Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: July 27, 2017 Contractor: Sunpower Corporation Systems Permit type: Addn | Permit status: Completed | Completion date: October 18, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 99 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. And a new 240v outlet amp. Date: January 4, 2018 Contractor: Tmag Industries Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2018-Resalt- | |||||
SCORE 89 Master plans for 158 (tm 5365-3) phase 5, 34 productions units lots 19-30, 62-70, 85-97, 62- for harmony grove "lusitano" see pds2016-tphspc-000017 (calatlantic group) plan type 3c lot #69 2018 sf 2 story sfd w ac fs 451 sf gar fin fs 65 sf porch all elevations Permit type: Tract models or prod units | Permit status: Completed | Completion date: November 3, 2017 | Permit id: Pds2017-Tphspm- | |||||
Shower(s)/hot mop/liner/lath Date: September 5, 2017 Permit status: Fail | Permit id: Pds2017-Tphspm- |