SCORE 99 Add alter foundation only stage 1 Applicant: Nbc Universal | Permit status: Finaled | Completion date: April 16, 2009 | Expiration date: July 28, 2008 | Permit id: 801290011 | |||||
SCORE 100 Meeting 09 18 07 Date: September 17, 2007 Contractor: Classic Party Rentals Applicant: Classic Party Rents | Permit status: Finaled | Completion date: September 18, 2007 | Expiration date: March 15, 2008 | Permit id: 709170001 | |||||
SCORE 99 Convert audience stage to production t-i 4 story bldg Applicant: Guieb Melvin | Permit status: Finaled | Completion date: September 21, 2011 | Expiration date: May 9, 2012 | Permit id: 1102230007 | |||||
SCORE 100 International screenings event 05 22-26 06 Date: May 16, 2006 Contractor: Classic Party Rentals Applicant: Classic Party Rents | Permit status: Finaled | Completion date: May 26, 2006 | Expiration date: November 12, 2006 | Permit id: 605160007 | |||||
SCORE 100 Bat mitzvah 10 06 07 Date: September 25, 2007 Contractor: Classic Party Rentals Applicant: Classic Party Rents | Permit status: Finaled | Completion date: October 8, 2007 | Expiration date: March 23, 2008 | Permit id: 709250004 | |||||
SCORE 100 Reception 09 25 07 Date: September 17, 2007 Contractor: Classic Party Rentals Applicant: Classic Party Rents | Permit status: Finaled | Completion date: September 25, 2007 | Expiration date: March 15, 2008 | Permit id: 709170003 | |||||
SCORE 99 New four story stage 1 core & shell Date: April 21, 2008 Contractor: Rosendin Electric Applicant: Nbc Universal | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: October 18, 2008 | Permit id: 801280013 | |||||
SCORE 99 New four story stage 1 t-i buildout Date: May 20, 2008 Contractor: Rosendin Electric Applicant: Nbc Universal | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: November 16, 2008 | Permit id: 801280014 | |||||
SCORE 100 Meeting 09 22-23 07 Date: September 18, 2007 Contractor: Classic Party Rentals Applicant: Classic Party Rents | Permit status: Finaled | Completion date: September 23, 2007 | Expiration date: March 16, 2008 | Permit id: 709180002 | |||||
SCORE 99 El for converting audience stage to production t-i 4 story bldg Date: May 10, 2011 Contractor: Matt Construction Applicant: Guieb Melvin | Permit status: Finaled | Completion date: September 21, 2011 | Expiration date: May 9, 2012 | Permit id: 1102240037 | |||||
SCORE 100 Wedding 09 08 07 Date: September 6, 2007 Contractor: Classic Party Rentals Applicant: Classic Party Rents | Permit status: Finaled | Completion date: September 10, 2007 | Expiration date: March 4, 2008 | Permit id: 709060001 | |||||
SCORE 100 Meeting 10 02 07 Date: September 25, 2007 Contractor: Classic Party Rentals Applicant: Classic Party Rents | Permit status: Finaled | Completion date: October 2, 2007 | Expiration date: March 23, 2008 | Permit id: 709250005 | |||||
SCORE 100 Reception 09 20 07 Date: September 17, 2007 Contractor: Classic Party Rentals Applicant: Classic Party Rents | Permit status: Finaled | Completion date: September 20, 2007 | Expiration date: March 15, 2008 | Permit id: 709170002 | |||||
SCORE 100 Hvac distribution for sound lock in stage Date: July 31, 2012 Contractor: Acco Engineered Systems Applicant: Acco Engineered Systems | Permit status: Finaled | Completion date: September 24, 2012 | Expiration date: July 31, 2013 | Permit id: 1207310018 | |||||
SCORE 99 Lighting circuit for loading dock Date: December 2, 2009 Contractor: Al Olivas Applicant: Olivas Al | Permit status: Finaled | Completion date: December 16, 2009 | Expiration date: December 2, 2010 | Permit id: 911250013 | |||||
SCORE 99 Stage improvements-dimmer racks and stage lighting Date: August 28, 2012 Contractor: Unison Electric Applicant: Unison Electric | Permit status: Finaled | Completion date: September 24, 2012 | Expiration date: August 28, 2013 | Permit id: 1208020024 | |||||
