Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Master plan for map 158 (tm5365-3) phase 3 lots 1-5, 46-55 15 production units for harmony grove (seabreeze) see pds2015-tphspc-000022 for all clearances plan 1cr lot #3 2185 sq ft 2 story sfd 503 sq ft att fin garage porch sf, all elevations b-d covered breezeway - 73 sf all elevations b-d Date: August 28, 2015 Value: $318,200 Permit type: Tract models or prod units | Permit status: Issued | Permit id: Pds2015-Tphspm- | |||||
SCORE 99 Master plan for map 158 (tm5365-3) phase 3 lots 1-5, 46-55 15 production units for harmony grove (seabreeze) see pds2015-tphspc-000022 for all clearances plan 1cr lot #3 2185 sq ft 2 story sfd 503 sq ft att fin garage porch sf, all elevations b-d covered breezeway - 73 sf all elevations b-d Permit type: Tract models or prod units | Permit status: Issued | Permit id: Pds2015-Tphspm- | |||||
SCORE 89 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 5, 2016 Contractor: Generation 819 Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: March 2, 2017 Contractor: Sunpower Corporation Systems Permit type: Addn | Permit status: Completed | Completion date: April 11, 2017 | Permit id: Pds2017-Resalt- | |||||
Temporary power/tspb Date: March 3, 2017 Permit status: Fail | Permit id: Pds2015-Tphspm- | |||||
Foundation/steel/holdowns/abs/2nd Date: November 18, 2016 Permit status: Pass | Permit id: Pds2015-Tphspm- |