Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 71 Residential flip house Date: December 7, 2015 Contractor: Solid Construction Group Llc2155 South Permit type: Electrical | Permit status: Closed | Completion date: April 27, 2016 | Current use: Residential | Permit id: Bld2015-10440 | |||||
SCORE 56 Plumbing updated. New fixtures set. 9 fixtures Date: April 13, 2016 Contractor: Solid Construction Grp.5 E Permit type: Plumbing | Permit status: Closed | Completion date: April 27, 2016 | Current use: Residential | Permit id: Bld2016-03465 | |||||
SCORE 64 Interior demo of plaster and flooring and cabinetry. New drywall, print, flooring and cabinets. General interior repair permit. Date: August 31, 2015 Contractor: Solid Constructionsolid Construction Permit status: Closed | Completion date: April 11, 2016 | Current use: Residential | Permit id: Bld2015-06984 | |||||
SCORE 64 Rear addition, repair basement stairs (outside) interior remodel of basement and main floors. R-1-50 zone. Existing concrete retaining wall at walkout basement entrance to remain. Date: September 24, 2015 Contractor: Solid Construction Group Llcjosh Fox Permit status: Inspections | Completion date: February 4, 2016 | Current use: Residential | Permit id: Bld2015-07805 | |||||
SCORE 71 Remodel existing sfd m. E. P. Permits reqd ( rear addition is to be on a future permit Date: October 1, 2015 Contractor: Solid Construction Group Llc2155 South Permit status: Closed | Completion date: April 29, 2016 | Current use: Residential | Permit id: Bld2015-08038 | |||||
SCORE 96 1 furnance Date: October 19, 2015 Contractor: Furnace Man Heatingcooling Llc Permit type: Mechanical | Permit status: Closed | Completion date: April 29, 2016 | Current use: Residential | Permit id: Bld2015-08778 |