SCORE 100 Repair house sewer in avenue b Date: December 29, 2011 Contractor: Mark Wiedeman Applicant: Wiedeman Mark | Permit status: Finaled | Completion date: January 12, 2012 | Expiration date: December 28, 2012 | Permit id: 1112280002 | |||||
SCORE 99 Connect sewer to new building Date: November 17, 2008 Contractor: Miles Allen Applicant: Allen Miles | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: May 16, 2009 | Permit id: 811140002 | |||||
SCORE 99 Change lav to hair wash sink room 107 Date: June 29, 2009 Contractor: Miles Allen Applicant: Allen Miles | Permit status: Finaled | Completion date: July 30, 2009 | Expiration date: December 26, 2009 | Permit id: 906260002 | |||||
SCORE 99 Connect domestic water & gas to new building Date: November 17, 2008 Contractor: Miles Allen Applicant: Allen Miles | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: May 16, 2009 | Permit id: 811140013 | |||||
SCORE 60 3" waste line and 4" foundation collector Date: February 14, 2008 Contractor: Dk Mechanical Contractors Applicant: Nbc Universal | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: August 12, 2008 | Permit id: 802140001 | |||||
SCORE 81 New four story/stage 1 core & shell Date: April 21, 2008 Contractor: D K Mechanical Contractors Inc Applicant: Nbc Universal | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: October 18, 2008 | Permit id: 801280008 | |||||
SCORE 81 New four story/stage 1 t-i buildout Date: May 20, 2008 Contractor: D K Mechanical Contractors Inc Applicant: Nbc Universal | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: November 16, 2008 | Permit id: 801280009 | |||||
SCORE 99 Add isolation valve to existing water line Date: January 10, 2008 Contractor: Miles Allen Applicant: Allen Miles | Permit status: Finaled | Completion date: February 1, 2008 | Expiration date: July 8, 2008 | Permit id: 801100002 | |||||
SCORE 56 Temporary bleacher systems for audience seating Applicant: E Networks Productions | Permit status: Finaled | Completion date: September 21, 2012 | Expiration date: March 13, 2013 | Permit id: 1209130003 | |||||
SCORE 99 Office trailer during construction Applicant: Matt Construction | Permit status: Finaled | Completion date: October 17, 2009 | Expiration date: April 7, 2008 | Permit id: 710100001 | |||||
SCORE 75 Temp trailer for construction & production Date: May 20, 2002 Contractor: G E Capital Applicant: Shady Acres | Permit status: Finaled | Completion date: November 20, 2002 | Expiration date: November 16, 2002 | Permit id: 205200003 | |||||
SCORE 99 2-5ton package units on roof Date: August 2, 2011 Contractor: Western Allied Corp Applicant: Western Allied Corp. | Permit status: Finaled | Completion date: September 5, 2011 | Expiration date: August 1, 2012 | Permit id: 1108020007 | |||||
SCORE 100 Duct alteration & booster fan in perms Date: July 6, 2009 Contractor: Ron Cromar Applicant: Cromar Ron | Permit status: Finaled | Completion date: July 14, 2009 | Expiration date: January 2, 2010 | Permit id: 906150004 | |||||
SCORE 99 Decorative gas appliance on roof patio Date: April 20, 2009 Contractor: Matt Construction Applicant: Nbc Universal | Permit status: Finaled | Completion date: July 30, 2009 | Expiration date: October 17, 2009 | Permit id: 904060001 | |||||
SCORE 97 Replace package unit on roof (4 ton) Date: June 29, 2007 Contractor: Critchfield Mechanical Inc Applicant: Critchfield Mechanical | Permit status: Finaled | Completion date: July 17, 2007 | Expiration date: December 26, 2007 | Permit id: 706290003 | |||||
SCORE 99 Video picture frames in lobby Date: July 17, 2009 Contractor: Al Olivas Applicant: Olivas Al | Permit status: Finaled | Completion date: July 24, 2009 | Expiration date: July 17, 2010 | Permit id: 907160004 | |||||
