 2014 Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit status: Completed | Permit id: 519031 | |||||
Plumbing permit Date: February 9, 2015 Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit status: Completed | Permit id: 589517 | |||||
Zoning use permit Date: July 8, 2014 Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit status: Completed | Permit id: 544331 | |||||
Addition permit Date: September 5, 2014 Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit status: Completed | Permit id: 555345 | |||||
Mechanical permit Date: March 9, 2015 Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit status: Completed | Permit id: 594796 | |||||
SCORE 100 Install 3 hvac units with ductwork(3 family) Date: March 9, 2015 Contractor: Talgar Inc Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 29, 2015 | Permit id: 594796 | |||||
SCORE 86 Installation of automatic sprinkler system with two inch (2") service line, backflow prevention device and fire department connection in accordance with nfpa 13-r throughout a four (4) story structure with basement (three (3) dwelling units). Separate permits required for all electrical and plumbing work. Date: July 13, 2015 Contractor: Integ Mechan And Fire Systems Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: September 3, 2015 | Permit id: 601760 | |||||
SCORE 100 Exsterior interior alterations to structurally repair and rebuild the rear exterior masonry bearing wall and to remove and replace deteriorated roof joists as per structural report and engineered design plans, to comply violation #364056. Date: May 20, 2014 Contractor: Green Construction Concepts Ll Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: June 19, 2014 | Permit id: 519031 | |||||
For the erection of a fourth story addtion and roof deck at the rear of existing three story structure for continued use as a three family household living. Date: July 8, 2014 Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 8, 2014 | Permit id: 544331 | |||||
For the erection of a 4th floor. Addition & roof deck on an existing three story structure, level iii alterations throughout, and underpinning. All work shall be in accordance with approved plans. Permit holder to notify owner(s) of adjoining property(ies) no less than ten (10) days prior to commencement of permitted work. Asbestos abatement required prior to commencement of work. Certificate of occupancy on this permit for documentation. Date: September 5, 2014 Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit type: Addition permit | Permit status: Completed | Completion date: August 27, 2015 | Permit id: 555345 | |||||
SCORE 96 Install 400amp 4 meter service,outlets,switches,lighting fixtures,utilities,appliances as per 2008nec(cc district) install lo-volt f a system and 120v smoke detectors as per nfpa72 Date: December 12, 2014 Contractor: Sfb Wiring Systems Llc Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: October 27, 2015 | Permit id: 571863 | |||||
SCORE 100 Installing 4 toilets,4 vanity,4 bathtubs,3 ks,3 wb,installing 1" domestic water service-pa#20150250412-"self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: February 9, 2015 Contractor: Tommys Plumbing Client: Mam Developments Llc | Client Company: Mam Development Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 29, 2015 | Permit id: 589517 |