Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: November 25, 2016 Client: Depaul Peter | Permit status: Active | Permit id: 739201 | |||||
Zoning use permit Date: January 5, 2017 Client: Depaul Peter | Permit status: Completed | Permit id: 741166 | |||||
Demolition permit Date: January 5, 2017 Client: Depaul Peter | Permit status: Active | Permit id: 741170 | |||||
SCORE 89 Seal lateral and remove curb trap pa20163300141 (warehouse)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: November 25, 2016 Contractor: City Plumbing Llc Client: Epaul Peter | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 31, 2017 | Permit id: 739201 | |||||
SCORE 84 Amend demolition permit #7411 to change special inspection agency and dprc-si to pennoni associates inc as per attached documentation. Date: February 8, 2017 Contractor: Tony Depaul And Son Client: Epaul Peter | Permit type: Administrative permit | Permit status: Completed | Completion date: March 3, 2017 | Permit id: 757664 | |||||
SCORE 84 Reinforced masonry retaining wall w. Engineered soil reinforcing system & associated fence installation per approved plans w. Earth disturbance not to exceed 5,0 sqft. All means of pedestrian protection to be in place prior to start of work. Date: May 30, 2017 Contractor: Tony Depaul And Son Client: Epaul Peter | Permit type: Alteration permit | Permit status: Active | Completion date: June 5, 2017 | Permit id: 780457 | |||||
SCORE 84 Demolition of three (3) existing contiguous buildings on site. Complete demolition of two (2) existing one story, concrete, masonry and steel industrial buildings (buildings 1 & 2) by mechanical methods. Complete demolition a two (2) story concrete, masonry, wood and steel industrial building (building 3) by hand (to reduce height) and mechanical methods. Special inspections required for demolition of building 3. All permitted demolition activity to be in accordance with approved site safety demolition plan & such plan to be maintained on site at all times in accordance with philadelphia administrative code. Complete sidewalk closure on luzerne street required as reflected on approved site plan and in accordance with section 3306 of the ibc. Separate street closure permit required prior to start of work. Any deviation will require an amended building permit. Date: January 5, 2017 Contractor: Tony Depaul And Son Client: Epaul Peter | Permit type: Demolition permit | Permit status: Completed | Completion date: July 26, 2017 | Permit id: 741170 | |||||
SCORE 84 For the complete demolition of all buildings on lot. Size and location as shown in application. For use to vacant lot. See a p 7411 for plans Date: January 5, 2017 Contractor: Tony Depaul And Son Client: Epaul Peter | Permit type: Zoning/use permit | Permit status: Completed | Completion date: January 5, 2017 | Permit id: 741166 |