SCORE 99 Duct alteration & booster fan in perms Date: July 7, 2009 Contractor: Al Olivas Applicant: Olivas Al | Permit status: Finaled | Completion date: July 14, 2009 | Expiration date: January 3, 2010 | Permit id: 906150009 | |||||
SCORE 98 Conduits only----only conduits---conduits only Date: December 19, 2008 Contractor: Morrowmeadows Corp Applicant: Morrow Meadows | Permit status: Finaled | Completion date: February 5, 2009 | Expiration date: June 17, 2009 | Permit id: 812190001 | |||||
SCORE 99 Temporary generator for construction Date: September 25, 2008 Contractor: Rosendin Electric Applicant: Rosenden Electric | Permit status: Finaled | Completion date: January 22, 2009 | Expiration date: March 24, 2009 | Permit id: 809250002 | |||||
SCORE 100 High voltage substation Date: March 6, 2008 Contractor: Dean Flogstad Applicant: Nbc Universal | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: September 2, 2008 | Permit id: 803060018 | |||||
SCORE 100 Temp power for construction & safe off stage demo Date: January 10, 2008 Contractor: Dean Flogstad Applicant: Flogstad Dean | Permit status: Finaled | Completion date: April 16, 2009 | Expiration date: July 8, 2008 | Permit id: 801090024 | |||||
SCORE 100 New disconnect for rooftop package unit Date: July 12, 2007 Contractor: Dean Flogstad Applicant: Flogstad Dean | Permit status: Finaled | Completion date: July 17, 2007 | Expiration date: January 8, 2008 | Permit id: 707110011 | |||||
SCORE 99 Fire sprinklers for sound lock and rack room Applicant: Guieb Melvin | Permit status: Finaled | Completion date: September 24, 2012 | Expiration date: August 24, 2013 | Permit id: 1208240014 | |||||
SCORE 99 Sound lock and dimmer room for stage 1 Applicant: Guieb Melvin | Permit status: Finaled | Completion date: September 24, 2012 | Expiration date: July 23, 2013 | Permit id: 1207230003 | |||||
Add vinyl sign frame to building Date: November 2, 2011 Value: $8,000 Applicant: Amatya Jitendra | Permit status: Finaled | Completion date: December 12, 2011 | Expiration date: November 1, 2012 | Permit id: 1110260026 | |||||
SCORE 100 Repair-reinforce roof for new package unit & reroof Applicant: Amatya Jitendra | Permit status: Finaled | Completion date: September 5, 2011 | Expiration date: July 26, 2012 | Permit id: 1107200012 | |||||
SCORE 99 Fire sprinkler alterations for t-i Applicant: Nbc Universal | Permit status: Finaled | Completion date: September 21, 2011 | Expiration date: July 7, 2012 | Permit id: 1107050005 | |||||
SCORE 56 Soundproof band room ceiling Applicant: Schwaid Ben | Permit status: Finaled | Completion date: July 30, 2009 | Expiration date: December 22, 2009 | Permit id: 906250026 | |||||
SCORE 100 Fire sprinklers for mezzanine Applicant: Advance Fire Protection | Permit status: Finaled | Completion date: July 30, 2009 | Expiration date: December 23, 2009 | Permit id: 906110020 | |||||
SCORE 61 Mezzanine structure in scene dock Applicant: Schwaid Ben | Permit status: Finaled | Completion date: July 30, 2009 | Expiration date: July 8, 2010 | Permit id: 904230008 | |||||
SCORE 99 Basement alterations enlarge insert studio Applicant: Schwaid Ben | Permit status: Finaled | Completion date: July 30, 2009 | Expiration date: October 4, 2009 | Permit id: 904060004 | |||||
SCORE 99 Add arbor system Applicant: Nbc Universal | Permit status: Finaled | Completion date: May 29, 2009 | Expiration date: August 10, 2009 | Permit id: 902100003 | |||||
SCORE 99 Repair existing wood trusses Applicant: Guieb Melvin | Permit status: Finaled | Completion date: April 16, 2009 | Expiration date: July 27, 2009 | Permit id: 901210006 | |||||
SCORE 100 Fire sprinkler system Applicant: Nbc Universal | Permit status: Finaled | Completion date: April 16, 2009 | Expiration date: January 5, 2009 | Permit id: 805140008 | |||||
