4kw roof mount residential solar pv for existing sfd. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 2, 2014 Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: July 23, 2014 | Permit id: Pds2014-Resalt- | |||||
Roof mount residential solar pv for existing sfd no. Of modules: 14 no. Of inverters: 1 total system size in kilowatts: 3. 29 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 26, 2012 Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: December 14, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 68 Sfd re-roof -- remove comp replace with same @ 37 s. F. Your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: December 14, 2012 | Permit id: Pds2012-1030-20 | |||||
Fico misc electrical and plumbing for new outlets and canned lighting and plumbing fixtures. Replacing fire door to garage (non fico) (customer states drywall work is only for prepping it for texture no new drywall added or removed) Date: March 8, 2011 Permit type: Combination : 80 - a | Permit status: Permit finaled | Completion date: June 6, 2011 | Permit id: Pds2011-1005-20 | |||||
Roof mount residential solar pv for existing sfd no. Of modules 14 no. Of inverters 1 total system size in kilowatts 3. 29 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 26, 2012 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 14, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 59 Fico misc electrical and plumbing for new outlets and canned lighting and plumbing fixtures. Replacing fire door to garage (non fico) (customer states drywall work is only for prepping it for texture no new drywall added or removed) Date: March 8, 2011 Contractor: Guttas Houses Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 6, 2011 | Permit id: Pds2011-1005-20 | |||||
SCORE 100 4 s. F. Pool an slide for existing sfd. Permit type: New residential acc structure | Permit status: Issued | Permit id: Pds2017-Resacc- | |||||
SCORE 99 Sfd re-roof -- remove comp/replace with same @ 37 s. F. Your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 14, 2012 | Permit id: Pds2012-1030-20 | |||||
Final Date: July 21, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
Final Date: December 12, 2012 Permit status: Pass | Permit id: Pds2012-1031-20 | |||||
Final Date: June 1, 2011 Permit status: Pass | Permit id: Pds2011-1005-20 |