Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington mhp #22 Date: November 22, 2013 Permit status: Co issued | Permit id: 13-06324 | |||||
SCORE 100 Wellington mhp #22 Client: Wellington Mhp #22 | Permit type: Res: mfg. Home | Permit status: Co issued | Current use: Residential | Permit id: 13-06324 | Parcel: 5996 | |||||
SCORE 95 Wellington mhp #22 Client: Wellington Mhp #22 | Permit type: Res: mfg. Home | Permit status: Co issued | Current use: Residential | Permit id: 13-06324 | Parcel: 5996 | |||||
SCORE 100 Wellington mhp #22 Client: Wellington Mhp #22 | Permit type: Res: mfg. Home | Permit status: Co issued | Current use: Residential | Permit id: 13-06324 | Parcel: 5996 | |||||
October 15, 2013 1:12:08 pm heatherr. Wellington mhp #22 move in used mobile home and set up; har location:wellington estates off airport rd; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting until final inspection has been made. Permit type: Res: mfg. Home | Permit status: Co issued | Permit id: 13-06324 | Parcel: 5996 | |||||
Wellington mhp #22 Date: November 22, 2013 Value: $23,725 Permit type: Residential | Permit status: Co issued | Permit id: 13-06324 | |||||
October 15, 2013 1:12:08 pm heatherr. Wellington mhp #22 move in used mobile home and set up; har location:wellington estates off airport rd; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting until final inspection has been made. Date: November 22, 2013 Permit type: Res: mfg. Home | Permit status: Co issued | Permit id: 13-06324 | Parcel: 5996 |