SCORE 100 Fire sprinkler system Applicant: Nbc Universal | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: January 5, 2009 | Permit id: 805140015 | |||||
SCORE 56 Interior non-structural "demo" of acoustical panels Applicant: Nbc Universal | Permit status: Finaled | Completion date: April 16, 2009 | Expiration date: October 11, 2008 | Permit id: 804020017 | |||||
SCORE 100 Demo 2 story "annex" bldg on front of stage 1 Applicant: Nbc Universal | Permit status: Finaled | Completion date: December 20, 2007 | Expiration date: May 5, 2008 | Permit id: 710310021 | |||||
SCORE 99 New four story office-foundation only Applicant: Nbc Universal | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: March 31, 2008 | Permit id: 709260032 | |||||
SCORE 99 Addition alteration to existing stage 1 Applicant: Nbc Universal | Permit status: Finaled | Completion date: April 16, 2009 | Expiration date: September 22, 2008 | Permit id: 708080016 | |||||
SCORE 99 New four story office building Applicant: Nbc Universal | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: September 9, 2008 | Permit id: 708080029 | |||||
SCORE 99 Shoring plan for 4-story building feet is deepest dim Engineer: Burnett And Young | Applicant: Matt Construction | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: March 31, 2008 | Permit id: 708310002 | |||||
SCORE 100 Repair-reinforce roof for new package unit Applicant: Amatya Jitendra | Permit status: Finaled | Completion date: July 17, 2007 | Expiration date: June 22, 2008 | Permit id: 706280025 | |||||
SCORE 99 Temp 4 amp fot stage lighting dimmer rack Date: October 15, 2012 Contractor: Unison Electric Applicant: Unison Electric | Permit status: Finaled | Completion date: December 12, 2012 | Expiration date: October 15, 2013 | Permit id: 1210150005 | |||||
SCORE 99 Stage improvements-dimmer room & sound lock entry Date: August 9, 2012 Contractor: Unison Electric Applicant: Unison Electric | Permit status: Finaled | Completion date: September 24, 2012 | Expiration date: August 9, 2013 | Permit id: 1208090005 | |||||
SCORE 99 Storm drain re-route in avenue b Date: September 14, 2007 Contractor: Miles Allen Applicant: Allen Miles | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: March 12, 2008 | Permit id: 709130003 | |||||
SCORE 99 Tenant improvement stage 1 & 4 story Applicant: Guieb Melvin | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: November 15, 2008 | Permit id: 804280026 | |||||
SCORE 98 Dimming system for live show stage Date: February 5, 2009 Contractor: Morrowmeadows Corp Applicant: Morrow Meadows | Permit status: Finaled | Completion date: April 16, 2009 | Expiration date: August 4, 2009 | Permit id: 902040002 | |||||
SCORE 99 T-i-remove non-structural elements return to core-shell condition for future buildout Applicant: Guieb Melvin | Permit status: Finaled | Completion date: September 21, 2011 | Expiration date: March 22, 2012 | Permit id: 1012080007 | |||||
SCORE 99 Add plugs and switch for band practice room Date: August 20, 2009 Contractor: Al Olivas Applicant: Olivas Al | Permit status: Finaled | Completion date: September 18, 2009 | Expiration date: August 20, 2010 | Permit id: 908170006 | |||||
SCORE 100 Exit and emergency lighting Date: May 7, 2004 Contractor: Dean Flogstad Applicant: Flogstad Dean | Permit status: Finaled | Completion date: June 8, 2004 | Expiration date: November 3, 2004 | Permit id: 405040010 | |||||
SCORE 100 Interior non-structural "demo" in prep for t-i Applicant: Nbc Universal | Permit status: Finaled | Completion date: April 16, 2009 | Expiration date: July 28, 2008 | Permit id: 801280015 | |||||
SCORE 100 Replace windows in conans dressing room Applicant: P N G Ben | Permit status: Finaled | Completion date: February 26, 2010 | Expiration date: October 30, 2010 | Permit id: 910290014 | |||||
SCORE 78 Non illuminated letter sign "the tonight show" Applicant: Superior Electric Advertising | Permit status: Finaled | Completion date: December 1, 2009 | Expiration date: November 18, 2010 | Permit id: 911040002 | |||||
SCORE 56 Remove arbor system and slab beneath. Applicant: Craftsman Concrete Cutting | Permit status: Finaled | Completion date: February 9, 2011 | Expiration date: November 5, 2011 | Permit id: 1011040005 | |||||
SCORE 99 New disconnect for rooftop package unit Date: August 9, 2011 Contractor: Al Olivas Applicant: Olivas Al | Permit status: Finaled | Completion date: September 5, 2011 | Expiration date: August 8, 2012 | Permit id: 1108020006 | |||||
SCORE 99 New four story stage 1 t-i buildout Date: February 11, 2009 Contractor: Rosendin Electric Applicant: Nbc Universal | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: August 10, 2009 | Permit id: 901120013 | |||||
SCORE 100 Meeting dinner 08 21 07 Date: August 21, 2007 Contractor: Classic Party Rentals Applicant: Classic Party Rents | Permit status: Finaled | Completion date: August 21, 2007 | Expiration date: February 17, 2008 | Permit id: 708210001 | |||||
SCORE 100 Fire sprinkler system Applicant: Nbc Universal | Permit status: Finaled | Completion date: April 16, 2009 | Expiration date: January 5, 2009 | Permit id: 805140008 | |||||
SCORE 100 Fire sprinkler system Applicant: Nbc Universal | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: January 5, 2009 | Permit id: 805140015 | |||||
SCORE 100 Fire sprinklers for mezzanine Applicant: Advance Fire Protection | Permit status: Finaled | Completion date: July 30, 2009 | Expiration date: December 23, 2009 | Permit id: 906110020 | |||||
SCORE 56 Soundproof band room ceiling Applicant: Schwaid Ben | Permit status: Finaled | Completion date: July 30, 2009 | Expiration date: December 22, 2009 | Permit id: 906250026 | |||||
SCORE 87 Non illuminated letter sign "the tonight show" Applicant: Superior Electric Advertising | Permit status: Finaled | Completion date: December 1, 2009 | Expiration date: November 18, 2010 | Permit id: 911040002 | |||||
SCORE 100 Add vinyl sign frame to building Applicant: Amatya Jitendra | Permit status: Finaled | Completion date: December 12, 2011 | Expiration date: November 1, 2012 | Permit id: 1110260026 | |||||
SCORE 69 Replace package unit on roof (4 ton) Date: June 29, 2007 Contractor: Critchfield Mechanical, Inc Applicant: Critchfield Mechanical | Permit status: Finaled | Completion date: July 17, 2007 | Expiration date: December 26, 2007 | Permit id: 706290003 | |||||
SCORE 75 New four story stage 1 core & shell Date: April 21, 2008 Contractor: D K Mechanical Contractors, Inc Applicant: Nbc Universal | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: October 18, 2008 | Permit id: 801280008 | |||||
SCORE 75 New four story stage 1 t-i buildout Date: May 20, 2008 Contractor: D K Mechanical Contractors, Inc Applicant: Nbc Universal | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: November 16, 2008 | Permit id: 801280009 | |||||
SCORE 68 New four story/stage 1 core & shell Date: April 21, 2008 Contractor: Duc Truong Western Allied Corporation Applicant: Nbc Universal | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: October 18, 2008 | Permit id: 801280004 | |||||
SCORE 99 New four/stage 1 t-i buildout Date: May 20, 2008 Contractor: Western Allied Corp Applicant: Nbc Universal | Permit status: Finaled | Completion date: March 9, 2009 | Expiration date: November 16, 2008 | Permit id: 801280005 | |||||
SCORE 100 Barmitzvah 08/25/07 Date: August 21, 2007 Contractor: Classic Party Rentals Applicant: Classic Party Rents | Permit status: Finaled | Completion date: August 24, 2007 | Expiration date: February 17, 2008 | Permit id: 708210002 | |||||